Training Considerations
Small Hydro SCADA Systems
Small Hydro SCADA Systems
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Summary<br />
• Each stakeholder—owners, engineers,<br />
operators, and maintenance staff—should be<br />
fully engaged during all stages of the design,<br />
construction, and start-up process of a hydro<br />
unit or hydro station automation upgrade.<br />
• Discussion between all stakeholders should<br />
included Design Concepts, Design Approaches,<br />
Implementation Strategies, Security Issues,<br />
and <strong>Training</strong> <strong>Considerations</strong>