SECTION 5. NORTH BASIN PROJECTS<br />

TABLE 5-15<br />

NFW-C-0002 (Choctaw Storage and Pump Station Facility) – Pump Station Information<br />

PS No.<br />

Location<br />

Existing Max<br />

Capacity<br />

(GPM)<br />

Future Peak Wet<br />

Weather Flow<br />

(GPM)<br />

Dry<br />

Weather<br />

(GPM)<br />

PS51A<br />

PS51AA<br />

Sierra Vista Drive north of the intersection with<br />

Cuyhanga Parkway<br />

Near the intersection of Red Oak Drive and<br />

Sharp Lane<br />

New 8,333 0<br />

New 3,125 0<br />

PS 52A<br />

NE of Brookstown Drive intersection with<br />

Winbourne<br />

New 31,924 0<br />

Note: The future peak wet weather flow was obtained from the BTRSSO hydraulic model.<br />

TABLE 5-16<br />

NFW-C-0002 (Choctaw Storage and Pump Station Facility) – Forcemain Information<br />

US No.<br />

DS Node<br />

Length<br />

(ft)<br />

Existing<br />

Diameter<br />

(in)<br />

Proposed<br />

Diameter<br />

(in)<br />

PS52A Choctaw Storage 10,100 New 42<br />

PS51A PS51WW1 130 New 30<br />

PS51WW1 Choctaw Storage 10,780 New 30<br />

PS51AA PS51WW1 3,100 New 14<br />

Note: The new pipe lengths were obtained from the BTRSSO hydraulic model.<br />

Total Construction Bid Amount is $55,000,000.<br />

Total Storage Facility Land Acquisition Cost is $1,218,720 (already acquired).<br />

Scheduled Design Appropriation Year was 2008.<br />

Scheduled Construction Appropriation Year was 2010.<br />

Design is On-Going.<br />

GNV31031158552.DOCX/103470004 5-48 JANUARY 2011<br />

REV. 5