Limited Bidding Document<br />
f) If any tax exemptions, reductions, allowances or privileges may be available to the successful/<br />
selected bidder in India, the Purchaser shall use its best efforts to enable the successful/ selected<br />
bidder to benefit from any such tax savings to the maximum allowable extent.<br />
4) Payments<br />
a) Advance Payment will not be made.<br />
b) 100 % payment will be made after completion <strong>of</strong> supplies and sucessfull installation <strong>of</strong> the goods.<br />
c) Payment shall be made after submission <strong>of</strong> bills/invoices in triplicate in the name <strong>of</strong> Secretary &<br />
Commissioner, DoIT & C, Jaipur alongwith copies <strong>of</strong> pro<strong>of</strong> <strong>of</strong> supplies and installations.<br />
5) Liquidated Damages (LD)<br />
a) In case <strong>of</strong> extension in the delivery period with liquidated damages the recovery shall be made on the<br />
basis <strong>of</strong> following percentages <strong>of</strong> value <strong>of</strong> Stores with the bidder has failed to supply:-<br />
delay up to one fourth period <strong>of</strong> the prescribed delivery period: 2.5%<br />
delay exceeding one fourth but not exceeding half <strong>of</strong> the prescribed period: 5.0%<br />
delay exceeding half but not exceeding three fourth <strong>of</strong> the prescribed period: 7.5%<br />
delay exceeding three fourth <strong>of</strong> the prescribed period: 10%<br />
b) Fraction <strong>of</strong> a day in reckoning period <strong>of</strong> delay in supplies shall be eliminated if it is less than half a day.<br />
c) The maximum amount <strong>of</strong> liquidated damages shall be 10% (4) If the supplier requires an extension <strong>of</strong><br />
time in completion <strong>of</strong> contractual supply on account <strong>of</strong> occurrence <strong>of</strong> any hindrance, he shall apply in<br />
writing to the authority, which has placed the supply order, for the same immediately on occurrence <strong>of</strong><br />
the hindrance but not after the stipulated date <strong>of</strong> completion <strong>of</strong> supply.<br />
d) Delivery period may be extended with or without liquidated damages if the delay in the supply <strong>of</strong> goods<br />
is on account <strong>of</strong> hindrances beyond the control <strong>of</strong> the bidder.<br />
6) If any dispute arise out <strong>of</strong> the contract with regard to the interpretation, meaning and breach <strong>of</strong> the terms <strong>of</strong><br />
the contract, the matter shall be referred to by the Parties to the Head <strong>of</strong> the <strong>Department</strong> who will appoint<br />
his senior most deputy as the Sole Arbitrator <strong>of</strong> the dispute who will not be related to this contract and<br />
whose decision shall be final.<br />
7) All legal proceedings, if necessary arise to institute may by any <strong>of</strong> the parties (Government <strong>of</strong> Contractor)<br />
shall have to be lodged in courts situated in Rajasthan and not elsewhere.<br />
8) Authenticity <strong>of</strong> Equipment: The selected bidder shall certify (as per Annexure-3) that the supplied goods<br />
are brand new, genuine/ authentic, not refurbished, conform to the description and quality as specified in<br />
this bidding document and are free from defects in material, workmanship and service.<br />
9) Warranty: The bidder must supply all items with standard warranty after the goods, or any portion there<strong>of</strong><br />
as the case may be, have been delivered to, installed and accepted at the final destination(s) indicated in<br />
the bidding document. However, if delay <strong>of</strong> installation is more than a month’s time due to the reasons<br />
ascribed to the bidder, the warranty shall start from the date <strong>of</strong> last successful installation <strong>of</strong> the items<br />
covered under the PO.<br />
10) Force Majeure<br />
a) The supplier/ selected bidder shall not be liable for forfeiture <strong>of</strong> its PSD, LD, or termination for default if<br />
and to the extent that its delay in performance or other failure to perform its obligations under the<br />
Contract is the result <strong>of</strong> an event <strong>of</strong> Force Majeure.<br />
b) For purposes <strong>of</strong> this Clause, “Force Majeure” means an event or situation beyond the control <strong>of</strong> the<br />
supplier/ selected bidder that is not foreseeable, is unavoidable, and its origin is not due to negligence<br />
or lack <strong>of</strong> care on the part <strong>of</strong> the supplier/ selected bidder. Such events may include, but not be limited<br />
to, acts <strong>of</strong> the Purchaser in its sovereign capacity, wars or revolutions, fires, floods, epidemics,<br />
quarantine restrictions, and freight embargoes.<br />
c) If a Force Majeure situation arises, the supplier/ selected bidder shall promptly notify the DoIT&C in<br />
writing <strong>of</strong> such conditions and cause there<strong>of</strong> within 15 days <strong>of</strong> occurrence <strong>of</strong> such event. Unless<br />
otherwise directed by DoIT&C, the supplier/ selected bidder shall continue to perform its obligations<br />
under the contract as far as reasonably practical.<br />
d) If the performance in whole or part or any obligation under the contract is prevented or delayed by any<br />
reason <strong>of</strong> Force Majeure for a period exceeding 60 days, either party at its option may terminate the<br />
contract without any financial repercussion on either side.<br />
e) In case a Force Majeure situation occurs with the DoIT&C, the DoIT&C may take the case with the<br />
supplier/ selected bidder on similar lines.<br />
Page 14 <strong>of</strong> 20