SECTION 3. SOUTH BASIN PROJECTS<br />

TABLE 3-21B<br />

SFL-C-0006 (Phase B - Nicholson Drive – Highland Road – Perkins Road Capacity Improvements) –<br />

Pipeline Information<br />

US Node<br />

DS Node<br />

Length<br />

(ft)<br />

Existing<br />

Diameter<br />

(in)<br />

Proposed<br />

Diameter<br />

(in)<br />

PS 259 SS340 1,650 6 8<br />

PS 278FM SS459 2,600 5 8<br />

Comments<br />

365-01007 365-00001Z 2,200 18 24 Gravity sewer<br />

PS 365FM SS444 50 10 14<br />

SS444 SS471 4,700 14 16<br />

PS 398 SS502 3,100 8 10<br />

SS502 SS489 1,900 8 12<br />

PS378 Old Perkins 1,850 6<br />

SS451A Old Perkins 750 6<br />

SS489 BPS514 11,400 24<br />

PS 253 SS370 4000 6 8<br />

PS 229FM SS400 1,700 6 8<br />

PS336 PS311 2,177 10<br />

PS311 236-00085A 2,711 12<br />

236-00002 PS 236 260 12 21 Gravity sewer<br />

236-00055 236-00002 510 12 21 Gravity sewer<br />

236-00055 236-00073A 1,210 21 Gravity sewer<br />

236-00073A 236-00085A 945 18 Gravity sewer<br />

PS236 PS505A 7,127 16<br />

PS505 PS505A 469 20<br />

PS505A 50504 391 20<br />

Note: The existing pipe sizes and lengths were obtained from the BTRSSO hydraulic model.<br />

Total Construction Bid Amount (Phase A and B) is $11,400,000.<br />

Scheduled Design Appropriation Year was 2009.<br />

Scheduled Construction Appropriation Year is 2011.<br />

Design is on-going.<br />

GNV31031158547.DOCX/103440004 3-83 JANUARY 2011<br />

REV. 5