Statutory Services Provided by STPI
Verification
Verification
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Statutory</strong> <strong>Services</strong> <strong>Provided</strong> <strong>by</strong> <strong>STPI</strong>
<strong>Statutory</strong> <strong>Services</strong> <strong>Provided</strong> <strong>by</strong> <strong>STPI</strong><br />
Approvals / Certification /NOC /Permission<br />
1. Letter of STP Registration Approval.<br />
2. Post Registration process<br />
1. Legal Undertaking<br />
2. Green Card<br />
3. Attestation of Floor Plan<br />
4. Endorsement of Capital Goods<br />
5. NOC for CPBW license<br />
3. Renewal of Green Card<br />
4. Import Certificate.<br />
5. Excise Exemption Certificate<br />
6. SOFTEX FORM Certification<br />
7. FORM B Certification for Onsite<br />
8. Change of Company Name<br />
9. Change of Location
<strong>Statutory</strong> <strong>Services</strong> <strong>Provided</strong> <strong>by</strong> <strong>STPI</strong><br />
10. Expansion of Unit<br />
11. De-bonding of Area<br />
12. De-bonding of Capital Equipment<br />
13. Re-export of Capital Equipment<br />
14. Transfer of Capital Goods<br />
15. Enhancement of Capital Goods<br />
16. DTA Sales Permission<br />
17. CST Reimbursement<br />
18. Renewal of CPBW license<br />
19. Shifting of Capital Goods<br />
20. Donation of Capital Goods<br />
21. Sub-contracting permission<br />
22. Merger Acquisition / amalgamation<br />
23. Renewal of Letter of Permission (LOP)<br />
24. Exit / Cancellation
Documents Required to take <strong>STPI</strong> Registration<br />
Covering Letter.<br />
Application Form in Triplicate. Email address should be mentioned in the Application<br />
For Pvt./Public Ltd Copy of Memorandum and Articles of Association.<br />
For Partnership Firm, Copy of Partnership Deed<br />
Board Resolution Copy<br />
PAN No. Copy<br />
IE Code Copy<br />
Banker Certificate<br />
RBI Permission in case of Foreign Equity<br />
Form 32 Stating List of Directors & Form 18 for Regd. Office Address<br />
Project Report<br />
Export Order in Hand/Pipeline/MOU<br />
Copy of lease Agreement/Proof of Premises<br />
Details of Director with Residential address, Phone No., Mobile No. Email id.<br />
Application Processing Fees and <strong>Services</strong> Charges for Three Years
Check List for Application form<br />
Application form in triplicate.<br />
Application form is duly filled and initial on all pages and full signature<br />
of the Authorized Signatory and stamp on the last page
Check List for Memorandum and Articles of Association<br />
Computer Software/IT Enable <strong>Services</strong> is included in item of manufacture.<br />
Authorized Share Capital mentioned in MOA is as mentioned in the Application form<br />
List of Directors is as per Copy Submitted with Application form
Check List for Partnership Deed<br />
Name and Signature of Partners in Partnership Deed are as per the<br />
list of Partner submitted with the Application form.
Check List for Board Resolution Copy<br />
Name/Names of Director in as per the List of Directors,Form 32 and MOA<br />
Name of the authorized person mentioned in the Board resolutions copy is same<br />
as per the names in the application form
Check List for PAN No. Copy<br />
Availability of signature and Stamp of Income Tax Department
Check List for IEC Code Copy<br />
Availability of signature and Stamp of DGFT<br />
Availability of PAN No in IEC code Copy
Check List for FORM 32<br />
Names of Directors are as per the MOA<br />
Names of Directors are as per the list of Directors submitted with the Application form
Check List for Banker Certificate<br />
Availability of signature and Stamp of Banker on Bank Certificate<br />
Bank Certificate is on the Letter Head of the Bank with Local Address
Check List for Project Report<br />
Company background<br />
Area of Expertise<br />
Key Personnel<br />
Export Performance for last three years(In case of existing Company)<br />
Export order in hand/pipeline
Check List for Export Order<br />
Contract signed <strong>by</strong> both the parties<br />
Project Description<br />
Payment Details<br />
Validity of Contract
Check List for Proof of Premises<br />
A Leave and License Agreement<br />
Lease Period (Minimum one year)<br />
Area of Premises<br />
Address of Premises is as per the Application<br />
B Sale Deed<br />
Area of Premises<br />
Address of premises is as per the Application
Receipt of<br />
Application<br />
Form<br />
Issue<br />
Approval<br />
Letter<br />
Scrutinize<br />
Enclosures<br />
Y<br />
Inward the<br />
application<br />
form<br />
Process<br />
Application<br />
N<br />
Return the Application for<br />
1 Changes<br />
2 Documents<br />
Flow Chart for Application<br />
Processing<br />
Receipt Acknowledge<br />
In standard format<br />
From STP Unit<br />
Prepare Legal<br />
Undertaking (LUT)<br />
Print<br />
1.Case Sheet<br />
2. Export<br />
Obligation Sheet<br />
Legal Agreement<br />
Is signed <strong>by</strong> STP Unit<br />
& Director<br />
Put up to<br />
Immediate<br />
N<br />
Issue Following Documents to the<br />
STP Unit<br />
superior<br />
Y<br />
Put up to Director<br />
for approval<br />
N<br />
Return to the<br />
EXIM staff for<br />
suitable changes<br />
a. True Copy of LUT (3 Copies)<br />
b. List of Plant and Machinery(3 Copies)<br />
c. Green Card<br />
Y
Verification - Import Certificate Application<br />
v Documents Required<br />
• A request Letter and copy of shipping/Commercial Invoice<br />
v Verification<br />
u In Company File<br />
• Validity of Custom Bonding License Copy<br />
u In Commercial invoice<br />
• Name and Location of STP unit<br />
• Name and address of Supplier and country of origin<br />
• Invoice No. and Date<br />
• Description of goods<br />
• Quantity of Items<br />
• Value of Invoice<br />
• New Equipment/Used Equipment<br />
• Incoterms (CIF or FOB)<br />
• Type of Import: (Purchase/Loan/FOC/Lease/High Seas Sales/ Bond to Bond<br />
• Signed and Stamp on Shipping/Commercial Invoice Contd ….
