NATIONAL WATER COMMISSION HANOVER PARISH PLAN

NATIONAL WATER COMMISSION HANOVER PARISH PLAN

NATIONAL WATER COMMISSION HANOVER PARISH PLAN

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>NATIONAL</strong> <strong>WATER</strong> <strong>COMMISSION</strong><br />

<strong>HANOVER</strong> <strong>PARISH</strong> <strong>PLAN</strong><br />

D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />

1 | P a g e


D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />

2 | P a g e


1 Introduction<br />

Hanover is located on the North Western side of Jamaica and is bordered on the<br />

east by St. James, and on the South by the parishes of Westmoreland; the<br />

Caribbean Sea forms the northern and western boundary of the parish. The parish<br />

has a mountainous terrain, with the coastline marked by coves and bays. Hanover<br />

covers an area of 430 km 2 . The highest point in the parish is the Dolphin's Head,<br />

which serves as a landmark for ships at sea. The parish has three small waterfalls,<br />

several coves, such as the Davis Cove, named after a prominent Hanover family,<br />

along its coastline and large caves. In the centre of Lucea stands a clock tower.<br />

Though it was installed in 1817, it is still fully functional.<br />

. Hanover is known for the production of yams, sugar cane, ginger, rice, pimento,<br />

turmeric, breadfruit and arrowroot. Hanover is celebrated for its fine breeds of cattle.<br />

The principal towns are Lucea, Green Island, Hopewell, and Sandy Bay.<br />

The tourism industry has played a major role in the economic activity of the parish.<br />

A deep-water pier was built, but this has been restricted only to the shipping of molasses. In<br />

1983, the port was closed, but the old Fort Charlotte still stands at one side of the entrance<br />

to the harbour. The major hotels are located along the coastline.<br />

National Water Commission (NWC) produces some 635,457 m3/month of water per<br />

month in Hanover through five (5) surface sources. The average billed volume from<br />

16,813 accounts is only 275,695 m 3 /month which translates to average nonrevenue<br />

water (NRW) of 359,762 m 3 /month i.e. 57% of production. This<br />

unacceptable level of NRW has had an adverse impact on the level of service<br />

provided to the people of the parish, on its financial performance and that of NWC.<br />

NWC now provides water to some 80.78% of the population in Hanover, which is a<br />

marginal improvement over that in 2001 when the level of coverage was 74%. The<br />

reliability of service to those who are served by NWC is estimated to average 18<br />

hours per day. The average utilization rate of the parish is 79.70%. Total length of<br />

pipeline within the parish is 455 km with varying material types from CI, AC, GI,<br />

PVC, ST and DI.<br />

A Water Supply Improvement plan has been prepared for the parish and is<br />

presented in this document. The WSIP for the parish will involve an expenditure of<br />

$5.4732 billion over the next twenty years in carrying out a number of water supply<br />

rehabilitation and upgrading works. A substantial portion of the proposed works is<br />

aimed at addressing the unacceptable level of NRW through the replacement of<br />

major sections of the aged and undersized water supply infrastructure and<br />

D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />

3 | P a g e


improvement in water supply pressure management. It is planned to increase water<br />

supply coverage to 93% of the parish population by end 2030, reduction in NRW to<br />

30% and service reliability to 24 hours per day at that time.<br />

2 Existing Water Supply System<br />

2.1 Water Resource<br />

Surface Water<br />

Some 100% of the water abstracted in the parish is obtained from surface sources.<br />

The following are the main surface sources in the parish:<br />

Shettlewood Spring<br />

Cascade<br />

New Milns<br />

Logwood<br />

Kendal<br />

2.2 Water Supply Systems<br />

The water supply network throughout the parish is aged and undersized,<br />

contributing to unacceptable level of service there. Information on the water supply<br />

network is summarized in table 2.1 below.<br />

Figure 2.1 – Hanover Water Supply<br />

D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />

4 | P a g e


D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />

5 | P a g e


Table 2.1 – Summary Information on Hanover Pipe Network<br />

Pipe<br />

Diameter<br />

(inches)<br />

Approximate<br />

Length (km)<br />

Portion of<br />

the<br />

Network<br />

(%)<br />

0.50 5.77 1.30%<br />

0.75 12.79 2.88%<br />

1 44.13 9.94%<br />

2 19.82 4.47%<br />

2 111.68 25.16%<br />

3 41.74 9.40%<br />

4 80.61 18.16%<br />

6 31.87 7.18%<br />

8 15.35 3.46%<br />

9 0.89 0.20%<br />

10 19.78 4.46%<br />

12 31.63 7.13%<br />

14 0.90 0.20%<br />

18 6.79 1.53%<br />

20 20.10 4.53%<br />

443.85<br />

3 NON-REVENUE <strong>WATER</strong> LEVELS<br />

Set out in figure 3.1 is the annual water balance for Hanover. This was derived from<br />

the water balances that were prepared for each of the water supply systems in the<br />

parish. The water balances are based on flow measurements that were conducted<br />

for sections of the water supply network as well as examinations of customer<br />

records.<br />

NWC water production facilities in the parish provide approximately 7.5 million cubic<br />

meters (1.7 billion gallons) of water per year to the water supply network. Physical<br />

losses amount to 3.5 million cubic meters (0.77 billion gallons) per year. This<br />

represents 46.8% of the amount produced.<br />

D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />

6 | P a g e


Revenue water in the parish is only 3.3 million cubic meters, which is 42.6% of the<br />

water produced. The remaining 0.7 million cubic meters relate to commercial<br />

losses.It would be noted that 0.61M cubic meters of water is attributed to<br />

unauthorized consumption (i.e. 8.1% of production). This is largely due to illegal<br />

connections to sections of the water transmission main for use in informal<br />

settlements.<br />

D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />

7 | P a g e


Figure 3.1 – Water Balance for Hanover<br />

8 | P a g e<br />

D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1


4 Water Requirement<br />

4.1 Parish Population<br />

General<br />

In 2001 the population in Hanover was 67,067, which was a 1.01% increase over the<br />

