SECTION 3. SOUTH BASIN PROJECTS<br />

3.1 South Gravity System Comprehensive Rehabilitation<br />

Projects<br />

3.1.1 SGC-R-0001a, SCG-R-001b, SGC-R-0002a, SGC-R-0002b, SGC-R-0003, SGC-<br />

R-0004, SGL-R-0001, SGL-R-0002, SGL-R-0003, SGU-R-0001, SGU-R-0002,<br />

SGU-R-0003<br />

Project Description<br />

The sanitary sewer system comprehensive rehabilitation projects consist of improvements to<br />

various components of the collection system to reduce the amount of I/I that enter into the<br />

system.<br />

Purpose<br />

The purpose of comprehensive sewer rehabilitation is to correct defects in the system such<br />

as offset pipe joints, collapsed pipe sections, leaking manholes, and direct inflow sources.<br />

The water that enters the system through the defects is a major contributor to sanitary sewer<br />

overflows. Comprehensive rehabilitation of the collection system will contribute to<br />

alleviating sanitary sewer overflows by reducing infiltration and inflow.<br />

Location<br />

There are 12 projects located primarily within the South Gravity Basin. The locations of the<br />

projects are shown on the maps following this section (Figures 3-3 through 3-12).<br />

Scope of Project<br />

The first phase of comprehensive rehabilitation projects will be the physical inspection of<br />

the pipes and manholes including closed circuit television (CCTV) inspection of all pipes.<br />

Smoke testing will also be included in the physical inspection phase.<br />

The data collected by the physical inspection contractor will be analyzed and, based on that<br />

analysis, a listing of recommended repairs with associated construction costs will be<br />

generated.<br />

An engineering firm will then complete preparation of construction documents for project<br />

bidding.<br />

The construction of comprehensive rehabilitation projects will typically include the<br />

following components.<br />

<br />

<br />

<br />

<br />

<br />

Replacement of pipes<br />

Point repair of pipes<br />

Rehabilitation of pipes by cured in place liners<br />

Rehabilitation or replacement of sewer manholes<br />

Repair of sewer laterals to the property line<br />

Cost<br />

The estimated construction cost for each project is presented in Table 3-1. These costs are<br />

based on preliminary estimates of the amounts of each component of the system that will<br />

require repair or replacement. During the physical inspection phase, the actual condition of<br />

GNV31031158547.DOCX/103440004 3-7 JANUARY 2011<br />