21.09.2015 Views

Training Considerations

Small Hydro SCADA Systems

Small Hydro SCADA Systems

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

RTU<br />

• Advantages<br />

• Low initial cost<br />

• Remote monitoring and control (limited)<br />

• Disadvantages<br />

• Higher long-term operating and maintenance costs<br />

• Same as Legacy System, plus new RTU<br />

• Modern Operations<br />

• Same as Legacy System, except for limited remote monitoring<br />

and control.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!