66,108 in 1991. Based on an annual population growth rate of 1.01%, it is estimated<br />

that the population in the parish in 2010 is 67,884 persons.<br />

There were 16,767 households in 2001 of which 12,228 had piped water (74%). There<br />

are now 16,817 customer accounts. Based on this information, it is estimated there was<br />

a 2% increase in the number of dwellings with piped since 2001, an average annual<br />

increase of 0.4%. It is estimated that 80.8% of the population of the parish now has<br />

piped water.<br />

Demand Centres<br />

The enumeration districts (EDs) that were used in the 2001 population census was used<br />

to establish priority areas that will be targeted to be provided with water supply. EDs<br />

with population densities in excess of 150 persons per square kilometres were grouped<br />

to form these demand centres.<br />

Figure 4.1 – Demand Centres<br />

D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />

9 | P a g e


Pipeline<br />

TYPES OF DATA<br />

Subdivision<br />

Enumeration<br />

District (ED)<br />

- Population Data<br />

<strong>WATER</strong> DEMAND CENTRES<br />

Light Blue Shaded EDs<br />

-Pop > 150p/sq Km<br />

-Priority given to fully supply<br />

Pump<br />

Station<br />

As far as possible, each demand centre (DC) is linked to a water supply system. It is<br />

related to a water distribution system that now serves it or has the potential to serve by<br />

it.<br />

Set out in table 4.1 is information showing the population in each DC, indicating<br />

estimates for 2010, 2015, 2030.<br />

Name of<br />

Water Supply<br />

System<br />

Population<br />

to be Served<br />

2010<br />

Population<br />

to be Served<br />

2015<br />

Population<br />

to be Served<br />

2020<br />

Population<br />

to be Served<br />

2025<br />

Population<br />

to be Served<br />

2030<br />

CASCADE 3,100 3,534 4,029 4,593 5,236<br />

KENDAL 2,555 2,913 3,320 3,785 4,315<br />

NEW MILNS 6,550 7,467 8,512 9,704 11,063<br />

SHTTLEWOOD 14,096 16,069 18,319 20,884 23,808<br />

LOGWOOD 57,285 65,305 74,448 84,870 96,752<br />

The estimated total 2010 population in the DCs is shown to be 6,374 (9.4% of parish<br />

population)<br />

D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />

10 | P a g e


4.2 Current Water Requirement<br />

Supply<br />

System<br />

Production<br />

gal/day)<br />

Population<br />

Domestic<br />

Water<br />

Requirement<br />

(gal/day)<br />

Commercial &<br />

Other Water<br />

Requirement<br />

(gal/day)<br />

Technical<br />

Losses<br />

(gal/day)<br />

Total Water<br />

Requirement<br />

(gal/day)<br />

Supply<br />

Surplus/Deficit<br />

(gal/day)<br />

Cascade 28,650 3,100 124,000 13,778 13,179 150,957 (122,307)<br />

Kendal 41,600 2,555 102,200 11,356 19,136 132,692 (91,092)<br />

New Milns 106,400 6,550 262,000 29,111 48,944 340,055 (233,655)<br />

Shettlewood 567,721 14,096 563,840 62,649 261,151 887,640 (319,920)<br />

Logwood 5,408,083 57,285 2,291,400 1,659,290 2,487,718 6,438,408 (1,030,325)<br />

TOTAL 6,152,453 83,586 3,343,440 1,776,183 2,830,128 7,949,751 (1,797,298)<br />

The current water supply situation in Hanover is that, overall, there is insufficient<br />

water in the parish to meet the water requirement, even with the existing technical<br />

losses (leaks, tank overflows, etc). There is a current water supply shortfall of some<br />

2.7 mgd based on the existing water production levels and the water requirement in<br />

the Demand Zones combined.<br />

The average daily water production in the parish is 5.7 mg; the average day water<br />

requirement (domestic, commercial, institutional, etc) in the Demand Zones is<br />

estimated to be 5.8 mgd. Technical losses estimated to be 2.7 mgd.<br />

Set out in the tables below are water supply scenarios based on whether the level<br />

of technical losses are addressed and reduced to 30% at most or the conditions<br />

remain the same. It would be noted that the deficit would increase to 3.8 mgd.<br />

Water Requirement in 2030 – Supply Conditions Remain Unchanged<br />

Supply<br />

System<br />

Production<br />

gal/day)<br />

Population<br />

Domestic<br />

Water<br />

Requirement<br />

(gal/day)<br />

<strong>HANOVER</strong> - YR 2030<br />

Commercial &<br />

Other Water<br />

Requirement<br />

(gal/day)<br />

D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />

Technical<br />

Losses<br />

(gal/day)<br />

Total Water<br />

Requirement<br />

(gal/day)<br />

Supply<br />

Surplus/Deficit<br />

(gal/day)<br />

Cascade 28,650 3,708 148,335 16,482 13,179 177,996 (149,346)<br />

Kendal 41,600 3,056 122,257 13,584 19,136 154,977 (113,377)<br />

New Milns 106,400 7,835 313,418 34,824 48,944 397,187 (290,787)<br />

Shettlewood 567,721 16,862 674,496 74,944 261,151 1,010,591 (442,871)<br />

Logwood 5,408,083 68,527 2,741,096 1,984,932 2,487,718 7,213,745 (1,805,663)<br />

