SECTION 3. SOUTH BASIN PROJECTS<br />

3.2.14 SGL-C-0001 (Essen/Staring Area PS 57 Improvements)<br />

Project Description<br />

This project has been deleted from the PDP.<br />

3.2.15 SGL-C-0002 (Multiple PSs – Highland Road – Kenilworth Parkway)<br />

Project Description<br />

Purpose of the Project / Project Background<br />

The SGL-C-0002 (Multiple Pump Stations – Highland Road – Kenilworth Parkway) project<br />

includes the replacement of PS 120, PS 329, PS 40, PS 56, PS 68, PS 102, PS 27, PS 74, and PS<br />

302, and the construction of a new PS 53A (overflow for the existing PS 53) and a new LSU PS.<br />

The new pump stations will work in conjunction with forcemain upgrades in other south<br />

lower basin projects to alleviate SSOs at and near the pump stations and in their respective<br />

upstream basins. The BTRSSO hydraulic model also predicts that these pump stations will<br />

exceed their existing capacities at the predicted future peak wet weather flows. PS 102 was<br />

originally slated as a master plan pump station but was added to this PDP project. PS 27, PS<br />

74, and PS 302 have been added to this project since the October 2008 PDP.<br />

Location<br />

The locations of the pump stations are shown in Table 3-12 and in Figure 3-22.<br />

Scope<br />

The scope of the project is shown in Table 3-12. All pump stations except PS 53A are<br />

replacements of existing pump stations. PS 53A is a new overflow pump station for PS 53,<br />

which will alleviate upstream overflows and not require PS 53 to be upsized. PS 53A will have<br />

a dedicated forcemain, described in the SGL-C-0003 (Highland Road Pipeline Improvements)<br />

project, through which it will pump to the manifold with the new forcemain from PS 58A,<br />

described in the SGC-C-PS58FM-B (Staring Lane FM-Phase II – Highland Road to Perkins<br />

Road) project.<br />

TABLE 3-12<br />

SGL-C-0002 (Multiple Pump Stations - Highland Road - Kenilworth Parkway) – Pump Station Information<br />

PS No.<br />

Location<br />

Existing Max.<br />

Capacity<br />

(GPM)<br />

Future Peak Wet<br />

Weather Flow<br />

(GPM)<br />

Dry Weather<br />

(GPM)<br />

PS 120<br />

PS 329<br />

PS 40<br />

PS 53A<br />

PS 56<br />

PS 68<br />

PS 102<br />

Helvetia Drive, near the intersection of<br />

Bancroft Way<br />

Kenilworth Parkway, near the intersection<br />

of Burbank Drive<br />

Southlawn Drive, near the intersection of<br />

Arcadia Drive<br />

Boone Avenue, near the intersection of<br />

Chippenham Drive<br />

Chandler Drive, near the intersection of<br />

Highland Park Drive<br />

Burbank Drive, near the intersection of<br />

Jennifer Jean Drive<br />

GSRI Avenue, near the intersection of<br />

Jasper Avenue<br />

200 511 92<br />

450 1,224 196<br />

400 802 117<br />

6,041 9,716 N/A<br />

600 4,740 573<br />

350 1,136 385<br />

430 897 356<br />

GNV31031158547.DOCX/103440004 3-50 JANUARY 2011<br />

REV. 5