SECTION 5. NORTH BASIN PROJECTS<br />

Gravity segment 080-00011 to PS 80 begins at Manhole 080-00011, which is located in a<br />

drainage path north of Kleinpeter Road between its intersections with St. Peter Avenue and<br />

St. Claude Avenue. The segment travels south to PS 80, which is on Kleinpeter Avenue.<br />

Forcemain segment PS 38 to PS 38DS runs from PS 38, located at the south end of Constance<br />

Street, in an easterly direction through a servitude that parallels Desoto Drive to manhole PS<br />

38DS, located near the intersection of Rebecca Lynn Avenue and Hallmark Drive.<br />

Forcemain segment PS 244FM to PS 244DS begins at PS 244, located on General Chennault<br />

Drive, near the Baton Rouge Metropolitan Airport, and follows General Chennault Drive<br />

south for approximately 1,195 feet. At this location, the forcemain turns west and runs<br />

through an open field, crosses Veterans Memorial Blvd, and continues west through an open<br />

field to Edwin Street. The force main runs south on Edwin Street until it is just south of North<br />

Lark street where it runs west underneath I-110 and continues west midway between North<br />

Lark Street and Lark Street crossing Wilbur street. At the end of Lark street the force main<br />

turns south and crosses Scotlandville Lateral and continues along the south side of<br />

Scotlandville lateral in a northwest direction until the west side of the Chevron gas pipeline<br />

ROW. At the west side of the gas pipeline ROW the force main runs south for approximately<br />

434 ft. The force main then turns west and terminates at manhole 044-00118, located near the<br />

intersection of Jones Street and Robin Drive.<br />

Forcemain segment PS 63FM to PS 63DS starts at PS 63, located on Georgia Street, in between<br />

Groom Road and Harding Street, and runs south along Georgia Street for approximately 115<br />

feet to its termination point at manhole PS 63DS.<br />

Scope<br />

This project includes approximately 9,400 feet of 12-inch, 24-inch, 27-inch, 30-inch, and 42-<br />

inch gravity sewer upstream of PS 45, approximately 2,600 feet of 12-inch, 15-inch, and 21-<br />

inch gravity sewer upstream of PS 127, approximately 2,300 feet of 12-inch, 18-inch, and 24-<br />

inch gravity sewer upstream of PS 44, approximately 1,500 feet of 12-inch, and 15-inch<br />

gravity sewer upstream of PS 244, and approximately 330 feet of 15-inch gravity sewer<br />

upstream of PS 80. This project also includes replacement of forcemains from PS 38, PS 244,<br />

and PS 63. Table 5-2 shows the detailed scope of this project.<br />

TABLE 5-2<br />

NGS-C-0002 (<strong>Plan</strong>k Road – Kleinpeter Road Sewer Area Upgrades) – Pipeline Information<br />

US Node<br />

DS Node<br />

Length<br />

(ft)<br />

Existing<br />

Diameter<br />

(in)<br />

Proposed<br />

Diameter<br />

(in)<br />

Comments<br />

045-00039 045-0026 3,160 12 24<br />

045-00026 045-00020 840 12 & 18 24<br />

045-00020 045-00007 2,600 18 27<br />

045-00007 045-00001 1,500 18 30<br />

045-00001 PS 45 65 18 42<br />

045-00043 045-00020 1,200 8 12<br />

PS38DS 127-00020 100 8 12<br />

127-00020 127-00015A 970 8 & 12 15<br />

GNV31031158552.DOCX/103470004 5-12 JANUARY 2011<br />

REV. 5