11 | P a g e


TOTAL 6,152,453 99,990 3,999,603 2,124,766 2,830,128 8,954,497 (2,802,044)<br />

D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />

12 | P a g e


Water Requirement in 2015 - NRW reduced to 30% of Production<br />

Supply<br />

System<br />

Production<br />

gal/day)<br />

<strong>HANOVER</strong> - YR 2015 - NRW Reduced to 30%<br />

Commercial<br />

Domestic & Other<br />

Water Water Technical<br />

Requirement Requirement Losses<br />

Population (gal/day) (gal/day) (gal/day)<br />

Total Water<br />

Requirement<br />

(gal/day)<br />

Supply<br />

Surplus/Deficit<br />

(gal/day)<br />

Cascade 32,300 3,242 129,681 14,409 9,690 153,780 (121,480)<br />

Kendal 49,400 2,672 106,883 11,876 14,820 133,578 (84,178)<br />

New Milns 126,350 6,850 274,004 30,445 37,905 342,354 (216,004)<br />

Shettlewood 617,500 14,742 589,674 65,519 185,250 840,443 (222,943)<br />

Logwood 7,125,000 59,910 2,396,386 1,735,314 2,137,500 6,269,200 855,800<br />

TOTAL 7,950,550 87,416 3,496,627 1,857,563 2,385,165 7,739,355 211,195<br />

Water Requirement in 2030 - NRW reduced to 30% of Production<br />

Supply<br />

System<br />

Production<br />

gal/day)<br />

<strong>HANOVER</strong> - YR 2030 - NRW Reduced to 30%<br />

Commercial<br />

Domestic & Other<br />

Water Water Technical<br />

Requirement Requirement Losses<br />

Population (gal/day) (gal/day) (gal/day)<br />

Total Water<br />

Requirement<br />

(gal/day)<br />

Supply<br />

Surplus/Deficit<br />

(gal/day)<br />

Cascade 32,300 3,708 148,335 16,482 9,690 174,507 (142,207)<br />

Kendal 49,400 3,056 122,257 13,584 14,820 150,661 (101,261)<br />

New Milns 126,350 7,835 313,418 34,824 37,905 386,148 (259,798)<br />

Shettlewood 617,500 16,862 674,496 74,944 185,250 934,690 (317,190)<br />

Logwood 7,125,000 68,527 2,741,096 1,984,932 2,137,500 6,863,527 261,473<br />

TOTAL 7,950,550 99,990 3,999,603 2,124,766 2,385,165 8,509,533 (558,983)<br />

.<br />

D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />

13 | P a g e


5 Water Supply Improvement Plans<br />

The improvement to the water supply in Hanover will be based on<br />

(a) Reducing the level of technical losses due to the aged water supply network;<br />

(b) Rehabilitating the water facilities to increase output.<br />

NWC has committed to significantly reduce the high level of NRW in the parish of<br />

Hanover. This will include pipeline replacement works and improved pressure<br />

management.<br />

The Logwood Water Treatment Plant is the major plant in the parish, with an installed<br />

treatment capacity of 7.5 mgd. Its average production in recent years has been 5.4 mgd.<br />

The projects will be packaged as presented below. Details on the undertakings are<br />

provided in section 6.<br />

5.2.1 Component A<br />

• Water Treatment Plant and Intake Works Rehabilitation<br />

o Redesign and rehabilitation of Intake Works<br />

o Supply of Spare parts and materials<br />

o Additional stand-by Generating capacity<br />

o New High – lift motors<br />

o Painting of Clarifiers and Filters<br />

5.2.2 Component B<br />

• Rehabilitation, Construction and Expansion of Reservoir<br />

o Rehabilitation and reinstatement of Fish River storage Tank.<br />

o Rehabilitation of Malcolm Heights storage Tank.<br />

o Rehabilitation/extension of Welcome storage Tank.<br />

o New tank at McQuarie.<br />

o Rehabilitation of Friendship Tank storage.<br />

o Installation of New Tank at Chester Castle, Copse and Macfield.<br />

D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />

14 | P a g e


5.2.3 Component C<br />

• Water Supply Enhancement<br />

o Water Supply system from Black Gate to Welcome Tank.<br />

o Upgrading Sea View, Lookout and Bamboo Water Supply System.<br />

o Cascade, Jericho, Cold Spring and Pondside Water Supply System.<br />

o Brighton Water Supply - Upgrading of the NONPARIEL Water Supply<br />

System.<br />

o Interconnection Logwood system with Bulstrode at Sheffield.<br />

o White Hall and Orange Hill Water Supply.<br />

o Extension of 4.5 km of new 100mm pipe from Keep Left in Lucea to Dry Hill.<br />

