NATIONAL WATER COMMISSION HANOVER PARISH PLAN
NATIONAL WATER COMMISSION HANOVER PARISH PLAN
NATIONAL WATER COMMISSION HANOVER PARISH PLAN
- No tags were found...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>NATIONAL</strong> <strong>WATER</strong> <strong>COMMISSION</strong><br />
<strong>HANOVER</strong> <strong>PARISH</strong> <strong>PLAN</strong><br />
D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />
1 | P a g e
D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />
2 | P a g e
1 Introduction<br />
Hanover is located on the North Western side of Jamaica and is bordered on the<br />
east by St. James, and on the South by the parishes of Westmoreland; the<br />
Caribbean Sea forms the northern and western boundary of the parish. The parish<br />
has a mountainous terrain, with the coastline marked by coves and bays. Hanover<br />
covers an area of 430 km 2 . The highest point in the parish is the Dolphin's Head,<br />
which serves as a landmark for ships at sea. The parish has three small waterfalls,<br />
several coves, such as the Davis Cove, named after a prominent Hanover family,<br />
along its coastline and large caves. In the centre of Lucea stands a clock tower.<br />
Though it was installed in 1817, it is still fully functional.<br />
. Hanover is known for the production of yams, sugar cane, ginger, rice, pimento,<br />
turmeric, breadfruit and arrowroot. Hanover is celebrated for its fine breeds of cattle.<br />
The principal towns are Lucea, Green Island, Hopewell, and Sandy Bay.<br />
The tourism industry has played a major role in the economic activity of the parish.<br />
A deep-water pier was built, but this has been restricted only to the shipping of molasses. In<br />
1983, the port was closed, but the old Fort Charlotte still stands at one side of the entrance<br />
to the harbour. The major hotels are located along the coastline.<br />
National Water Commission (NWC) produces some 635,457 m3/month of water per<br />
month in Hanover through five (5) surface sources. The average billed volume from<br />
16,813 accounts is only 275,695 m 3 /month which translates to average nonrevenue<br />
water (NRW) of 359,762 m 3 /month i.e. 57% of production. This<br />
unacceptable level of NRW has had an adverse impact on the level of service<br />
provided to the people of the parish, on its financial performance and that of NWC.<br />
NWC now provides water to some 80.78% of the population in Hanover, which is a<br />
marginal improvement over that in 2001 when the level of coverage was 74%. The<br />
reliability of service to those who are served by NWC is estimated to average 18<br />
hours per day. The average utilization rate of the parish is 79.70%. Total length of<br />
pipeline within the parish is 455 km with varying material types from CI, AC, GI,<br />
PVC, ST and DI.<br />
A Water Supply Improvement plan has been prepared for the parish and is<br />
presented in this document. The WSIP for the parish will involve an expenditure of<br />
$5.4732 billion over the next twenty years in carrying out a number of water supply<br />
rehabilitation and upgrading works. A substantial portion of the proposed works is<br />
aimed at addressing the unacceptable level of NRW through the replacement of<br />
major sections of the aged and undersized water supply infrastructure and<br />
D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />
3 | P a g e
improvement in water supply pressure management. It is planned to increase water<br />
supply coverage to 93% of the parish population by end 2030, reduction in NRW to<br />
30% and service reliability to 24 hours per day at that time.<br />
2 Existing Water Supply System<br />
2.1 Water Resource<br />
Surface Water<br />
Some 100% of the water abstracted in the parish is obtained from surface sources.<br />
The following are the main surface sources in the parish:<br />
Shettlewood Spring<br />
Cascade<br />
New Milns<br />
Logwood<br />
Kendal<br />
2.2 Water Supply Systems<br />
The water supply network throughout the parish is aged and undersized,<br />
contributing to unacceptable level of service there. Information on the water supply<br />
network is summarized in table 2.1 below.<br />
Figure 2.1 – Hanover Water Supply<br />
D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />
4 | P a g e
D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />
5 | P a g e
Table 2.1 – Summary Information on Hanover Pipe Network<br />
Pipe<br />
Diameter<br />
(inches)<br />
Approximate<br />
Length (km)<br />
Portion of<br />
the<br />
Network<br />
(%)<br />
0.50 5.77 1.30%<br />
0.75 12.79 2.88%<br />
1 44.13 9.94%<br />
2 19.82 4.47%<br />
2 111.68 25.16%<br />
3 41.74 9.40%<br />
4 80.61 18.16%<br />
6 31.87 7.18%<br />
8 15.35 3.46%<br />
9 0.89 0.20%<br />
10 19.78 4.46%<br />
12 31.63 7.13%<br />
14 0.90 0.20%<br />
18 6.79 1.53%<br />
20 20.10 4.53%<br />
443.85<br />
3 NON-REVENUE <strong>WATER</strong> LEVELS<br />
Set out in figure 3.1 is the annual water balance for Hanover. This was derived from<br />
the water balances that were prepared for each of the water supply systems in the<br />
parish. The water balances are based on flow measurements that were conducted<br />
for sections of the water supply network as well as examinations of customer<br />
records.<br />
NWC water production facilities in the parish provide approximately 7.5 million cubic<br />
