TENDER DOCUMENT

System No.424 Please view amendment Tender Document is ...

System No.424 Please view amendment Tender Document is ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2.2 The tenderers submitting their offer on form of LUMP SUM CONTRACT shall submit<br />

the drawing of proposed Reservoir with the tender in envelope ‘B’ of technical offer.<br />

They will further be required to submit detailed design, drawings and calculation within<br />

one month of acceptance of their tender for scrutiny and approval by competent<br />

authority. The responsibility for design, construction structural stability and water<br />

tightness will, however, rest solely with the contractor and he shall have to make good,<br />

any damage or loss to the Government due to defect if any, of the above mentioned<br />

work. The contractor shall have to make the tank chlorine resistant as heavy dose of<br />

chlorination is expected to be given in water.<br />

2.3 The offer shall include provision for 1.0 m wide R.C.C. balcony at bottom slab level<br />

railing to balcony and at roof level, lightening arrestor, water level indicator, 1.0 meter<br />

wide RCC stairs from ground level to tank floor with railing and all pipes and fitting<br />

(including puddle collars) up to duck foot bends and from duck foot bend up to 2.0<br />

meters out side the supporting structures i.e. RCC column including C.I. valves etc.<br />

including their painting and architectural treatment, protection and drainage work and<br />

all as mentioned in Annexure “E” special condition.<br />

3.1 As per trial pit section the safe bearing capacity is 10 T/sqm (approx.) at proposed site<br />

below 2.00 m from G.L.<br />

The contractor should satisfy himself about this test report<br />

as he bears the sole responsibility regarding the structural safety of the structure.<br />

4.0 STEEL :<br />

4.1 The contractor shall have to arrange himself the entire quantity of steel required for<br />

the completion of the work under contract, No steel shall be supplied by the<br />

department.<br />

No extension of time will be granted by the department for non<br />

availability of or non procurement of steel in time or late supply of steel or for any<br />

other reasons what-so-ever.<br />

4.2 The steel for reinforcement shall conform to IS 432-1966 or IS 1139-1966 amended<br />

up to date and a test certificate shall be required to be furnished to the department in<br />

support thereof. The stresses in steel for design purposes should be taken as<br />

specified in IS Code 3370 (Part-II) 1965 amended up to date.<br />

4.3 In additions, the contractor shall be required to get tested the random samples of the<br />

Steel brought at site to see whether they conform to relevant I.S. specifications. The<br />

cost of such tests shall be borne by the contractor.<br />

5.0 The contractor shall have to make his own arrangement for requirement of electric<br />

power and telephone connections for construction work, if they desire these facilities.<br />

The department shall provide assistance by way of recommendation only.<br />

6.0 For blasting operation, if required in foundation, excavation, the contractor will make<br />

his own arrangement for license, permits and blasting materials from competent<br />

authority.<br />

E:\Tanki\Baghera_30.sxw - 42 -