o Extension 30 km of 500mm from Point to Logwood.<br />

o Watershed Development in Rural Hanover<br />

o Lay 6 km transmission pipe from Shettlewood to Mt Carey pumping Station.<br />

5.2.4 Component D<br />

• Supply of materials and Equipment and do General NRW reduction<br />

o Active leak detection and Repair.<br />

o Creation of new flow/pressure zones and installation valves.<br />

o Detailed micro DMA investigation (technical/commercial)<br />

o Reconfigure sections of the distribution system<br />

o Controls for all pumps within the distribution.<br />

o House to house service connection investigation and replacement.<br />

o Metering, sizing, replacement and Geo referencing of all customers.<br />

o CS Analysis.<br />

o Updating Hydraulic Model to further simulate the distribution.<br />

o Installation of SCADA system.<br />

D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />

15 | P a g e


5.2.5 Component E<br />

• Pipeline Replacement Plan<br />

o Replace 6 km of 4” pipe in Lucea.<br />

o Replace 16 km of 12’’ CI & AC with 250mm From Orange Bay PRV to Negril<br />

PRV.<br />

o Replace 21 km of 12’’ AC From Orange Bay PRV to Bulls Bay.<br />

o Replace 2.3 km of 12’’ AC from Rusea’s boundary valve to Malcolm Heights<br />

Tank.<br />

o Replace 2.3 km of 6" AC line that runs from the highway to Prospect and<br />

Kendall.<br />

o Replace 7 km of 4” GI from Summerset road to Westend road.<br />

o Replace 4 km of 12’’ AC from Keep Left to Molasses Tank.<br />

o Replace and upgrade 0.6 km of 3’’ GI from Cambleton to March Town.<br />

o Replace 1 km of 4’’ GI from New Milns Pump Station to Welcome Tank.<br />

o Replace 2 km of 1’’ GI from Axe and Daze to Chigwell.<br />

5.2.6 Component F<br />

• Low Income Settlement Improvement<br />

o Low Income settlement (Red area) water supply and billing improvement.<br />

o Reduction Water consumed or wasted at low income settlements to reduce<br />

the high NRW ratio<br />

o<br />

Improve service by giving one connection per property with meter.<br />

o Abatement of Illegal Connections and conversion to active accounts<br />

5.2.7 Component G<br />

• Pumping Station and Well Rehabilitation<br />

o Rehabilitation of Kendal Intake Sump.<br />

o Shettlewood Intake.<br />

D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />

16 | P a g e


5.1 Expected Benefits<br />

The detailed audit of the Hanover Supply system will provide information that will be<br />

used to help in defining detailed NRW reduction intervention activities. The results<br />

of the audit will be used to target the most critical sections of the parish water<br />

supply system that require attention and assist in scheduling of the required works.<br />

The information will be used to populate the asset database for the parish which will<br />

form a critical part of the asset management system (AMS) that will be established<br />

for Hanover. A fully functional AMS will be a valuable operational tool that can be<br />

used to sustain the benefits that will be derived from the various projects and<br />

activities that are set out in this document.<br />

Improved network infrastructure<br />

• DMAs, pressure zones, SCADA etc.<br />

Improved network data quality (GIS)<br />

Improved asset management planning<br />

High quality and continuous water supply service<br />

Hydraulic network model<br />

Extension of Service areas<br />

Operational Improvements and Energy savings<br />

Utility staff development<br />

• Specialist technical and managerial know-how<br />

• New technology and the know-how to use it efficiently<br />

D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />

17 | P a g e


5.1.1 Cost for Improvements - Summary<br />

Item No. Proposed Project for NRW Reduction in Hanover<br />

Budget Cost<br />

in $JB<br />

1<br />

2<br />

Component A<br />

Water Treatment Plant and Intake Works Rehabilitation<br />

Component B<br />

Rehabilitation, Construction and Expansion of<br />

Reservoir<br />

0.3<br />

0.27<br />

3<br />

Component C<br />

Water Supply Enhancement 1.63<br />

4<br />

Component D<br />

Supply of materials and Equipment and do General<br />

NRW reduction<br />

0.41<br />

5<br />

6<br />

7<br />

Component E<br />

Pipeline Replacement Plan 1.826<br />

Component F<br />

0.045<br />

Low Income Settlement Improvement<br />

Component G<br />

Pumping Station and Well Rehabilitation 0.08<br />

8<br />

Sub-Total - Works<br />

Consultancy Engineering Designs:<br />

Consultancy, audit, Engineering Designs and<br />

Construction Supervision Services ~ 20%<br />

4.561<br />

0.9122<br />

Budget : Grand Total 5.4732<br />

18 | P a g e<br />

D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1


5.1.2 Economic Assessment<br />

19 | P a g e<br />

D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1


6 Water Supply Projects<br />

6.1 Cascade Demand Zone (H-1)<br />

6.1.1 System Description<br />

Cascade Water Supply System is supplied by a small spring source with an average output<br />

of 35,000 gallons per day.<br />

6.1.2 Service Area<br />

The communities served by the Cascade Water Supply System include: Cascade, Pondside,<br />

Great Valley, Jericho, Retrieve, Claremount, Smithfield, Willoughby and Cold Spring.<br />

6.1.3 Water Requirement<br />

The current population in the DC in Hanover that is served by the Cascade system is<br />

estimated to be 3,100 persons and this is expected to increase to 3,708 persons by 2030.<br />

There is an existing supply deficit of 0.2 mgd and it is projected that this will marginally<br />

increase to 0.24 mgd by 2030 if the supply conditions remain as they are today .<br />

6.1.4 Addressing the Supply Deficiencies<br />

Water Supply Enhancement<br />

It is planned to connect the Cascade Water Supply System to the Great River Water Supply<br />