meters (1.7 billion gallons) of water per year to the water supply network. Physical<br />
losses amount to 3.5 million cubic meters (0.77 billion gallons) per year. This<br />
represents 46.8% of the amount produced.<br />
D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />
6 | P a g e
Revenue water in the parish is only 3.3 million cubic meters, which is 42.6% of the<br />
water produced. The remaining 0.7 million cubic meters relate to commercial<br />
losses.It would be noted that 0.61M cubic meters of water is attributed to<br />
unauthorized consumption (i.e. 8.1% of production). This is largely due to illegal<br />
connections to sections of the water transmission main for use in informal<br />
settlements.<br />
D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />
7 | P a g e
Figure 3.1 – Water Balance for Hanover<br />
8 | P a g e<br />
D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1
4 Water Requirement<br />
4.1 Parish Population<br />
General<br />
In 2001 the population in Hanover was 67,067, which was a 1.01% increase over the<br />
66,108 in 1991. Based on an annual population growth rate of 1.01%, it is estimated<br />
that the population in the parish in 2010 is 67,884 persons.<br />
There were 16,767 households in 2001 of which 12,228 had piped water (74%). There<br />
are now 16,817 customer accounts. Based on this information, it is estimated there was<br />
a 2% increase in the number of dwellings with piped since 2001, an average annual<br />
increase of 0.4%. It is estimated that 80.8% of the population of the parish now has<br />
piped water.<br />
Demand Centres<br />
The enumeration districts (EDs) that were used in the 2001 population census was used<br />
to establish priority areas that will be targeted to be provided with water supply. EDs<br />
with population densities in excess of 150 persons per square kilometres were grouped<br />
to form these demand centres.<br />
Figure 4.1 – Demand Centres<br />
D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />
9 | P a g e
Pipeline<br />
TYPES OF DATA<br />
Subdivision<br />
Enumeration<br />
District (ED)<br />
- Population Data<br />
<strong>WATER</strong> DEMAND CENTRES<br />
Light Blue Shaded EDs<br />
-Pop > 150p/sq Km<br />
-Priority given to fully supply<br />
Pump<br />
Station<br />
As far as possible, each demand centre (DC) is linked to a water supply system. It is<br />
related to a water distribution system that now serves it or has the potential to serve by<br />
it.<br />
Set out in table 4.1 is information showing the population in each DC, indicating<br />
estimates for 2010, 2015, 2030.<br />
Name of<br />
Water Supply<br />
System<br />
Population<br />
to be Served<br />
2010<br />
Population<br />
to be Served<br />
2015<br />
Population<br />
to be Served<br />
2020<br />
Population<br />
to be Served<br />
2025<br />
Population<br />
to be Served<br />
2030<br />
CASCADE 3,100 3,534 4,029 4,593 5,236<br />
KENDAL 2,555 2,913 3,320 3,785 4,315<br />
NEW MILNS 6,550 7,467 8,512 9,704 11,063<br />
SHTTLEWOOD 14,096 16,069 18,319 20,884 23,808<br />
LOGWOOD 57,285 65,305 74,448 84,870 96,752<br />
The estimated total 2010 population in the DCs is shown to be 6,374 (9.4% of parish<br />
population)<br />
D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />
10 | P a g e
4.2 Current Water Requirement<br />
Supply<br />
System<br />
Production<br />
gal/day)<br />
Population<br />
Domestic<br />
Water<br />
Requirement<br />
(gal/day)<br />
Commercial &<br />
Other Water<br />
Requirement<br />
(gal/day)<br />
Technical<br />
Losses<br />
(gal/day)<br />
Total Water<br />
Requirement<br />
(gal/day)<br />
Supply<br />
Surplus/Deficit<br />
(gal/day)<br />
Cascade 28,650 3,100 124,000 13,778 13,179 150,957 (122,307)<br />
Kendal 41,600 2,555 102,200 11,356 19,136 132,692 (91,092)<br />
New Milns 106,400 6,550 262,000 29,111 48,944 340,055 (233,655)<br />
Shettlewood 567,721 14,096 563,840 62,649 261,151 887,640 (319,920)<br />
Logwood 5,408,083 57,285 2,291,400 1,659,290 2,487,718 6,438,408 (1,030,325)<br />
TOTAL 6,152,453 83,586 3,343,440 1,776,183 2,830,128 7,949,751 (1,797,298)<br />
The current water supply situation in Hanover is that, overall, there is insufficient<br />
water in the parish to meet the water requirement, even with the existing technical<br />
losses (leaks, tank overflows, etc). There is a current water supply shortfall of some<br />
2.7 mgd based on the existing water production levels and the water requirement in<br />
the Demand Zones combined.<br />
The average daily water production in the parish is 5.7 mg; the average day water<br />
requirement (domestic, commercial, institutional, etc) in the Demand Zones is<br />
estimated to be 5.8 mgd. Technical losses estimated to be 2.7 mgd.<br />
Set out in the tables below are water supply scenarios based on whether the level<br />
of technical losses are addressed and reduced to 30% at most or the conditions<br />
remain the same. It would be noted that the deficit would increase to 3.8 mgd.<br />
Water Requirement in 2030 – Supply Conditions Remain Unchanged<br />
Supply<br />
System<br />
Production<br />
gal/day)<br />
Population<br />
Domestic<br />
Water<br />
Requirement<br />
(gal/day)<br />
<strong>HANOVER</strong> - YR 2030<br />
Commercial &<br />
Other Water<br />
Requirement<br />
(gal/day)<br />
D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />
Technical<br />
Losses<br />
