SECTION 4. CENTRAL BASIN PROJECTS<br />

4.2.10 CGS-C-0005 (Stanford Avenue – Ferndale Avenue)<br />

Project Description<br />

This project was combined with project CGS-C-0004 (Highland Road – Buchanan Street) due<br />

to deletion of large gravity sewer because of the Central Consolidation projects and has been<br />

designated CGS-C-0004 (Highland Road – Buchanan Street Area Sewer Upgrades) and is<br />

described in Section 4.2.9<br />

4.2.11 CGS-C-0006 (Government Street – South Acadian Thruway Sewer Area<br />

Upgrades)<br />

Project Description<br />

Purpose of the Project/Project Background<br />

Project CGS-C-0006 (Government Street – South Acadian Thruway Sewer Area Upgrades)<br />

includes the upgrade of gravity sewers upstream of PS 3 and PS 4 to alleviate SSOs in the<br />

vicinity. Sections of gravity sewer that were to be upgraded as part of this project in the<br />

January 2008 PDP have been deleted due to hydraulic modeling improvements.<br />

Location<br />

The gravity segments in this project are shown in Figure 4-14.<br />

The project begins near the intersection of Westdale Drive and College Drive. The new<br />

gravity line follows College Drive until reaching Ward’s Creek. The gravity line turns<br />

northwest, paralleling Wards Creek along the edge of Webb Golf Course (BREC) and<br />

continues to Claycut Drive. The gravity line turns northeast and continues along Claycut<br />

Drive to PS 4.<br />

Segment 2 begins north of Government Street and parallels the eastside of Ward’s Creek for<br />

approximately 300 feet. The gravity line crosses Government Street, and follows along<br />

Mouton Street to Capital Heights Ave. The line then turns east along Capital Heights until<br />

the intersection with Hebert Street. The line turns south following Hebert Street and then<br />

paralleling Ward’s Creek. The gravity line crosses Ward’s Creek and terminates at PS 4.<br />

Segment 3 starts near Florida Blvd and Kernan Avenue intersection. The gravity line travels<br />

south along Beverly Drive, crosses Government Street and routes through the<br />

Westmoreland Shopping Center. The line then crosses Dawson’s Creek and parallels<br />

Dawson’s Creek along the east side of Catholic High School. The line crosses Dawson’s<br />

Creek on the north side of Claycut Drive and terminates on the east side of the creek.<br />

Segment 4 starts near the Government Street and Beverly Drive intersection. The gravity<br />

line travels west east along Government Street terminating at the intersection of<br />

Westmoreland Drive and Government Street.<br />

Segment 5 starts north of the Myrtle Avenue and Marwede Avenue intersection. The gravity<br />

line travels north until reaching Claycut Drive. The gravity line travels east tying into<br />

Segment 3.<br />

Scope<br />

The project includes approximately 12,000 feet of new gravity sewer pipe ranging in<br />

diameter from 8 inches to 27 inches.<br />

GNV31031158548.DOCX/103440008 4-31 JANUARY 2011<br />

REV. 5