2.2 The tenderers submitting their offer on form of LUMP SUM CONTRACT shall submit<br />
the drawing of proposed Reservoir with the tender in envelope ‘B’ of technical offer.<br />
They will further be required to submit detailed design, drawings and calculation within<br />
one month of acceptance of their tender for scrutiny and approval by competent<br />
authority. The responsibility for design, construction structural stability and water<br />
tightness will, however, rest solely with the contractor and he shall have to make good,<br />
any damage or loss to the Government due to defect if any, of the above mentioned<br />
work. The contractor shall have to make the tank chlorine resistant as heavy dose of<br />
chlorination is expected to be given in water.<br />
2.3 The offer shall include provision for 1.0 m wide R.C.C. balcony at bottom slab level<br />
railing to balcony and at roof level, lightening arrestor, water level indicator, 1.0 meter<br />
wide RCC stairs from ground level to tank floor with railing and all pipes and fitting<br />
(including puddle collars) up to duck foot bends and from duck foot bend up to 2.0<br />
meters out side the supporting structures i.e. RCC column including C.I. valves etc.<br />
including their painting and architectural treatment, protection and drainage work and<br />
all as mentioned in Annexure “E” special condition.<br />
3.1 As per trial pit section the safe bearing capacity is 10 T/sqm (approx.) at proposed site<br />
below 2.00 m from G.L.<br />
The contractor should satisfy himself about this test report<br />
as he bears the sole responsibility regarding the structural safety of the structure.<br />
4.0 STEEL :<br />
4.1 The contractor shall have to arrange himself the entire quantity of steel required for<br />
the completion of the work under contract, No steel shall be supplied by the<br />
department.<br />
No extension of time will be granted by the department for non<br />
availability of or non procurement of steel in time or late supply of steel or for any<br />
other reasons what-so-ever.<br />
4.2 The steel for reinforcement shall conform to IS 432-1966 or IS 1139-1966 amended<br />
up to date and a test certificate shall be required to be furnished to the department in<br />
support thereof. The stresses in steel for design purposes should be taken as<br />
specified in IS Code 3370 (Part-II) 1965 amended up to date.<br />
4.3 In additions, the contractor shall be required to get tested the random samples of the<br />
Steel brought at site to see whether they conform to relevant I.S. specifications. The<br />
cost of such tests shall be borne by the contractor.<br />
5.0 The contractor shall have to make his own arrangement for requirement of electric<br />
power and telephone connections for construction work, if they desire these facilities.<br />
The department shall provide assistance by way of recommendation only.<br />
6.0 For blasting operation, if required in foundation, excavation, the contractor will make<br />
his own arrangement for license, permits and blasting materials from competent<br />
authority.<br />