(gal/day)<br />
Total Water<br />
Requirement<br />
(gal/day)<br />
Supply<br />
Surplus/Deficit<br />
(gal/day)<br />
Cascade 28,650 3,708 148,335 16,482 13,179 177,996 (149,346)<br />
Kendal 41,600 3,056 122,257 13,584 19,136 154,977 (113,377)<br />
New Milns 106,400 7,835 313,418 34,824 48,944 397,187 (290,787)<br />
Shettlewood 567,721 16,862 674,496 74,944 261,151 1,010,591 (442,871)<br />
Logwood 5,408,083 68,527 2,741,096 1,984,932 2,487,718 7,213,745 (1,805,663)<br />
11 | P a g e
TOTAL 6,152,453 99,990 3,999,603 2,124,766 2,830,128 8,954,497 (2,802,044)<br />
D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />
12 | P a g e
Water Requirement in 2015 - NRW reduced to 30% of Production<br />
Supply<br />
System<br />
Production<br />
gal/day)<br />
<strong>HANOVER</strong> - YR 2015 - NRW Reduced to 30%<br />
Commercial<br />
Domestic & Other<br />
Water Water Technical<br />
Requirement Requirement Losses<br />
Population (gal/day) (gal/day) (gal/day)<br />
Total Water<br />
Requirement<br />
(gal/day)<br />
Supply<br />
Surplus/Deficit<br />
(gal/day)<br />
Cascade 32,300 3,242 129,681 14,409 9,690 153,780 (121,480)<br />
Kendal 49,400 2,672 106,883 11,876 14,820 133,578 (84,178)<br />
New Milns 126,350 6,850 274,004 30,445 37,905 342,354 (216,004)<br />
Shettlewood 617,500 14,742 589,674 65,519 185,250 840,443 (222,943)<br />
Logwood 7,125,000 59,910 2,396,386 1,735,314 2,137,500 6,269,200 855,800<br />
TOTAL 7,950,550 87,416 3,496,627 1,857,563 2,385,165 7,739,355 211,195<br />
Water Requirement in 2030 - NRW reduced to 30% of Production<br />
Supply<br />
System<br />
Production<br />
gal/day)<br />
<strong>HANOVER</strong> - YR 2030 - NRW Reduced to 30%<br />
Commercial<br />
Domestic & Other<br />
Water Water Technical<br />
Requirement Requirement Losses<br />
Population (gal/day) (gal/day) (gal/day)<br />
Total Water<br />
Requirement<br />
(gal/day)<br />
Supply<br />
Surplus/Deficit<br />
(gal/day)<br />
Cascade 32,300 3,708 148,335 16,482 9,690 174,507 (142,207)<br />
Kendal 49,400 3,056 122,257 13,584 14,820 150,661 (101,261)<br />
New Milns 126,350 7,835 313,418 34,824 37,905 386,148 (259,798)<br />
Shettlewood 617,500 16,862 674,496 74,944 185,250 934,690 (317,190)<br />
Logwood 7,125,000 68,527 2,741,096 1,984,932 2,137,500 6,863,527 261,473<br />
TOTAL 7,950,550 99,990 3,999,603 2,124,766 2,385,165 8,509,533 (558,983)<br />
.<br />
D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />
13 | P a g e
5 Water Supply Improvement Plans<br />
The improvement to the water supply in Hanover will be based on<br />
(a) Reducing the level of technical losses due to the aged water supply network;<br />
(b) Rehabilitating the water facilities to increase output.<br />
NWC has committed to significantly reduce the high level of NRW in the parish of<br />
Hanover. This will include pipeline replacement works and improved pressure<br />
management.<br />
The Logwood Water Treatment Plant is the major plant in the parish, with an installed<br />
treatment capacity of 7.5 mgd. Its average production in recent years has been 5.4 mgd.<br />
The projects will be packaged as presented below. Details on the undertakings are<br />
provided in section 6.<br />
5.2.1 Component A<br />
• Water Treatment Plant and Intake Works Rehabilitation<br />
o Redesign and rehabilitation of Intake Works<br />
o Supply of Spare parts and materials<br />
o Additional stand-by Generating capacity<br />
o New High – lift motors<br />
o Painting of Clarifiers and Filters<br />
5.2.2 Component B<br />
• Rehabilitation, Construction and Expansion of Reservoir<br />
o Rehabilitation and reinstatement of Fish River storage Tank.<br />
o Rehabilitation of Malcolm Heights storage Tank.<br />
o Rehabilitation/extension of Welcome storage Tank.<br />
o New tank at McQuarie.<br />
o Rehabilitation of Friendship Tank storage.<br />
o Installation of New Tank at Chester Castle, Copse and Macfield.<br />
D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />
14 | P a g e
5.2.3 Component C<br />
• Water Supply Enhancement<br />
o Water Supply system from Black Gate to Welcome Tank.<br />
o Upgrading Sea View, Lookout and Bamboo Water Supply System.<br />
o Cascade, Jericho, Cold Spring and Pondside Water Supply System.<br />
o Brighton Water Supply - Upgrading of the NONPARIEL Water Supply<br />
System.<br />
o Interconnection Logwood system with Bulstrode at Sheffield.<br />
o White Hall and Orange Hill Water Supply.<br />
o Extension of 4.5 km of new 100mm pipe from Keep Left in Lucea to Dry Hill.<br />
o Extension 30 km of 500mm from Point to Logwood.<br />
o Watershed Development in Rural Hanover<br />
o Lay 6 km transmission pipe from Shettlewood to Mt Carey pumping Station.<br />
5.2.4 Component D<br />
• Supply of materials and Equipment and do General NRW reduction<br />
o Active leak detection and Repair.<br />
o Creation of new flow/pressure zones and installation valves.<br />
o Detailed micro DMA investigation (technical/commercial)<br />
o Reconfigure sections of the distribution system<br />
o Controls for all pumps within the distribution.<br />
o House to house service connection investigation and replacement.<br />
o Metering, sizing, replacement and Geo referencing of all customers.<br />
o CS Analysis.<br />
o Updating Hydraulic Model to further simulate the distribution.<br />
o Installation of SCADA system.<br />
D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />
15 | P a g e
5.2.5 Component E<br />
• Pipeline Replacement Plan<br />
o Replace 6 km of 4” pipe in Lucea.<br />
o Replace 16 km of 12’’ CI & AC with 250mm From Orange Bay PRV to Negril<br />
PRV.<br />
o Replace 21 km of 12’’ AC From Orange Bay PRV to Bulls Bay.<br />
o Replace 2.3 km of 12’’ AC from Rusea’s boundary valve to Malcolm Heights<br />
Tank.<br />
o Replace 2.3 km of 6" AC line that runs from the highway to Prospect and<br />
Kendall.<br />
o Replace 7 km of 4” GI from Summerset road to Westend road.<br />
o Replace 4 km of 12’’ AC from Keep Left to Molasses Tank.<br />
o Replace and upgrade 0.6 km of 3’’ GI from Cambleton to March Town.<br />
o Replace 1 km of 4’’ GI from New Milns Pump Station to Welcome Tank.<br />
o Replace 2 km of 1’’ GI from Axe and Daze to Chigwell.<br />
5.2.6 Component F<br />
• Low Income Settlement Improvement<br />
o Low Income settlement (Red area) water supply and billing improvement.<br />
o Reduction Water consumed or wasted at low income settlements to reduce<br />
the high NRW ratio<br />
o<br />
Improve service by giving one connection per property with meter.<br />
o Abatement of Illegal Connections and conversion to active accounts<br />
5.2.7 Component G<br />
• Pumping Station and Well Rehabilitation<br />
o Rehabilitation of Kendal Intake Sump.<br />
o Shettlewood Intake.<br />
D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />
16 | P a g e
5.1 Expected Benefits<br />
The detailed audit of the Hanover Supply system will provide information that will be<br />
used to help in defining detailed NRW reduction intervention activities. The results<br />
of the audit will be used to target the most critical sections of the parish water<br />
supply system that require attention and assist in scheduling of the required works.<br />
The information will be used to populate the asset database for the parish which will<br />
form a critical part of the asset management system (AMS) that will be established<br />
for Hanover. A fully functional AMS will be a valuable operational tool that can be<br />
used to sustain the benefits that will be derived from the various projects and<br />
activities that are set out in this document.<br />
Improved network infrastructure<br />
• DMAs, pressure zones, SCADA etc.<br />
Improved network data quality (GIS)<br />
Improved asset management planning<br />
High quality and continuous water supply service<br />
Hydraulic network model<br />
Extension of Service areas<br />
Operational Improvements and Energy savings<br />
Utility staff development<br />
• Specialist technical and managerial know-how<br />
• New technology and the know-how to use it efficiently<br />
D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />
17 | P a g e
5.1.1 Cost for Improvements - Summary<br />
Item No. Proposed Project for NRW Reduction in Hanover<br />
Budget Cost<br />
in $JB<br />
1<br />
2<br />
Component A<br />
Water Treatment Plant and Intake Works Rehabilitation<br />
Component B<br />
Rehabilitation, Construction and Expansion of<br />
Reservoir<br />
0.3<br />
0.27<br />
3<br />
Component C<br />
Water Supply Enhancement 1.63<br />
4<br />
Component D<br />
Supply of materials and Equipment and do General<br />
NRW reduction<br />
0.41<br />
5<br />
6<br />
7<br />
Component E<br />
Pipeline Replacement Plan 1.826<br />
Component F<br />
0.045<br />
Low Income Settlement Improvement<br />
Component G<br />
Pumping Station and Well Rehabilitation 0.08<br />
8<br />
Sub-Total - Works<br />
Consultancy Engineering Designs:<br />
Consultancy, audit, Engineering Designs and<br />
Construction Supervision Services ~ 20%<br />
4.561<br />
0.9122<br />
Budget : Grand Total 5.4732<br />
18 | P a g e<br />
D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1
5.1.2 Economic Assessment<br />
19 | P a g e<br />
D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1
6 Water Supply Projects<br />
6.1 Cascade Demand Zone (H-1)<br />
6.1.1 System Description<br />
Cascade Water Supply System is supplied by a small spring source with an average output<br />
of 35,000 gallons per day.<br />
6.1.2 Service Area<br />
The communities served by the Cascade Water Supply System include: Cascade, Pondside,<br />
Great Valley, Jericho, Retrieve, Claremount, Smithfield, Willoughby and Cold Spring.<br />
6.1.3 Water Requirement<br />
The current population in the DC in Hanover that is served by the Cascade system is<br />
estimated to be 3,100 persons and this is expected to increase to 3,708 persons by 2030.<br />
There is an existing supply deficit of 0.2 mgd and it is projected that this will marginally<br />
increase to 0.24 mgd by 2030 if the supply conditions remain as they are today .<br />
6.1.4 Addressing the Supply Deficiencies<br />
Water Supply Enhancement<br />
It is planned to connect the Cascade Water Supply System to the Great River Water Supply<br />
System, after the Great River Water Treatment Plant is refurbished to produce at its<br />
maximum. This will involve linking to the pumping system from the new 500 mm pipeline<br />
at Mosquito Cove. The proposed project will include the installation of 10km of 150mm<br />
pipe line, two Booster station and the construction of a new 50,000 gallon water storage<br />
tank.<br />
D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />
20 | P a g e
Miscellaneous Non-Revenue Water Reduction NRW<br />