System, after the Great River Water Treatment Plant is refurbished to produce at its<br />

maximum. This will involve linking to the pumping system from the new 500 mm pipeline<br />

at Mosquito Cove. The proposed project will include the installation of 10km of 150mm<br />

pipe line, two Booster station and the construction of a new 50,000 gallon water storage<br />

tank.<br />

D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />

20 | P a g e


Miscellaneous Non-Revenue Water Reduction NRW<br />

It is planned to carry out miscellaneous non-revenue water activities on the Cascade water<br />

supply system to include:<br />

• Creation of new flow/pressure zones and installation of gate valves, check valves,<br />

flow control valves, pressure sustaining valves, control mate, air valves throughout<br />

distribution<br />

• Detailed micro DMA investigation (technical/commercial)<br />

• Controls for all pumps within the distribution with pressure switch, timer, surge<br />

vessel to reduce energy and water loss<br />

• House to house service connection investigation, replacement, repairing leaks on<br />

service connection and Consumer to Customer conversion<br />

• Installation of a new telemetry system for flow, level, pressure and water quality<br />

and to create an electronic library including flow, level and pressure data collected<br />

in the past years<br />

Low Income Farming Settlement Environmental Improvement<br />

It is planned to rationalize the supply arrangements in the low income settlements to<br />

reduce the level of commercial losses, providing one connection to each property and<br />

generally converting properties with illegal connections to active customers<br />

D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />

21 | P a g e


6.1.5 Cost for Improvements<br />

The estimated total cost for the improvement works is $234M as shown below.<br />

Activity Qnty Cost ($)<br />

Installation of 10 km 150 mm DI pipeline 10,000 125,400,000<br />

Construction of booster station and Tank 4,600,000<br />

Miscellaneous NRW activities 50,000,000<br />

Rationalizing supply arrangement in low<br />

income communities<br />

15,000,000<br />

Sub-Total 195,000,000<br />

Engineering & Other Cost 39,000,000<br />

TOTAL 234,000,000<br />

6.1.6 Economic Assessment<br />

22 | P a g e<br />

D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1


6.2 Kendal Demand Zone (H-2)<br />

6.2.1 System Description<br />

The Kendal Water Supply System is supplied by a small spring source with an average<br />

output of 41,600 gallons per day.<br />

6.2.2 Service Area<br />

The communities served by the Kendal Water Supply System include Kendal, Kendal Top,<br />

Cessnock, Lower and Upper Rock Spring, Grange, Munro and Crib.<br />

6.2.3 Water Requirement<br />

The current population in the DC in Hanover that is served by the system is estimated to<br />

be 2,555 persons and this is expected to increase to 2,672 persons by 2030. There is an<br />

existing supply deficit of 0.15 mgd and it is projected that this will marginally increase to<br />

0.19 mgd by 2030 if the supply conditions remain as they are today .<br />

6.2.1 Addressing the Supply Deficiencies<br />

Intake Works and Pumping Station Rehabilitation<br />

It is planned to repair the sump for the pumping unit at the intake works at the source to<br />

minimize water losses and increase production. Also to include the inter-connection with<br />

150mm pipeline from Logwood system to Prospect to help meet deficit.<br />

Installation of Reservoir (0.02B)<br />

It is planned to design and site a new water storage capacity for the Kendal system.<br />

Miscellaneous Non-Revenue Water Reduction NRW<br />

It is planned to carry out miscellaneous non-revenue water activities on the Kendal water<br />

supply system. These will include house to house service connection investigation,<br />

replacement, repairing leaks on service connection and conversion of illegal users to active<br />

customers.<br />

D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />

23 | P a g e


Pipeline Replacement/Upgrading<br />

Pipeline replacement will be undertaken as follows:<br />

• Replacement of 1.3 km of 2’’ GI Pipe with 100mm from Kendal to Grange to<br />

improve supply and meet the demand.<br />

• Replacement of 3 km of Pipe 3’’ GI with 100mm from Kendal to Grange to improve<br />

supply and meet the demand.<br />

D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />

24 | P a g e


6.2.2 Cost for Improvements<br />

The estimated total cost for the improvement works is $118.7M as shown below.<br />

Activity Qnty Cost ($)<br />

Rehabilitation of source intake works 10,000,000<br />

Construction of new water storage tank 20,000,000<br />

Miscellaneous NRW activities 20,000,000<br />

Replacement of 1.3 km of 2’’ GI Pipe with<br />

100mm from Kendal to Grange to improve<br />

supply and meet the demand.<br />

Replacement of 3 km of Pipe 3’’ GI with<br />

100mm from Kendal to Grange to improve<br />

supply and meet the demand.<br />

Rationalizing supply arrangement in low<br />

income communities.<br />

1,300 12,668,500<br />

3,000 29,235,000<br />

7,000,000<br />

Sub-Total 98,903,500<br />

Engineering & Other Cost 19,780,700<br />

TOTAL 118,684,200<br />

25 | P a g e<br />

D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1


6.2.1 Economic Assessment<br />

26 | P a g e<br />

D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1


Logwood Demand Zone (H-3)<br />

6.2.2 System Description<br />

The Logwood Water Supply System is the major system in Hanover. It is supplied by the<br />

