Round 1 and 2 Extensions Burbo Bank Extension offshore wind farm

Burbo Bank Extension off shore wind farm presentation - National ...

Burbo Bank Extension off shore wind farm presentation - National ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Round</strong> 1 <strong>and</strong> 2 <strong><strong>Extension</strong>s</strong><br />

<strong>Burbo</strong> <strong>Bank</strong> <strong>Extension</strong> <strong>offshore</strong> <strong>wind</strong> <strong>farm</strong><br />

Meeting with the Infrastructure Planning Commission (IPC)<br />

Bristol, 25th January 2011


Summary<br />

• Project Overview<br />

• Timeline<br />

• EIA Surveys progress<br />

• Consultation progress


<strong>Burbo</strong> <strong>Bank</strong> <strong>Extension</strong> – Final Site awarded by TCE (April 2010)<br />

•Total Area: 40 km2<br />

•Capacity: 234 MW (indicative)<br />

•Key Issues:<br />

•Visual Impact (7-12 km)<br />

•Shipping<br />

•Birds (Red-Throated Divers,<br />

Common Scoters)


Export Cable Route – Grid Connection Options<br />

• Birkenhead*<br />

• Deeside (Connah's Quay)*<br />

• Gwynt-Y-Mor (St Asaph,<br />

Denbighshire)*<br />

• Contract with National Grid to be<br />

signed 28th January (indicatively)<br />

* indicative cable routes, subject to modification once final choice<br />

for one of the grid connection options is made


Consents & Consenting Authorities<br />

Offshore Wind Farm Elements<br />

Site<br />

Turbines<br />

Interarray Cable<br />

Offshore Substation<br />

Consents<br />

DCO<br />

Consenting<br />

Authorities<br />

IPC (with MMO)<br />

IPC (with MMO)<br />

IPC (with MMO)<br />

IPC (with MMO)<br />

Integral<br />

Part of the<br />

Development<br />

Offshore Export<br />

Cable<br />

(in English Waters)<br />

DCO + deemed<br />

FEPA/Marine<br />

Licence<br />

IPC (with MMO)<br />

Offshore Export<br />

Cable<br />

(in Welsh Waters,<br />

up to the MHWM)<br />

DCO<br />

+<br />

FEPA/Marine<br />

Licence<br />

WAG (with MCU) /<br />

IPC to provide input<br />

through the MMO<br />

Associated<br />

Part of the<br />

Development<br />

Onshore Cable<br />

(in Welsh Territory,<br />

from the MLWM)<br />

Onshore Substation<br />

Planning<br />

Permission<br />

Local Planning<br />

Authority(ies)<br />

5


* indicative cable route, substation <strong>and</strong><br />

turbine position, subject to modification


Indicative Timeline –<br />

<strong>Burbo</strong> <strong>Bank</strong> <strong>Extension</strong>


EIA Surveys (underway <strong>and</strong> planned – indicative dates)<br />

• Geophysical Surveys: October to November 2010 <br />

• Shipping Surveys & Navigation Risk Assessment: surveys: 1 st survey<br />

summer 2011, 2 nd survey winter 2011; hazard workshop Q3 2011, report:<br />

December 2011<br />

• Gas Platform buffers/Helicopter/Aviation impact Assessment: Q3 2011<br />

• Benthic & Intertidal Surveys: April to May 2011<br />

• Birds & Marine Mammals Surveys: Aerial (Nov 2010-Oct 2011), Boat (Apr<br />

2011-Sept 2011)<br />

• Onshore EIA: Tenders received <strong>and</strong> being assessed; undertaken late<br />

February until August 2011 (depending on grid contract signature date)<br />

• Fisheries Surveys: April <strong>and</strong> October 2011<br />

• MetOcean & Coastal Processes Survey: April to June 2011<br />

• Seascape & L<strong>and</strong>scape Visual Impact Assessment: Tender released early<br />

Feb 2011; undertaken April/May 2011<br />

8


S42 Consultation<br />

• Informal Consultations held in the past 6 months with several statutory<br />

<strong>and</strong> non statutory consultees:<br />

- Discussions on their Scoping Opinions<br />

- EIA survey methodologies & scope of works circulated to relevant<br />

stakeholders<br />

- Key communication pathways established<br />

• Formal Consultations to likely start February 2011 – after grid contract is<br />

indicatively signed 28 th January <strong>and</strong> Section 46 notification to IPC is made<br />

- Preliminary Environmental Information document being drafted<br />

(summarised Scoping Report including timetable of EIA surveys<br />

upcoming/undertaken <strong>and</strong> results if any)<br />

- Draft EIA Chapters to be sent out as soon as surveys <strong>and</strong> analysis<br />

completed.


S47 Consultation - Local Authorities<br />

• Individual meetings held in November 2010 to<br />

discuss their Scoping Opinions <strong>and</strong> introduce the<br />

Statement of Community Consultation process<br />

• Collective meeting scheduled on February 17 th<br />

- To agree on the SoCC contents, methodologies <strong>and</strong><br />

consultation tools;<br />

- to discuss collaboration with DONG <strong>and</strong> amongst<br />

themselves<br />

- Framework agreements to support local authorities<br />

as a group (e.g. Planning Performance Agreements)<br />

• SoCC likely to be published end March 2011


Project Team<br />

<strong>Burbo</strong> <strong>Bank</strong> <strong>Extension</strong> <strong>offshore</strong> <strong>wind</strong> <strong>farm</strong><br />

Ferdin<strong>and</strong>o Giammichele - Project Manager<br />

Stuart Livesey - Consents Manager<br />

Emily Marshall - Project Assistant<br />

fergi@dongenergy.co.uk<br />

stliv@dongenergy.co.uk<br />

emars@dongenergy.co.uk<br />

DONG Energy Power (UK) Ltd.<br />

33 Grosvenor Place<br />

Belgravia<br />

London<br />

SW1X 7HY<br />

Web: www.burbobankextension.co.uk<br />

E-mail: burbobankextension@dongenergy.co.uk