SECTION 5. NORTH BASIN PROJECTS<br />
Gravity segment 080-00011 to PS 80 begins at Manhole 080-00011, which is located in a<br />
drainage path north of Kleinpeter Road between its intersections with St. Peter Avenue and<br />
St. Claude Avenue. The segment travels south to PS 80, which is on Kleinpeter Avenue.<br />
Forcemain segment PS 38 to PS 38DS runs from PS 38, located at the south end of Constance<br />
Street, in an easterly direction through a servitude that parallels Desoto Drive to manhole PS<br />
38DS, located near the intersection of Rebecca Lynn Avenue and Hallmark Drive.<br />
Forcemain segment PS 244FM to PS 244DS begins at PS 244, located on General Chennault<br />
Drive, near the Baton Rouge Metropolitan Airport, and follows General Chennault Drive<br />
south for approximately 1,195 feet. At this location, the forcemain turns west and runs<br />
through an open field, crosses Veterans Memorial Blvd, and continues west through an open<br />
field to Edwin Street. The force main runs south on Edwin Street until it is just south of North<br />
Lark street where it runs west underneath I-110 and continues west midway between North<br />
Lark Street and Lark Street crossing Wilbur street. At the end of Lark street the force main<br />
turns south and crosses Scotlandville Lateral and continues along the south side of<br />
Scotlandville lateral in a northwest direction until the west side of the Chevron gas pipeline<br />
ROW. At the west side of the gas pipeline ROW the force main runs south for approximately<br />
434 ft. The force main then turns west and terminates at manhole 044-00118, located near the<br />
intersection of Jones Street and Robin Drive.<br />
Forcemain segment PS 63FM to PS 63DS starts at PS 63, located on Georgia Street, in between<br />
Groom Road and Harding Street, and runs south along Georgia Street for approximately 115<br />
feet to its termination point at manhole PS 63DS.<br />
Scope<br />
This project includes approximately 9,400 feet of 12-inch, 24-inch, 27-inch, 30-inch, and 42-<br />
inch gravity sewer upstream of PS 45, approximately 2,600 feet of 12-inch, 15-inch, and 21-<br />
inch gravity sewer upstream of PS 127, approximately 2,300 feet of 12-inch, 18-inch, and 24-<br />
inch gravity sewer upstream of PS 44, approximately 1,500 feet of 12-inch, and 15-inch<br />
gravity sewer upstream of PS 244, and approximately 330 feet of 15-inch gravity sewer<br />
upstream of PS 80. This project also includes replacement of forcemains from PS 38, PS 244,<br />
and PS 63. Table 5-2 shows the detailed scope of this project.<br />
TABLE 5-2<br />
NGS-C-0002 (<strong>Plan</strong>k Road – Kleinpeter Road Sewer Area Upgrades) – Pipeline Information<br />
US Node<br />
DS Node<br />
Length<br />
(ft)<br />
Existing<br />
Diameter<br />
(in)<br />
Proposed<br />
Diameter<br />
(in)<br />
Comments<br />
045-00039 045-0026 3,160 12 24<br />
045-00026 045-00020 840 12 & 18 24<br />
045-00020 045-00007 2,600 18 27<br />
045-00007 045-00001 1,500 18 30<br />
045-00001 PS 45 65 18 42<br />
045-00043 045-00020 1,200 8 12<br />
PS38DS 127-00020 100 8 12<br />
127-00020 127-00015A 970 8 & 12 15<br />
GNV31031158552.DOCX/103470004 5-12 JANUARY 2011<br />