Logwood Water Treatment Plant that has an installed capacity of 7.5 mgd. This plant is<br />

operating below capacity due to certain operational challenges and the state of some<br />

elements of this plant as outlined below.<br />

6.2.3 Service Area<br />

The communities that are now served by the Logwood Supply System include:<br />

First Hill, Bachelors, St. Simon, Bloody Bay, Logwood, Sheffield, Negril West End,<br />

March Town, Cave Valley, Santoy, Orange Bay, Green Island, Salt Spring, Lucea,<br />

Esher, Elgin Town, Malcolm Heights, Haughton Court, Claudwell, Ginger Hill, Pell<br />

River, First Hill, Prospect, Friendship, Rhodes Hall, Lances Bay, Bull Bay, Nonperiel,<br />

Red Ground, Good Hope, Mt Airy, Retreat, Orange Hill, Retirement, Brighton, Spring<br />

Gardens, Silver Spring, Archwell, Green River<br />

6.2.4 Water Requirement<br />

The current population in the DC in Hanover that is served by the system is estimated<br />

to be 57,285 persons and this is expected to increase to 68,527 persons by 2030. There is<br />

an existing deficit of 1.0 mgd and it is projected that this will marginally increase to 1.8<br />

mgd by 2030 if the supply conditions remain as they are today .<br />

6.2.5 Addressing the Supply Deficiencies<br />

Some of the issues now being experienced in the Logwood water supply system<br />

include:<br />

• Reduction in flow through the intake to the Logwood plant by up to 20% during<br />

periods of drought<br />

• There is need to provide the additional two raw water pumps for which<br />

provision was made<br />

• The treatment plant is not capable of producing water at its designed 7.5mgd<br />

capacity because only three of eight pumps at clear water well are operational.<br />

D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />

27 | P a g e


• Sections on the distribution to Lucea and Negril experience excessively high<br />

pressures and there are losses primarily from the aged asbestos cement and cast<br />

iron type distribution network.<br />

The planned works are presented below.<br />

Treatment Plant and Intake Works Rehabilitation<br />

• Rehabilitation of Intake Works<br />

• Rehabilitation of Logwood Treatment Plant pumping capacity to maximise<br />

production<br />

• Supply of Spare parts and materials to sustain production efficiency capacity<br />

and Preventative maintenance<br />

• Power factor correction at Logwood WTP.<br />

Rehabilitation and expansion of Reservoir<br />

• Rehabilitation and reinstatement of Fish River storage Tank<br />

• Rehabilitation of Malcolm Heights storage Tank to be supplied from Logwood<br />

Water Supply Enhancement<br />

• Brighton Water Supply - Interconnection of the Non Pariel pump station from<br />

the 18 inch diameter pipeline from the Logwood Treatment plant, install<br />

pipeline and pumps to deliver water to Brighton and environs from Nonpariel.<br />

Install 3 km of 150mm pipes, Procure & install a 100,000 gallon water storage<br />

tank and construct a booster station.<br />

• Interconnection from the 18" (coming from Logwood, reaching the Highway) at<br />

the taxi stop in the highway towards Savanna, near to Negril Spots, with the 8"<br />

pipeline that was started four years ago. Interconnection should be provided<br />

with a PRV because the pressure is about 15 bar from the main.<br />

• Basic Telemetry system connecting Red Ground with Logwood WTP. The<br />

system shall be able to show 5 different levels of the reservoir to the operator in<br />

order to decide when to stop 2 pumps and keep running one for network<br />

balanced operation.<br />

• At Negril area, to interconnect and install a 150mm pipeline from the 18" main at<br />

Sweet Spice restaurant with meter and PRV supplying White Hall and the road<br />

towards Orange Hill. This will involve the use of the Redground and Westland<br />

water storage tanks.<br />

D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />

28 | P a g e


• Extension of 4.5 km of new 100mm pipe from Keep Left in Lucea to Dry Hill<br />

• Extension 30 km of 500mm from Point to Logwood.<br />

D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />

29 | P a g e


General Non-Revenue Water Reduction NRW<br />

• Active leak detection and Repair of detected leaks<br />

• Creation of new flow/pressure zones and installation of gate valves, check<br />

valves, flow control valves, pressure sustaining valves, control mate, air valves<br />

throughout distribution<br />

• Detailed micro DMA investigation (technical/commercial)<br />

• Reconfigure sections of the distribution system<br />

• Controls for all pumps within the distribution with pressure switch, timer, surge<br />

vessel to reduce energy and water loss<br />

• House to house service connection investigation, replacement, repairing leaks on<br />

service connection and Consumer to Customer conversion<br />

• Metering and Geo referencing of all customers. Macro and micro metering,<br />

sizing, maintenance and replacement<br />

• CS Analysis<br />

• Updating Hydraulic Model to further simulate the distribution<br />

• Installation of SCADA (Supervisory control and data acquisition) system to<br />

monitor Flow, pressure, water quality and level in real time<br />

Rehabilitation and Reinforcement of Small, Medium and Large Diameter Pipe Network<br />

• Replacement of 16 km of Pipe 12’’ CI & AC with 250mm From Orange Bay PRV<br />

to Negril PRV<br />

• Replacement of 21 km of Pipe 12’’ AC with 300mm From Orange Bay PRV to<br />

Bulls Bay<br />

• Replacement of 2.3 km of Pipe 12’’ AC with 300mm From Rusea’s boundary<br />

valve to Malcolm Heights Tank and interconnect with to 250mm PVC at keep<br />

left in Lucea.<br />

• (Prospect): 2.3 km of Replacement of the 6" AC line that runs from the highway<br />

towards Prospect and Kendall<br />

• Replace 7 km of 4” GI with 150mm pipe from Summerset road to Westend road.<br />