It is planned to carry out miscellaneous non-revenue water activities on the Cascade water<br />
supply system to include:<br />
• Creation of new flow/pressure zones and installation of gate valves, check valves,<br />
flow control valves, pressure sustaining valves, control mate, air valves throughout<br />
distribution<br />
• Detailed micro DMA investigation (technical/commercial)<br />
• Controls for all pumps within the distribution with pressure switch, timer, surge<br />
vessel to reduce energy and water loss<br />
• House to house service connection investigation, replacement, repairing leaks on<br />
service connection and Consumer to Customer conversion<br />
• Installation of a new telemetry system for flow, level, pressure and water quality<br />
and to create an electronic library including flow, level and pressure data collected<br />
in the past years<br />
Low Income Farming Settlement Environmental Improvement<br />
It is planned to rationalize the supply arrangements in the low income settlements to<br />
reduce the level of commercial losses, providing one connection to each property and<br />
generally converting properties with illegal connections to active customers<br />
D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />
21 | P a g e
6.1.5 Cost for Improvements<br />
The estimated total cost for the improvement works is $234M as shown below.<br />
Activity Qnty Cost ($)<br />
Installation of 10 km 150 mm DI pipeline 10,000 125,400,000<br />
Construction of booster station and Tank 4,600,000<br />
Miscellaneous NRW activities 50,000,000<br />
Rationalizing supply arrangement in low<br />
income communities<br />
15,000,000<br />
Sub-Total 195,000,000<br />
Engineering & Other Cost 39,000,000<br />
TOTAL 234,000,000<br />
6.1.6 Economic Assessment<br />
22 | P a g e<br />
D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1
6.2 Kendal Demand Zone (H-2)<br />
6.2.1 System Description<br />
The Kendal Water Supply System is supplied by a small spring source with an average<br />
output of 41,600 gallons per day.<br />
6.2.2 Service Area<br />
The communities served by the Kendal Water Supply System include Kendal, Kendal Top,<br />
Cessnock, Lower and Upper Rock Spring, Grange, Munro and Crib.<br />
6.2.3 Water Requirement<br />
The current population in the DC in Hanover that is served by the system is estimated to<br />
be 2,555 persons and this is expected to increase to 2,672 persons by 2030. There is an<br />
existing supply deficit of 0.15 mgd and it is projected that this will marginally increase to<br />
0.19 mgd by 2030 if the supply conditions remain as they are today .<br />
6.2.1 Addressing the Supply Deficiencies<br />
Intake Works and Pumping Station Rehabilitation<br />
It is planned to repair the sump for the pumping unit at the intake works at the source to<br />
minimize water losses and increase production. Also to include the inter-connection with<br />
150mm pipeline from Logwood system to Prospect to help meet deficit.<br />
Installation of Reservoir (0.02B)<br />
It is planned to design and site a new water storage capacity for the Kendal system.<br />
Miscellaneous Non-Revenue Water Reduction NRW<br />
It is planned to carry out miscellaneous non-revenue water activities on the Kendal water<br />
supply system. These will include house to house service connection investigation,<br />
replacement, repairing leaks on service connection and conversion of illegal users to active<br />
customers.<br />
D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />
23 | P a g e
Pipeline Replacement/Upgrading<br />
Pipeline replacement will be undertaken as follows:<br />
• Replacement of 1.3 km of 2’’ GI Pipe with 100mm from Kendal to Grange to<br />
improve supply and meet the demand.<br />
• Replacement of 3 km of Pipe 3’’ GI with 100mm from Kendal to Grange to improve<br />
supply and meet the demand.<br />
D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />
24 | P a g e
6.2.2 Cost for Improvements<br />
The estimated total cost for the improvement works is $118.7M as shown below.<br />
Activity Qnty Cost ($)<br />
Rehabilitation of source intake works 10,000,000<br />
Construction of new water storage tank 20,000,000<br />
Miscellaneous NRW activities 20,000,000<br />
Replacement of 1.3 km of 2’’ GI Pipe with<br />
100mm from Kendal to Grange to improve<br />
supply and meet the demand.<br />
Replacement of 3 km of Pipe 3’’ GI with<br />
100mm from Kendal to Grange to improve<br />
supply and meet the demand.<br />
Rationalizing supply arrangement in low<br />
income communities.<br />
1,300 12,668,500<br />
3,000 29,235,000<br />
7,000,000<br />
Sub-Total 98,903,500<br />
Engineering & Other Cost 19,780,700<br />
TOTAL 118,684,200<br />
25 | P a g e<br />
D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1
6.2.1 Economic Assessment<br />
26 | P a g e<br />
D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1
Logwood Demand Zone (H-3)<br />
6.2.2 System Description<br />
The Logwood Water Supply System is the major system in Hanover. It is supplied by the<br />
Logwood Water Treatment Plant that has an installed capacity of 7.5 mgd. This plant is<br />
operating below capacity due to certain operational challenges and the state of some<br />
elements of this plant as outlined below.<br />
6.2.3 Service Area<br />
The communities that are now served by the Logwood Supply System include:<br />
