31.08.2015 Views

Babcock & Brown

24 08 06 interim result 2006 presentation.pdf - Astrojapanproperty.com

24 08 06 interim result 2006 presentation.pdf - Astrojapanproperty.com

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Infrastructure - Outlook<br />

• On 2 June 2006 BNB was selected as preferred tenderer to acquire the South Australian<br />

power generator NRG Flinders with a total capacity of 760MW. This transaction is expected<br />

to close by the end of the month. BNB has announced its intention to consolidate its equity<br />

holdings in its current non wind power generation assets to establish a <strong>Babcock</strong> & <strong>Brown</strong><br />

branded power generation business.<br />

• BNB has reached financial close on 29 PPP or similar projects in the UK, in which we retain<br />

a management interest with a gross value of approximately £860 million. We expect to<br />

establish a fund based in Europe to hold both our UK and Australian projects over which we<br />

retain management rights and a financial interest.<br />

• The Enersis energy portfolio performed ahead of expectations for 1H 2006. Work is continuing<br />

to restructure and develop the portfolio readying it for future sale, in particular the wind and<br />

hydro assets.<br />

• To allow BNB to take advantage of the many opportunities in the US and European<br />

infrastructure sectors the division may seek to raise additional pools of capital through the<br />

creation of wholesale or listed funds in those regions.<br />

33

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!