1. All meters <strong>and</strong> metering equipment used to measure the energy<br />

delivered from the facilities of the <strong>Cooperative</strong> to the Customer’s<br />

premise will be installed <strong>and</strong> owned by the <strong>Cooperative</strong>.<br />

2. The <strong>Cooperative</strong> shall have clear <strong>and</strong> unrestricted access to its<br />

metering equipment. Meters shall be located no lower than 48<br />

inches <strong>and</strong> no higher than 72 inches above finished grade or floor<br />

<strong>and</strong> on the outside of the building. The location of the meter <strong>and</strong><br />

the delivery point shall be designated by the <strong>Cooperative</strong>. The<br />

<strong>Cooperative</strong> will provide specifications for the meter base, which<br />

shall be installed by the Customer as a part of the service entrance.<br />

No part of the service entrance shall be concealed before entering<br />

the meter base.<br />

3. Upon a Customer’s request, the <strong>Cooperative</strong> shall provide<br />

advanced metering <strong>and</strong> associated equipment at the net<br />

incremental cost above the basic metering service provided by the<br />

<strong>Cooperative</strong>. Such cost may be paid by the Customer in<br />

accordance with the terms of the <strong>Cooperative</strong>’s Excess Facilities<br />

Schedule EF. The <strong>Cooperative</strong> shall reply to the Customer in<br />

writing within 15 business days of the request for advanced<br />

metering service, acknowledging the request <strong>and</strong> identifying the<br />

prerequisites <strong>and</strong> proposed process for completing the work. The<br />

<strong>Cooperative</strong> shall determine the type of advanced metering <strong>and</strong><br />

associated equipment, as well as the configuration, based on the<br />

Customer’s location <strong>and</strong> request. After the Customer has<br />

completed any required work <strong>and</strong> obtained all applicable<br />

inspections, the <strong>Cooperative</strong> shall complete its work within 45 days,<br />

or as promptly as working conditions permit. The <strong>Cooperative</strong> is<br />

responsible for the installation <strong>and</strong> removal of all advanced<br />

metering <strong>and</strong> associated equipment. A Customer choosing<br />

advanced metering will be required, where applicable in the sole<br />

opinion of the <strong>Cooperative</strong>, to provide telecommunication service<br />

for the <strong>Cooperative</strong> to retrieve data.<br />

B. Periodic Testing<br />

The <strong>Cooperative</strong> has an established meter testing program in accordance<br />

with st<strong>and</strong>ards set by the American National St<strong>and</strong>ard Code for <strong>Electric</strong>ity<br />

Metering (most current ANSI Meter Test St<strong>and</strong>ard C12-1). This st<strong>and</strong>ard,<br />

or other requirements of the Commission, will be followed to ensure<br />

acceptable accuracy of the <strong>Cooperative</strong>’s electric meters.<br />

C. Tests Requested by Customer<br />

The <strong>Cooperative</strong> will test a meter at the request of any Customer free of<br />

charge provided that such a test not be required more often than once in<br />

twenty-four (24) months. If a test is required more often than once in<br />

twenty-four (24) months, a charge will be made as specified in Schedule<br />

<strong>Rappahannock</strong> <strong>Electric</strong> <strong>Cooperative</strong><br />

26

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!