First Hill, Bachelors, St. Simon, Bloody Bay, Logwood, Sheffield, Negril West End,<br />
March Town, Cave Valley, Santoy, Orange Bay, Green Island, Salt Spring, Lucea,<br />
Esher, Elgin Town, Malcolm Heights, Haughton Court, Claudwell, Ginger Hill, Pell<br />
River, First Hill, Prospect, Friendship, Rhodes Hall, Lances Bay, Bull Bay, Nonperiel,<br />
Red Ground, Good Hope, Mt Airy, Retreat, Orange Hill, Retirement, Brighton, Spring<br />
Gardens, Silver Spring, Archwell, Green River<br />
6.2.4 Water Requirement<br />
The current population in the DC in Hanover that is served by the system is estimated<br />
to be 57,285 persons and this is expected to increase to 68,527 persons by 2030. There is<br />
an existing deficit of 1.0 mgd and it is projected that this will marginally increase to 1.8<br />
mgd by 2030 if the supply conditions remain as they are today .<br />
6.2.5 Addressing the Supply Deficiencies<br />
Some of the issues now being experienced in the Logwood water supply system<br />
include:<br />
• Reduction in flow through the intake to the Logwood plant by up to 20% during<br />
periods of drought<br />
• There is need to provide the additional two raw water pumps for which<br />
provision was made<br />
• The treatment plant is not capable of producing water at its designed 7.5mgd<br />
capacity because only three of eight pumps at clear water well are operational.<br />
D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />
27 | P a g e
• Sections on the distribution to Lucea and Negril experience excessively high<br />
pressures and there are losses primarily from the aged asbestos cement and cast<br />
iron type distribution network.<br />
The planned works are presented below.<br />
Treatment Plant and Intake Works Rehabilitation<br />
• Rehabilitation of Intake Works<br />
• Rehabilitation of Logwood Treatment Plant pumping capacity to maximise<br />
production<br />
• Supply of Spare parts and materials to sustain production efficiency capacity<br />
and Preventative maintenance<br />
• Power factor correction at Logwood WTP.<br />
Rehabilitation and expansion of Reservoir<br />
• Rehabilitation and reinstatement of Fish River storage Tank<br />
• Rehabilitation of Malcolm Heights storage Tank to be supplied from Logwood<br />
Water Supply Enhancement<br />
• Brighton Water Supply - Interconnection of the Non Pariel pump station from<br />
the 18 inch diameter pipeline from the Logwood Treatment plant, install<br />
pipeline and pumps to deliver water to Brighton and environs from Nonpariel.<br />
Install 3 km of 150mm pipes, Procure & install a 100,000 gallon water storage<br />
tank and construct a booster station.<br />
• Interconnection from the 18" (coming from Logwood, reaching the Highway) at<br />
the taxi stop in the highway towards Savanna, near to Negril Spots, with the 8"<br />
pipeline that was started four years ago. Interconnection should be provided<br />
with a PRV because the pressure is about 15 bar from the main.<br />
• Basic Telemetry system connecting Red Ground with Logwood WTP. The<br />
system shall be able to show 5 different levels of the reservoir to the operator in<br />
order to decide when to stop 2 pumps and keep running one for network<br />
balanced operation.<br />
• At Negril area, to interconnect and install a 150mm pipeline from the 18" main at<br />
Sweet Spice restaurant with meter and PRV supplying White Hall and the road<br />
towards Orange Hill. This will involve the use of the Redground and Westland<br />
water storage tanks.<br />
D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />
28 | P a g e
• Extension of 4.5 km of new 100mm pipe from Keep Left in Lucea to Dry Hill<br />
• Extension 30 km of 500mm from Point to Logwood.<br />
D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />
29 | P a g e
General Non-Revenue Water Reduction NRW<br />
• Active leak detection and Repair of detected leaks<br />
• Creation of new flow/pressure zones and installation of gate valves, check<br />
valves, flow control valves, pressure sustaining valves, control mate, air valves<br />
throughout distribution<br />
• Detailed micro DMA investigation (technical/commercial)<br />
• Reconfigure sections of the distribution system<br />
• Controls for all pumps within the distribution with pressure switch, timer, surge<br />
vessel to reduce energy and water loss<br />
• House to house service connection investigation, replacement, repairing leaks on<br />
service connection and Consumer to Customer conversion<br />
• Metering and Geo referencing of all customers. Macro and micro metering,<br />
sizing, maintenance and replacement<br />
• CS Analysis<br />
• Updating Hydraulic Model to further simulate the distribution<br />
• Installation of SCADA (Supervisory control and data acquisition) system to<br />
monitor Flow, pressure, water quality and level in real time<br />
Rehabilitation and Reinforcement of Small, Medium and Large Diameter Pipe Network<br />
• Replacement of 16 km of Pipe 12’’ CI & AC with 250mm From Orange Bay PRV<br />
to Negril PRV<br />
• Replacement of 21 km of Pipe 12’’ AC with 300mm From Orange Bay PRV to<br />
Bulls Bay<br />
• Replacement of 2.3 km of Pipe 12’’ AC with 300mm From Rusea’s boundary<br />
valve to Malcolm Heights Tank and interconnect with to 250mm PVC at keep<br />
left in Lucea.<br />
• (Prospect): 2.3 km of Replacement of the 6" AC line that runs from the highway<br />
towards Prospect and Kendall<br />