Verification - Import Certificate Application<br />
v Type of Import i.e. Purchase/Loan/FOC/Lease/High Seas Sales / Bond to<br />
Bond<br />
v<br />
v<br />
v<br />
If Equipment is to be imported on Loan basis, the Invoice should clearly<br />
state that “ Material are sent on Loan Basis for Project purpose for a<br />
period of _____” and “The value is for customs Purpose only”(If the<br />
Importation is on loan basis, the maximum period of Loan is 24 Month)<br />
If the equipment is imported on Free of Charges(FOC), the invoice<br />
should clearly state the “Material are sent on Free of Charges Basis” and<br />
“The value is for Customs purpose only”<br />
If the equipment is coming on High Seas Sales basis, a copy of valid<br />
High Seas Sales agreement needs to be submitted.<br />
Continue…
Verification - Import Certificate Application<br />
v In Case of import of Second Hand Capital Goods check the<br />
following<br />
v<br />
v<br />
If second hand capital goods to be imported is less than seven years old,<br />
a self declaration has to be accompanied with the request of import<br />
Certificate.<br />
In case Bond to Bond transfer the invoice should indicate that the term<br />
transfer is Bond to Bond.
Receipt of<br />
Application<br />
Scrutinize<br />
Enclosures<br />
Inward the<br />
application<br />
Process<br />
Application<br />
Print<br />
Y<br />
1.Office Note<br />
2.Import Certificate<br />
N<br />
Return the Application for<br />
1 Changes<br />
2 Documents<br />
Flow Chart for Import<br />
Certificate<br />
Issue Original Import<br />
Certificate to the STP<br />
Unit<br />
File Office Copy with<br />
office Note<br />
Send Xerox Copy of<br />
Import Certificate to<br />
Deputy commissioner of<br />
Customs, (100% EOU)<br />
Put up for<br />
approval<br />
N<br />
Return to the<br />
EXIM staff for<br />
suitable changes<br />
Y
Verification – Excise Exemption Application<br />
v Documents Required<br />
• A request Letter and copy of Proforma Invoice<br />
v Verification<br />
u In Company File<br />
• Validity of Custom Bonding License Copy<br />
u In Proforma invoice<br />
• Name and Location of STP unit<br />
• Name and address of Supplier<br />
• Goods are Falling under which category<br />
• Invoice No. and Date<br />
• Description of goods<br />
• Quantity of Items<br />
• Value of Invoice (in Rupees)<br />
• Rate of Excise Duty<br />
• Signed and Stamp on Proforma Invoice
Receipt of<br />
Application<br />
Scrutinize<br />
Enclosures<br />
Inward the<br />
application<br />
Process<br />
Application<br />
Print<br />
Excise Exemption<br />
Certificate<br />
Y<br />
N<br />
Return the Application for<br />
1 Changes<br />
2 Documents<br />
Flow Chart for Excise<br />
Exemption<br />
Issue Original Copy of<br />
Excise Exemption<br />
Certificate to the STP<br />
Member<br />
File Office Copy<br />
Send Xerox Copy of<br />
Excise Exemption<br />
Certificate to Deputy<br />
commissioner of<br />
Customs, (100% EOU)<br />
Put up for<br />
approval<br />
N<br />
Return to the<br />
EXIM staff for<br />
suitable changes<br />
Y
u Documents Required<br />
• Softex forms in Triplicate<br />
• Contract Copy/Agreement/ Purchase Order<br />
• Invoices in Triplicate<br />
• Datacom Connectivity Copy<br />
Verification - Softex Forms Certification<br />
• Verification<br />
A Softex form B(1) Contract / Agreement<br />
• Import Export Code (IEC) Name and Address of STP Unit & Foreign Client<br />
• Address of STP Location Signature of both parties with Date of Contract<br />
• Client Name and Address Description of the project<br />
• Authorized Dealer Name, Address and Code No. Validity Period & Payment Terms<br />
Royalty and Discount terms<br />
B(2) Purchase Order C Invoice<br />
• Name and Address of STP Unit & Foreign Client Invoice Value with Contract Value<br />
• Signature of both parties with Date of Contract Description of Item as per the contract<br />
• Description of the project Date of Invoice with respect to validity of Contract<br />
• Validity Period<br />
• Payment Terms D Data Communication<br />
• Royalty and Discount terms Name & Location of STP Unit as per records
Receipt of<br />
Softex Form<br />
Scrutinize<br />
