SECTION 5. NORTH BASIN PROJECTS<br />

TABLE 5-4<br />

Estimated Construction Costs for North Forced System Comprehensive Rehabilitation Projects<br />

Project Descriptions<br />

Construction<br />

Cost<br />

Scheduled Design<br />

Appropriation Year<br />

Scheduled<br />

Construction<br />

Appropriation Year<br />

Status<br />

NFW-R-0001a-<br />

Brookstown Road-<br />

Evangeline Street,<br />

Phase I<br />

NFW-R-0001b-<br />

Brookstown Road –<br />

Evangeline Street,<br />

Phase II<br />

NFW-R-0002-Interstate<br />

110-Hollywood Street<br />

NFE-R-0001-Silverleaf<br />

Road-Ford Street<br />

$12,100.000 2009* 2010* Construction<br />

On-Going<br />

$11,000,000 2009* 2010* Design On-<br />

Going<br />

$6,000,000 2011 2012 Not Started<br />

$10,500,000 2009* 2010* Design On-<br />

Going<br />

*Appropriations already made for these projects (design and/or construction, as marked)<br />