SECTION 5. NORTH BASIN PROJECTS<br />

5.4.10 NFW-C-0003 (Choctaw Storage Pump Station)<br />

Project Description<br />

This project has been deleted and combined with NFW-C-0002 (Choctaw Storage, PS 52A, PS<br />

51A, PS 51AA, and Forcemains) from the October 2008 PDP and the combined project has<br />

been designated as the NFW-C-0002 (Choctaw Storage and Pump Station Facility) and is<br />

described in Section 5.4.9.<br />

5.4.11 NFW-C-0004 (Hooper Storage Facility)<br />

Project Description<br />

Purpose of the Project/Background Information<br />

The NFW-C-0004 (Hooper Storage Facility) project involves the design and construction of a<br />

10-MG storage facility (Hooper Storage Facility) in northwest Baton Rouge Parish as well as<br />

the replacement of BPS 897 with a wet well pump station. The purpose of this facility is to<br />

detain peak wet weather flows during a storm event, and release them back into the collection<br />

system when demand is lower.<br />

Construction of the storage facility will eliminate the need for approximately 13,200 feet of<br />

pipe replacement, reduce the overall pipe diameter for the remaining sewer projects, and<br />

eliminate the need to increase the capacity of the North WWTP.<br />

Location<br />

The proposed location of the storage facility is near the northwest corner of the intersection<br />

of Hooper Drive (Highway 408) and Mickens Road and is shown in Figure 5-18.<br />

Scope<br />

The project scope includes the design and construction of the storage facility and associated<br />

pumping systems to transfer flows in and out of the facility. A new PS 897 will be built on<br />

the same site as the storage facility to transfer flows in and out of the facility. Once the<br />

storage facility and pump station are operational, BPS 897 will be abandoned.<br />

Total Construction Bid Amount is $19,100,000.<br />

Scheduled Design Appropriation Year was 2009.<br />

Scheduled Construction Appropriation Year was 2010.<br />

Design is On-Going.<br />

GNV31031158552.DOCX/103470004 5-50 JANUARY 2011<br />

REV. 5