21.09.2015 Views

Training Considerations

Small Hydro SCADA Systems

Small Hydro SCADA Systems

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Summary<br />

• Each stakeholder—owners, engineers,<br />

operators, and maintenance staff—should be<br />

fully engaged during all stages of the design,<br />

construction, and start-up process of a hydro<br />

unit or hydro station automation upgrade.<br />

• Discussion between all stakeholders should<br />

included Design Concepts, Design Approaches,<br />

Implementation Strategies, Security Issues,<br />

and <strong>Training</strong> <strong>Considerations</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!