SECTION 3. SOUTH BASIN PROJECTS<br />

3.2.13 SGC-C-PS119 (Citiplace/Essen Area PS 119 and Forcemain Improvements)<br />

Project Description<br />

Purpose of the Project/Project Background<br />

The SGC-C-PS119 (Citiplace/Essen Area PS 119 and Forcemain Improvements) project<br />

includes the construction of both 8,100 feet of new 16-inch forcemain from PS 119 to PS 58<br />

and the upgrade of PS 119 due to the longer forcemain and the predicted increase in future<br />

peak wet weather flow.<br />

Location<br />

Figure 3-21 shows the scope of this project. PS 119 is located on the north side of Highway I-<br />

10 on the western side of the creek near the movie theater and Citiplace Drive.<br />

A new 16-inch forcemain will replace the existing 12-inch forcemain extending from PS 119<br />

to MH 058-00194T. From MH 058-00194T, an existing 16-inch forcemain will be utilized. The<br />

existing forcemain follows Ward’s Creek to MH 058-00129T. At MH 058-00129T, a new 16-<br />

inch forcemain will be connected to the existing forcemain and continue to follow Ward’s<br />

Creek until nearing the intersection of Essen Lane and Ward’s Creek. At this point, the<br />

forcemain will turn in a northerly direction and connect to PS 58.<br />

Scope<br />

The scope of the project is shown in Tables 3-10 (pump station scope) and 3-11 (forcemain<br />

scope).<br />

TABLE 3-10<br />

SGC-C-PS119 (Citiplace/Essen Area PS 119 and Forcemain Improvements) – Pump Station Information<br />

PS No.<br />

Location<br />

Existing Max.<br />

Capacity<br />

(GPM)<br />

Future Peak Wet<br />

Weather Flow<br />

(GPM)<br />

Dry<br />

Weather<br />

(GPM)<br />

PS 119 Citiplace Drive near the Movie Theater 2,430 2,700 594<br />

Note: The existing maximum capacities for the PSs were obtained from the DPW Field Pump Station<br />

Maintenance reference guide. The future peak wet weather flow was obtained from the BTRSSO hydraulic<br />

model.<br />

TABLE 3-11<br />

SGC-C-PS119 (Citiplace/Essen Area PS 119 and Forcemain Improvements) – Pipeline Information<br />

US<br />

Node<br />

DS Node<br />

Length<br />

(ft)<br />

Existing<br />

Diameter<br />

(in)<br />

Proposed<br />

Diameter<br />

(in)<br />

Comments<br />

PS 119 PS58 8,100 New 16 New forcemain segments (PS 119 to<br />

058-00194T and 058-00129T to PS 58)<br />

Note: The pipe lengths were obtained from the BTRSSO hydraulic model.<br />

Total Construction Bid Amount is $2,800,000.<br />

Scheduled Design Appropriation Year was 2008.<br />

Construction Appropriation Year was 2010.<br />

Construction is On-Going.<br />

GNV31031158547.DOCX/103440004 3-48 JANUARY 2011<br />

REV. 5