• Replacement of 21 km of Pipe 12’’ AC with 300mm From Orange Bay PRV to<br />

Bulls Bay<br />

• Replacement of 4 km of Pipe 12’’ AC with 300mm From Keep Left to Lucea PRV<br />

at Molasses Tank<br />

D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />

30 | P a g e


• Replacement and upgrading of 0.6 km of Pipe 3’’ GI with 100mm From<br />

Cambleton to March Town intersection<br />

D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />

31 | P a g e


Low Income Settlement Environmental Improvement<br />

• Reduction Water consumed or wasted at low income settlements to reduce the<br />

high NRW ratio<br />

• Improve service by giving one connection per property with meter.<br />

• Abatement of Illegal Connections and conversion to active accounts<br />

D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />

32 | P a g e


6.2.6 Cost for Improvements<br />

The estimated total cost for the improvement works is $3,781.2.7M as shown below.<br />

Activity Qnty Cost ($)<br />

A. Treatment Plant and Intake Works and<br />

Storage Tank Rehabilitation<br />

Rehabilitation of the Logwood WTP to<br />

restore facility to produce at its design level. 300,000,000<br />

Expansion of the water storage tank at Fish<br />

River and Malcolm Heights. 100,000,000<br />

Sub-Total A<br />

400,000,000<br />

B. Water Supply Enhancement<br />

Install 3 km of 150mm pipeline from<br />

Non Pariel to Brighton 3,000 37,620,000<br />

Other pipeline installation to improve<br />

service to Non-Pariel 6,000 75,240,000<br />

Construct 100K water storage tank<br />

14,000,000<br />

Construct & equip booster station<br />

20,000,000<br />

Install 4.5 km of new 150mm pipe from<br />

Keep Left in Lucea to Dry Hill 4,500 56,430,000<br />

Install 150 mm pipeline from the Negril<br />

Highway at "taxi stop" to Savanna 6,000 75,240,000<br />

Provision for pipeline replacement<br />

15,000 188,100,000<br />

Install a 150mm pipeline from the 18" main<br />

at Sweet Spice restaurant to White Hall and<br />

the road towards Orange Hill<br />

6,000 75,240,000<br />

Extension 30 km of 500mm from Point to<br />

Logwood 30,000 475,800,000<br />

Telemetry System<br />

Sub-Total B<br />

20,000,000<br />

1,037,670,000<br />

D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />

33 | P a g e


C. General Non-Revenue Water Reduction<br />

NRW activities<br />

New flow/pressure zones and installation of<br />

gate valves, pressure sustaining valves, air<br />

valves, etc. throughout distribution.<br />

100,000,000<br />

DMA investigation (technical/commercial)<br />

and reconfiguration of sections of the water<br />

distribution system.<br />

150,000,000<br />

Other NRW reduction activities 50,000,000<br />

Sub-Total C 300,000,000<br />

D. Pipeline Replacement<br />

Replacement of 50 km of pipeline with<br />

300mm diameter pipeline<br />

Replacement of 10 km of pipeline with<br />

150mm pipeline<br />

Replacement of 10 km pipeline with 100<br />

mm pipeline<br />

50,000 1,146,500,000<br />

10,000 125,400,000<br />

10,000 121,400,000<br />

Sub-Total D 1,393,300,000<br />

E. Low Income Settlement Environmental<br />

Improvement<br />

Miscellaneous activities to address NRW in<br />

informal settlements<br />

20,000,000<br />

Sub-Total E 20,000,000<br />

Sub-Total A to E 3,150,970,000<br />

Engineering & Other Cost 630,194,000<br />

TOTAL 3,781,164,000<br />

34 | P a g e<br />

D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1


6.3 New Milns Demand Zone (H-1)<br />

6.3.1 System Description<br />

The New Milns Water Supply System obtains water from a spring source and provides<br />

an average of 106,400 gallons per day of water.<br />

6.3.2 Service Area<br />

The communities that are now served by the New Milns Supply System include New<br />

Milns, Haddington, Welcome, Top Hill, Cacoon, Temple and Black Gate<br />

6.3.3 Water Requirement<br />

The current population in the DC in Hanover that is served by the New Milns system is<br />

estimated to be 6,550 persons and this is expected to increase to 7,835 persons by 2030.<br />

There is an estimated supply deficit of 0.39 mgd when the water requirement is<br />

compared with the available production. This deficit is expected to increase to 0.48 mgd<br />

by 2030 if the supply conditions remain as they are today .<br />

6.3.4 Addressing the Supply Deficiencies<br />

The water supply infrastructure for the New Milns system is old and leaky, resulting in<br />

a significantly reduced level of service to customers that are supplied by this system.<br />

Also inter-connecting from the Black Gate 100mm gravity pipe supplied from the Great<br />

River Treatment Plant will help address the deficit.<br />

Rehabilitation of Water Storage Tank (0.03B)<br />

Rehabilitation/extension of Welcome storage capacity (existing tank need roof)<br />

Water Supply Enhancement (0.06B)<br />

Water supply from New Milns will be augmented by supply from the Woodland<br />

system to reduce the supply deficit. It will be taken at Black Gate and connected to the<br />

welcome water storage tank, via a new 4 km of 150mm pipeline that will be constructed.<br />

.<br />

General NRW Reduction activities<br />

D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />

35 | P a g e


An active leak detection campaign and repair of identified leaks will be undertaken.<br />

