SECTION 3. SOUTH BASIN PROJECTS<br />
Gravity segment 031-00112 to PS 31 starts southeast of the Fairhaven Drive and Woodcliff<br />
Drive intersection. The gravity line travels west until reaching 031-00102, south until<br />
reaching 031-00102A, and then southwest until reaching PS 31. PS 31 is located southeast of<br />
the Westbrook Drive and Goodwood Blvd intersection.<br />
Gravity segment 031-00270 to 031-00112 starts northeast of the East Robinhood Drive and<br />
Woodcliff Drive intersection. The gravity segment travels south until reaching 031-00112,<br />
located southeast of the Fairhaven Drive and Woodcliff Drive intersection.<br />
Gravity segment 031-00299 to 031-00289 starts southeast of the Arlingford Avenue and<br />
Shelby Drive intersection The gravity line travels south until reaching 031-00289, located<br />
northeast of the Archery Drive and Woodcliff Drive intersection.<br />
Gravity segment 031-00330 to 031-00299 starts east of the Norma Court and Shelby Drive<br />
intersection. The gravity line travels south until reaching 031-00299, located southeast of the<br />
Arlingford Avenue and Shelby Drive intersection.<br />
Gravity segment 031-00330A to 031-00330 starts southeast of the Shelby Drive and Florida<br />
Blvd intersection. The gravity line travels south until reaching 031-00330, located east of the<br />
Norma Court and Shelby Drive intersection.<br />
Forcemain segment PS21FM to 031-00330A starts near Florida Boulevard. The forcemain<br />
segment travels south until reaching 031-00330A, located southeast of the Shelby Drive and<br />
Florida Blvd intersection.<br />
Scope<br />
The scope of this project is shown in Table 3-2. This project includes the construction of<br />
approximately 8,400 feet of 15-inch, 21-inch, 24-inch, and 36-inch gravity sewer upstream of<br />
PS 50, approximately 950 feet of 12-inch and 15-inch gravity sewer upstream of PS 13,<br />
approximately 2,100 feet of 18-inch gravity sewer upstream of PS 21, approximately 2,000<br />
feet of 10-inch gravity sewer upstream of PS 101, and approximately 13,800 feet of 10-inch,<br />
12-inch, 15-inch, 18-inch, 21-inch, 24-inch, and 36-inch gravity sewer and forcemain<br />
upstream of PS 31.<br />
TABLE 3-2<br />
SGU-C-0003 (Sherwood Forest Blvd-Goodwood Blvd Pipeline Improvements) – Pipeline Information<br />
US Node<br />
DS Node<br />
Length<br />
(ft)<br />
Existing<br />
Diameter<br />
(in)<br />
Proposed<br />
Diameter<br />
(in)<br />
050-00619 050-00682 1,000 15 24<br />
050-00480 050-00924 2,000 8 and 12 15<br />
050-00400A 050-00837 2,800 18 36<br />
050-00392 050-00280 2,400 12 21<br />
050-00280 050-00272 1,200 15 or 18 24<br />
013-00002 013-00001 150 8 12<br />
Comments<br />
013-00049 PS13 800 8 and 10 15 PS Replacement under SGC-C-0001<br />
(Florida Blvd PS Improvements)<br />
021-00009 PS21 2,100 12 and 15 18 Crosses Florida Blvd; PS will be<br />
upgraded in SGC-C-0001 (Florida<br />
Blvd PS Improvements)<br />
GNV31031158547.DOCX/103440004 3-25 JANUARY 2011<br />
REV. 5