SECTION 3. SOUTH BASIN PROJECTS<br />

3.2.8 SGC-C-0003 (Essen Lane - Interstate 12)<br />

The SGC-C-0003 (Essen Lan – Interstate 12) project has been combined with SGC-C-0002<br />

(Airline Highway - Jefferson Highway) project and SGU-C-0002 (Airline Highway -<br />

Interstate 12) project from the October 2008 PDP. The combined project has been designated<br />

SGC-C-0002 (Airline Highway Pipeline Improvements) project, and is described in Section<br />

3.2.7.<br />

3.2.9 SGC-C-PS58A (Pump Station 58 Replacement)<br />

Project Description<br />

Purpose of the Project/Project Background<br />

The SGC-C-PS58A (Pump Station 58 Replacement) project includes the construction of a<br />

new overflow pump station pump station (PS 58) that will handle the existing flow<br />

conditions and the predicted future wet weather peak flow. The design of a single pump<br />

station was selected as the best design option to meet the long-term needs of the C-P and the<br />

sensitive environmental and aesthetic concerns of the surrounding area. (<br />

The purpose of this project is to relieve SSOs at PS 58 as well as in the respective upstream<br />

and downstream basins. This project is related to SGC-C-PS58FM-A (Staring Lane FM Phase<br />

I – Burbank to Highland), SGC-C-PS58FM-B (Staring Lane FM - Phase II – Highland to<br />

Perkins), and SGC-C-PS58FM-C (Staring Lane FM - Phase III – Perkins to PS58) which<br />

involve the construction of the forcemain from PS 58 to the South WWTP.<br />

Location<br />

The project site and existing PS 58 are located at the entrance of the Louisiana State<br />

University Burden Center. The location of PS 58 is shown in Table 3-6 and in Figure 3-17.<br />

Scope<br />

The current PS 58 will not have enough pumping capacity to handle the predicted future<br />

wet weather peak flow. PS 58 shall be replaced with a pump station that will handle both<br />

the existing flow conditions and future wet weather peak flow conditions. The pump station<br />

will pump flow into the downstream gravity system when flows do not exceed 20,870 gpm.<br />

When flows exceed 20,870 gpm, the pump station will pump the excess flow directly to the<br />

South WWTP. The proposed scope is shown in Table 3-6.<br />

TABLE 3-6<br />

SGC-C-PS58A (Pump Station 58 Replacement) – Pump Station Information<br />

Existing Max.<br />

Capacity<br />

PS No.<br />

Location<br />

(GPM)<br />

Future Peak Wet<br />

Weather Flow<br />

(GPM)<br />

Dry Weather<br />

Flow<br />

(GPM)<br />

PS58 Intersection of Essen Lane and Essen Park New 61,107 208,700<br />

Note: The future peak wet weather flow was obtained from the BTRSSO hydraulic model.<br />

Total Construction Bid Amount is $15,800,000.<br />

Scheduled Design Appropriation Year was 2009.<br />

Construction Appropriation Year was 2010.<br />

Design is On-Going<br />

GNV31031158547.DOCX/103440004 3-40 JANUARY 2011<br />

REV. 5