There will also be the establishment of appropriate flow/pressure zones and installation<br />

of gate valves, check valves, flow control valves, pressure sustaining valves, control<br />

mate, air valves throughout distribution<br />

Pipeline Replacement<br />

It is planned to replace about 1 km of the leaking 4 inch diameter galvanized iron<br />

pipeline from the New Milns Pump Station with 150 mm of PVC. In addition, provision<br />

has been made to replace other sections of the water supply network..<br />

Low Income Farming Settlement Environmental Improvement (0.008B)<br />

Reduction Water consumed or wasted at low income settlements to reduce the high NRW ratio<br />

D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />

36 | P a g e


6.3.1 Cost for Improvements<br />

The estimated total cost for the improvement works is $106.8M as shown below<br />

Activity Qnty Cost ($)<br />

Rehabiliation of water storage tank 10,000,000<br />

Install 4 km of 150 mm pipeline from Black Gate to<br />

the Welcome tank 4,000 38,980,000<br />

General NRW Reduction Activities 10,000,000<br />

Replace GI pipeline from New Milns pump station<br />

with 100mm PVC 1,000 10,005,000<br />

Provision for replacement of distribution network 2,000 20,010,000<br />

Sub-Total 88,995,000<br />

Engineering & Other Cost 17,799,000<br />

TOTAL<br />

106,794,000<br />

37 | P a g e<br />

D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1


6.4 Shettlewood Demand Zone (H-1)<br />

6.4.1 System Description<br />

The Shettlewood Water Supply System provides just under 80,000 gallons of water per<br />

day.<br />

6.4.2 Service Area<br />

The communities that are now served by the Shettlewood Water Supply System include:<br />

Chester Castle, Ramble, Knockalva, Copse, Pearces Village, Shettlewood, Friendship,<br />

Lethe, Eden, Burnt Ground, Ramble, Mt. Peto, Bessie Baker, Forrest, Mount Peto and<br />

Haddo<br />

6.4.3 Water Requirement<br />

The current population in the DC in Hanover that is served by the Shettlewood system<br />

is estimated to be 14,096 persons and this is expected to increase to 16, 862 persons by<br />

2030. There is an existing supply deficit of 0.92 mgd and it is projected that this will<br />

increase to 1.1 mgd by 2030 if the supply conditions remain as they are today .<br />

6.4.4 Addressing the Supply Deficiencies<br />

The raw water inlet valves are in very poor condition and will be replaced.<br />

Sections on the distribution experience excessively high pressures causing frequent<br />

main breaks and leaks.<br />

Treatment Plant and Intake Works Rehabilitation (0.07B)<br />

• Redesign and rehabilitation of Intake Works<br />

• Rehabilitation of Treatment Plant and to maximise production capacity<br />

• Supply of Spare parts and materials to sustain production efficiency capacity and Preventative<br />

maintenance<br />

Rehabilitation and Installation of Reservoir (0.09B)<br />

• Rehabilitation of Friendship Tank storage capacity<br />

• Installation of New Tank at Chester Castle, Copse and Macfield<br />

38 | P a g e<br />

D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1


Water Supply Enhancement (0.16B)<br />

• Lay 6 km new 150mm transmission pipe from Shettlewood to Mt Carey pumping Station, expansion of<br />

storage capacity and pumping station upgrade.<br />

General NRW Activities<br />

o Creation of new flow/pressure zones and installation of gate valves, check valves, flow control<br />

valves, pressure sustaining valves, control mate, air valves throughout distribution<br />

o Detailed micro DMA investigation (technical/commercial)<br />

o Reconfigure sections of the distribution system<br />

o Controls for all pumps within the distribution with pressure switch, timer, surge vessel to reduce<br />

energy and water loss<br />

o House to house service connection investigation, replacement, repairing leaks on service<br />

connection and Consumer to Customer conversion<br />

Rehabilitation and Reinforcement of Small, Medium and Large Diameter Pipe Network<br />

Replacement of 1’’ GI pipeline with 150mm to 100m from Axe and Daze to Chigwell<br />

Low Income Settlement Environmental Improvement (0.01)<br />

• Low Income settlement (Red area) water supply and billing improvement.<br />

• Reduction Water consumed or wasted at low income settlements to reduce the high NRW ratio<br />

• Improve service by giving one connection per property with meter.<br />

• Abatement of Illegal Connections and conversion to active accounts<br />

D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1<br />

39 | P a g e


6.4.1 Cost for Improvements<br />

The estimated total cost for the improvement works is $473.1M as shown below<br />

Activity Qnty Cost ($)<br />

Rehabilitation and upgrade of treatment plant to<br />

increase Production.<br />

120,000,000<br />

Rehabilitation and Installation of Reservoir 90,000,000<br />

Install 6 km new 150mm transmission pipeline<br />

from Shettlewood to Mt Carey pumping Station 6,000<br />

75,240,000<br />

Expansion of storage capacity and pumping<br />

station upgrade. 30,000,000<br />

Provision for replacement of distribution mains in<br />

supply area 4,000 38,980,000<br />

General NRW Activities 40,000,000<br />

Sub-Total 394,220,000<br />

Engineering & Other Cost 78,844,000<br />

40 | P a g e<br />

D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1


TOTAL<br />

473,064,000<br />

41 | P a g e<br />

D r a f t H a n o v e r W S P P L a n – O c t o b e r 1 2 2 0 1 1