• Replace 7 km of 4” GI with 150mm pipe from Summerset road to Westend road.<br />
• Replacement of 21 km of Pipe 12’’ AC with 300mm From Orange Bay PRV to<br />
Bulls Bay<br />
• Replacement of 4 km of Pipe 12’’ AC with 300mm From Keep Left to Lucea PRV<br />
at Molasses Tank<br />
D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />
30 | P a g e
• Replacement and upgrading of 0.6 km of Pipe 3’’ GI with 100mm From<br />
Cambleton to March Town intersection<br />
D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />
31 | P a g e
Low Income Settlement Environmental Improvement<br />
• Reduction Water consumed or wasted at low income settlements to reduce the<br />
high NRW ratio<br />
• Improve service by giving one connection per property with meter.<br />
• Abatement of Illegal Connections and conversion to active accounts<br />
D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />
32 | P a g e
6.2.6 Cost for Improvements<br />
The estimated total cost for the improvement works is $3,781.2.7M as shown below.<br />
Activity Qnty Cost ($)<br />
A. Treatment Plant and Intake Works and<br />
Storage Tank Rehabilitation<br />
Rehabilitation of the Logwood WTP to<br />
restore facility to produce at its design level. 300,000,000<br />
Expansion of the water storage tank at Fish<br />
River and Malcolm Heights. 100,000,000<br />
Sub-Total A<br />
400,000,000<br />
B. Water Supply Enhancement<br />
Install 3 km of 150mm pipeline from<br />
Non Pariel to Brighton 3,000 37,620,000<br />
Other pipeline installation to improve<br />
service to Non-Pariel 6,000 75,240,000<br />
Construct 100K water storage tank<br />
14,000,000<br />
Construct & equip booster station<br />
20,000,000<br />
Install 4.5 km of new 150mm pipe from<br />
Keep Left in Lucea to Dry Hill 4,500 56,430,000<br />
Install 150 mm pipeline from the Negril<br />
Highway at "taxi stop" to Savanna 6,000 75,240,000<br />
Provision for pipeline replacement<br />
15,000 188,100,000<br />
Install a 150mm pipeline from the 18" main<br />
at Sweet Spice restaurant to White Hall and<br />
the road towards Orange Hill<br />
6,000 75,240,000<br />
Extension 30 km of 500mm from Point to<br />
Logwood 30,000 475,800,000<br />
Telemetry System<br />
Sub-Total B<br />
20,000,000<br />
1,037,670,000<br />
D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />
33 | P a g e
C. General Non-Revenue Water Reduction<br />
NRW activities<br />
New flow/pressure zones and installation of<br />
gate valves, pressure sustaining valves, air<br />
valves, etc. throughout distribution.<br />
100,000,000<br />
DMA investigation (technical/commercial)<br />
and reconfiguration of sections of the water<br />
distribution system.<br />
150,000,000<br />
Other NRW reduction activities 50,000,000<br />
Sub-Total C 300,000,000<br />
D. Pipeline Replacement<br />
Replacement of 50 km of pipeline with<br />
300mm diameter pipeline<br />
Replacement of 10 km of pipeline with<br />
150mm pipeline<br />
Replacement of 10 km pipeline with 100<br />
mm pipeline<br />
50,000 1,146,500,000<br />
10,000 125,400,000<br />
10,000 121,400,000<br />
Sub-Total D 1,393,300,000<br />
E. Low Income Settlement Environmental<br />
Improvement<br />
Miscellaneous activities to address NRW in<br />
informal settlements<br />
20,000,000<br />
Sub-Total E 20,000,000<br />
Sub-Total A to E 3,150,970,000<br />
Engineering & Other Cost 630,194,000<br />
TOTAL 3,781,164,000<br />
34 | P a g e<br />
D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1
6.3 New Milns Demand Zone (H-1)<br />
6.3.1 System Description<br />
The New Milns Water Supply System obtains water from a spring source and provides<br />
an average of 106,400 gallons per day of water.<br />
6.3.2 Service Area<br />
The communities that are now served by the New Milns Supply System include New<br />
Milns, Haddington, Welcome, Top Hill, Cacoon, Temple and Black Gate<br />
6.3.3 Water Requirement<br />
The current population in the DC in Hanover that is served by the New Milns system is<br />
estimated to be 6,550 persons and this is expected to increase to 7,835 persons by 2030.<br />
There is an estimated supply deficit of 0.39 mgd when the water requirement is<br />
compared with the available production. This deficit is expected to increase to 0.48 mgd<br />
by 2030 if the supply conditions remain as they are today .<br />
6.3.4 Addressing the Supply Deficiencies<br />
The water supply infrastructure for the New Milns system is old and leaky, resulting in<br />
a significantly reduced level of service to customers that are supplied by this system.<br />
Also inter-connecting from the Black Gate 100mm gravity pipe supplied from the Great<br />
River Treatment Plant will help address the deficit.<br />
Rehabilitation of Water Storage Tank (0.03B)<br />
Rehabilitation/extension of Welcome storage capacity (existing tank need roof)<br />
Water Supply Enhancement (0.06B)<br />
Water supply from New Milns will be augmented by supply from the Woodland<br />
system to reduce the supply deficit. It will be taken at Black Gate and connected to the<br />
welcome water storage tank, via a new 4 km of 150mm pipeline that will be constructed.<br />
.<br />
General NRW Reduction activities<br />
D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />
35 | P a g e
An active leak detection campaign and repair of identified leaks will be undertaken.<br />
