SECTION 4. CENTRAL BASIN PROJECTS<br />

4.2.4 CGN-C-0004 (Downtown Area –PS 59 Improvements)<br />

The CGN-C-0004 project has been combined with CGN-C-0005 (Downtown Area - PS 15, PS<br />

19, PS 59, and PS 60 Improvements) from the October 2008 PDP. The combined project has<br />

been designated CGN-C-0005 (Downtown Area Pump Station Improvements) and is<br />

described in Section 4.2.5.<br />

4.2.5 CGN-C-0005 (Downtown Area Pump Station Improvements)<br />

Project Description<br />

Purpose of the Project/Project Background<br />

The CGN-C-0005 (Downtown Area Improvements) project includes the upgrade of PS 15, PS<br />

19, and PS 59 to alleviate SSOs at and near the PSs as well as in their respective upstream<br />

basins. This project is the combination of CGN-C-0005 (Downtown Area – PS515, PS519, and<br />

PS 59 Improvements) and CGN-C-0004 (Downtown Area – PS 59 Improvements) from the<br />

October 2008 PDP. The combined project has been designated CGN-C-005 (Downtown Area<br />

Pump Stations) and is described in the rest of this section.<br />

The BTRSSO hydraulic model also predicts a PS capacity exceedance for the future peak wet<br />

weather flow. PS 15, PS 19, and the existing PS 60 will utilize the new forcemains outlined in<br />

the project CGN-C-0001 (Capital Lake Drive – Gayosa Street). PS 59 was added to this<br />

project in 2009 because of the similarity of the project and proximity to the other pump<br />

stations included in this project. During design, it was discovered that PS 59 could be<br />

rehabilitated by installing new pumps rather than completely replacing the entire pump<br />

station.<br />

Location<br />

The locations of PS 15, PS 19, and PS 59 are given in Table 4-4 and in Figure 4-12.<br />

Scope<br />

The scope of this project is shown in Table 4-4.<br />

TABLE 4-4<br />

CGN-C-0005 (Downtown Area Pump Station Improvements) – Pump Station Information<br />

Existing Max<br />

Capacity<br />

(GPM)<br />

PS No.<br />

PS 15<br />

PS 19<br />

PS 59<br />

(rehab)<br />

Location<br />

Washington Street, near intersection of<br />

West Belfair Drive<br />

Eiland Drive, near intersection of 4th<br />

Street<br />

Near the intersection of River Road and<br />

South Blvd.<br />

Future Peak Wet<br />

Weather Flow<br />

(GPM)<br />

Dry<br />

Weather<br />

(GPM)<br />

694 4,014 799<br />

417 1,493 193<br />

7,777 26,665 4,570<br />

Note: The existing maximum capacities for the PSs were obtained from the DPW Field Pump Station<br />

Maintenance reference guide. The future peak wet weather flow was obtained from the BTRSSO hydraulic<br />

model.<br />

Total Construction Bid Amount is $4,841,000.<br />

Scheduled Design Appropriation Year was 2008.<br />

Scheduled Construction Appropriation Year was 2010.<br />

Construction Underway.<br />

GNV31031158548.DOCX/103440008 4-25 JANUARY 2011<br />

REV. 5