SECTION 3. SOUTH BASIN PROJECTS<br />

the components are assessed and appropriate methods recommended. At that time, the cost<br />

estimate for each project is revised. For those projects under construction, the bid amounts<br />

were included as construction costs in Table 3-1.<br />

TABLE 3-1<br />

Estimated Construction Costs for South Gravity System Comprehensive Rehabilitation Projects<br />

Project Description<br />

Estimated<br />

Construction<br />

Cost<br />

Scheduled Design<br />

Appropriation<br />

Year<br />

Scheduled<br />

Construction<br />

Appropriation Year<br />

Status<br />

SGC-R-0001a Bluebonnet<br />

Blvd-Jefferson Highway<br />

Phase I<br />

SGC-R-0001b Bluebonnet<br />

Blvd-Jefferson Highway<br />

Phase II<br />

SGC-R-0002a Airline<br />

Highway-Goodwood Blvd,<br />

Phase I<br />

SGC-R-0002b Airline<br />

Highway-Goodwood Blvd,<br />

Phase II<br />

SGC-R-0003 Ardenwood<br />

Drive-Winbourne Street<br />

SGC-R-0004 North 38 th<br />

Street-Gus Young Avenue<br />

SGL-R-0001 Burbank<br />

Drive – Gardere Lane<br />

SGL-R-0002 Staring Lane-<br />

Boone Drive<br />

SGL-R-0003 Kenilworth<br />

Blvd-Boone Drive<br />

SGU-R-0001 Oak Villa<br />

Blvd-Choctaw Street<br />

SGU-R-0002 Sharp Road-<br />

Florida Blvd<br />

SGU-R-0003 Flannery<br />

Road-Florida Blvd<br />

$6,700,000 2009* 2010* Design On-Going<br />

$6,700,000 2009* 2010* Design On-Going<br />

$11,900,000 2010* 2011 Not Started<br />

$11,900,000 2010* 2011 Not Started<br />

$4, 700,000 2011 2012 Not Started<br />

$3,600,000 2012 2013 Not Started<br />

$6,127,000 2008* 2008* Construction On-<br />

Going<br />

$5,417,000 2008* 2008* Functionally<br />

Complete<br />

$8,500,000 2009* 2009* Construction On-<br />

Going<br />

$8,997,000 2008* 2008* Construction On-<br />

Going<br />

$17,493,000 2009* 2009* Construction On-<br />

Going<br />

$7,900,000 2012 2013 Not Started<br />

*Appropriations already made for these projects (design and/or construction, as marked)<br />

GNV31031158547.DOCX/103440004 3-8 JANUARY 2011<br />