There will also be the establishment of appropriate flow/pressure zones and installation<br />
of gate valves, check valves, flow control valves, pressure sustaining valves, control<br />
mate, air valves throughout distribution<br />
Pipeline Replacement<br />
It is planned to replace about 1 km of the leaking 4 inch diameter galvanized iron<br />
pipeline from the New Milns Pump Station with 150 mm of PVC. In addition, provision<br />
has been made to replace other sections of the water supply network..<br />
Low Income Farming Settlement Environmental Improvement (0.008B)<br />
Reduction Water consumed or wasted at low income settlements to reduce the high NRW ratio<br />
D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />
36 | P a g e
6.3.1 Cost for Improvements<br />
The estimated total cost for the improvement works is $106.8M as shown below<br />
Activity Qnty Cost ($)<br />
Rehabiliation of water storage tank 10,000,000<br />
Install 4 km of 150 mm pipeline from Black Gate to<br />
the Welcome tank 4,000 38,980,000<br />
General NRW Reduction Activities 10,000,000<br />
Replace GI pipeline from New Milns pump station<br />
with 100mm PVC 1,000 10,005,000<br />
Provision for replacement of distribution network 2,000 20,010,000<br />
Sub-Total 88,995,000<br />
Engineering & Other Cost 17,799,000<br />
TOTAL<br />
106,794,000<br />
37 | P a g e<br />
D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1
6.4 Shettlewood Demand Zone (H-1)<br />
6.4.1 System Description<br />
The Shettlewood Water Supply System provides just under 80,000 gallons of water per<br />
day.<br />
6.4.2 Service Area<br />
The communities that are now served by the Shettlewood Water Supply System include:<br />
Chester Castle, Ramble, Knockalva, Copse, Pearces Village, Shettlewood, Friendship,<br />
Lethe, Eden, Burnt Ground, Ramble, Mt. Peto, Bessie Baker, Forrest, Mount Peto and<br />
Haddo<br />
6.4.3 Water Requirement<br />
The current population in the DC in Hanover that is served by the Shettlewood system<br />
is estimated to be 14,096 persons and this is expected to increase to 16, 862 persons by<br />
2030. There is an existing supply deficit of 0.92 mgd and it is projected that this will<br />
increase to 1.1 mgd by 2030 if the supply conditions remain as they are today .<br />
6.4.4 Addressing the Supply Deficiencies<br />
The raw water inlet valves are in very poor condition and will be replaced.<br />
Sections on the distribution experience excessively high pressures causing frequent<br />
main breaks and leaks.<br />
Treatment Plant and Intake Works Rehabilitation (0.07B)<br />
• Redesign and rehabilitation of Intake Works<br />
• Rehabilitation of Treatment Plant and to maximise production capacity<br />
• Supply of Spare parts and materials to sustain production efficiency capacity and Preventative<br />
maintenance<br />
Rehabilitation and Installation of Reservoir (0.09B)<br />
• Rehabilitation of Friendship Tank storage capacity<br />
• Installation of New Tank at Chester Castle, Copse and Macfield<br />
38 | P a g e<br />
D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1
Water Supply Enhancement (0.16B)<br />
• Lay 6 km new 150mm transmission pipe from Shettlewood to Mt Carey pumping Station, expansion of<br />
storage capacity and pumping station upgrade.<br />
General NRW Activities<br />
o Creation of new flow/pressure zones and installation of gate valves, check valves, flow control<br />
valves, pressure sustaining valves, control mate, air valves throughout distribution<br />
o Detailed micro DMA investigation (technical/commercial)<br />
o Reconfigure sections of the distribution system<br />
o Controls for all pumps within the distribution with pressure switch, timer, surge vessel to reduce<br />
energy and water loss<br />
o House to house service connection investigation, replacement, repairing leaks on service<br />
connection and Consumer to Customer conversion<br />
Rehabilitation and Reinforcement of Small, Medium and Large Diameter Pipe Network<br />
Replacement of 1’’ GI pipeline with 150mm to 100m from Axe and Daze to Chigwell<br />
Low Income Settlement Environmental Improvement (0.01)<br />
• Low Income settlement (Red area) water supply and billing improvement.<br />
• Reduction Water consumed or wasted at low income settlements to reduce the high NRW ratio<br />
• Improve service by giving one connection per property with meter.<br />
• Abatement of Illegal Connections and conversion to active accounts<br />
D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />
39 | P a g e
6.4.1 Cost for Improvements<br />
The estimated total cost for the improvement works is $473.1M as shown below<br />
Activity Qnty Cost ($)<br />
Rehabilitation and upgrade of treatment plant to<br />
increase Production.<br />
120,000,000<br />
Rehabilitation and Installation of Reservoir 90,000,000<br />
Install 6 km new 150mm transmission pipeline<br />
from Shettlewood to Mt Carey pumping Station 6,000<br />
75,240,000<br />
Expansion of storage capacity and pumping<br />
station upgrade. 30,000,000<br />
Provision for replacement of distribution mains in<br />
supply area 4,000 38,980,000<br />
General NRW Activities 40,000,000<br />
Sub-Total 394,220,000<br />
Engineering & Other Cost 78,844,000<br />
40 | P a g e<br />
D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1
TOTAL<br />
473,064,000<br />
41 | P a g e<br />
D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1