SECTION 5. NORTH BASIN PROJECTS<br />

TABLE 5-10<br />

NFE-C-0003 (Comite Road – Foster Road Sewer Area Upgrades – Phase I) – Pipeline Information<br />

US<br />

Node<br />

DS Node<br />

Length<br />

(ft)<br />

Existing<br />

Diameter<br />

(in)<br />

Proposed<br />

Diameter<br />

(in)<br />

Comments<br />

PS291 NS6193 3,340 4 8 New routing of existing<br />

FM to PS 246<br />

NS6193 NS6251 5,600 4 10<br />

PS94 NS6193 3,140 6 8<br />

Note: The existing pipe sizes and lengths were obtained from the BTRSSO hydraulic model.<br />

Total Bid Amount is $1,925,000.<br />

Design was appropriated in 2007.<br />

Construction Appropriation Year was 2008.<br />

Construction was Functionally Completed 2 nd Quarter 2010.<br />

GNV31031158552.DOCX/103470004 5-32 JANUARY 2011<br />

REV. 5