SECTION 3. SOUTH BASIN PROJECTS<br />

3.2.12 SGC-C-PS58FM-C (Staring Lane FM-Phase III – Perkins Road to PS 58)<br />

Project Description<br />

Purpose of the Project/Project Background<br />

The SGC-C-PS58FM-C (Staring Lane FM-Phase III – Perkins Road to PS 58) project involves<br />

the construction of a portion of the new forcemain from the PS 58 to the South WWTP. The<br />

purpose of this project is to relieve SSOs at PS 58 as well as in the respective upstream and<br />

downstream basins. The construction of the direct forcemain between PS 58 and the South<br />

WWTP alleviates the wet weather flows into existing downstream gravity pipe, and allows<br />

the capacity needed for future flows in the Staring Lane area.<br />

The project includes replacing an existing 36-inch aerial forcemain crossing of Ward’s Creek<br />

from PS 58. The purpose is to replace the aerial crossing with a subsurface crossing due to<br />

the condition of the forcemain.<br />

Location<br />

This portion of the new 60-inch forcemain starts approximately at the intersection of Essen<br />

Lane and Essen Park and proceeds in a southerly direction crossing Ward’s Creek. The<br />

forcemain then proceeds in an easterly direction along Ward’s Creek. The forcemain turns<br />

south and follows Mancuso Lane, crossing a Kansas City Southern Railroad at the<br />

intersection of Anselmo Lane. The forcemain continues south along Granada Drive until<br />

reaching Dawson’s Creek. At Dawson’s Creek, the forcemain turns in a westerly direction<br />

and continues to the intersection of Dawson’s Creek and Staring Lane near PS57.<br />

The 36-inch forcemain starts approximately at the intersection of Essen Lane and Essen Park<br />

and proceeds in a southerly direction crossing Ward’s Creek. The new forcemain will be<br />

connected to the existing forcemain on the south side of Ward’s Creek.<br />

Scope<br />

The scope of this project is shown in Table 3-9 and in Figure 3-20.<br />

TABLE 3-9<br />

SGC-C-PS58FM-C (Staring Lane FM-Phase III – Perkins Road to PS 58) – Pipeline Information<br />

US Node<br />

DS Node<br />

Length<br />

(ft)<br />

Existing<br />

Diameter<br />

(in)<br />

Proposed<br />

Diameter<br />

(in)<br />

Comments<br />

PS58 Dawson Creek 9,490 New 60<br />

PS58<br />

South Side of<br />

Ward’s Creek<br />

300 36 36<br />

Note: The pipe lengths were obtained from the BTRSSO hydraulic model.<br />

Total Construction Bid Amount is $9,600,000.<br />

Scheduled Design Appropriation Year was 2009.<br />

Construction Appropriation Year was 2010.<br />

Design is On-Going.<br />

GNV31031158547.DOCX/103440004 3-46 JANUARY 2011<br />