SECTION 3. SOUTH BASIN PROJECTS<br />

TABLE 3-13<br />

SGL-C-0003 (Highland Road Pipeline Improvements) – Pipeline Information<br />

US Node<br />

DS Node<br />

Length<br />

(ft)<br />

Existing<br />

Diameter<br />

(in)<br />

Proposed<br />

Diameter<br />

(in)<br />

Comments<br />

053-00010A 053-00003 2,400 24 36 This segment includes a canal<br />

crossing.<br />

053-00429 053-00410 1,800 12 18<br />

068-00050 PS68 1,200 10 18<br />

PS 329 PS329DS 4,300 8 10 Forcemain – PS 329 replacement is<br />

described in SGL-C-0002 (Multiple PS<br />

– Highland Road – Kenilworth<br />

Parkway)<br />

PS 53A<br />

Manifold point<br />

with Staring<br />

Lane FM (PS<br />

58A FM)<br />

6,220 New 24 New forcemain from new PS 53A,<br />

which is described in SGL-C-0002<br />

(Multiple PS – Highland Road –<br />

Kenilworth Parkway)<br />

PS56FM PS56DS 540 12 18 Forcemain from PS 56 (see Project<br />

SGL-C-0002 (Multiple PS – Highland<br />

Road – Kenilworth Parkway) for PS<br />

description)<br />

Note: The existing pipe sizes and lengths and new pipe lengths were obtained from the BTRSSO hydraulic model.<br />

Total Construction Bid Amount is $17,800,000.<br />

Scheduled Design Appropriation Year is 2010.<br />

Scheduled Construction Appropriation Year is 2012.<br />

Design and Construction has not Started.<br />

GNV31031158547.DOCX/103440004 3-57 JANUARY 2011<br />