Enclosures<br />
Inward the<br />
Softex Form<br />
Process of<br />
Softex Form<br />
Allot RBI<br />
Number to<br />
Softex Form<br />
Put up for<br />
approval<br />
Y<br />
N<br />
N<br />
Return the Application for<br />
1 Changes<br />
2 Documents<br />
Return to the<br />
EXIM staff for<br />
suitable changes<br />
Flow Chart for Softex Processing<br />
Prepare Covering<br />
Letter in Triplicate<br />
Prepare 3 Sets of Softex<br />
Forms<br />
Issue<br />
(1) Duplicate Copy to STP<br />
Unit<br />
(2) Original Copy to RBI<br />
(3)Triplicate in company File<br />
Y
Verification–Form ‘A’ Certification Verification - FORM ‘B’ Certification<br />
u Documents Required Documents Required<br />
• Form A Form B in Duplicate<br />
Form A in one Copy<br />
Verification<br />
Form ‘A’ duly filled in Format<br />
FIRC copy<br />
Contract Copy/Agreement/ Purchase Order<br />
Verification<br />
A<br />
Contract<br />
Name and Address of STP Member and Foreign Client<br />
Signature of both the parties and Date of Contract<br />
Description of the project<br />
Validity Period<br />
Payment Terms<br />
Royalty and Discount terms<br />
B FORM B<br />
FIRC No and Date with Form B<br />
Letter Stating onsite Personnel are on the payroll of STP unit<br />
Address of STP Location<br />
Client Name and Address<br />
Value as per the Contract
Receipt of<br />
Form B<br />
Scrutinize<br />
Enclosures<br />
Inward the<br />
FORM B<br />
Process of<br />
Form B<br />
Put up<br />
Y<br />
for approval<br />
N<br />
N<br />
Return the Application for<br />
1 Changes<br />
2 Documents<br />
Return to the<br />
EXIM staff for<br />
suitable changes<br />
Flow Chart for Form B Processing<br />
Prepare Covering<br />
Letter in Duplicate<br />
Prepare 2 Sets of Form B<br />
Issue<br />
(1)One Copy to STP Unit<br />
(2)Maintain One Copy to File<br />
Y
Verification – Change of Company Name<br />
u Documents Required<br />
• A request Letter accompanied with original green card (if Green<br />
Card issued)<br />
• Copy of ROC<br />
u Verification<br />
• Custom Bonding License Copy<br />
• New Name of the Company with respect to<br />
Registrar of Companies (ROC)
Receipt of<br />
Application<br />
Scrutinize<br />
Enclosures<br />
Inward the<br />
application<br />
Process<br />
Application<br />
Print<br />
Y<br />
2.NOC for Change of<br />
Company Name<br />
N<br />
Return the Application for<br />
1 Changes<br />
2 Documents<br />
Flow Chart for Change of<br />
Company Name<br />
Issue Original Copy of<br />
Change of Company<br />
Name to the STP Unit<br />
File Office Copy<br />
Send Xerox Copy of<br />
Change of Company<br />
Name to Deputy<br />
commissioner of<br />
Customs, (100% EOU)<br />
Return to the<br />
EXIM staff for<br />
suitable changes<br />
Put up<br />
for approval<br />
Y<br />
N
Verification – Change of Location<br />
u Documents Required<br />
• A request Letter<br />
• original green card<br />
• Copy of Lease Agreement / Sale Deed and Ground Plan<br />
u Verification<br />
• Custom Bonding License Copy<br />
• Address of New Location is as per the Lease Agreement /<br />
Sale Deed<br />
• Period of Lease Agreement
Receipt of<br />
Application<br />
Scrutinize<br />
Enclosures<br />
Inward the<br />
application<br />
Process<br />
Application<br />
Print<br />
2.NOC for Change of<br />
Location<br />
Y<br />
N<br />
Return the Application for<br />
1 Changes<br />
2 Documents<br />
Flow Chart for Change of<br />
Location<br />
Issue Original Copy of<br />
Change of Location &<br />
attested Floor plan to<br />
the STP unit<br />
File Office Copy<br />
Send Xerox Copy of<br />
Change of Change of<br />
Location to Deputy<br />
commissioner of<br />
Customs, (100% EOU)<br />
Return to the<br />
EXIM staff for<br />
suitable changes<br />
Put up<br />
for approval<br />
N<br />
Y
Verification – Expansion of STP unit<br />
u Documents Required<br />
• A request Letter accompanied with original green card<br />
• Copy of Lease Agreement / Sale Deed and Ground Plan<br />
u Verification<br />
• Validity of Custom Bonding License Copy<br />
• Address of Expanded Area is as per the Lease Agreement /<br />
Sale Deed<br />
• Period of Lease Agreement
Receipt of<br />
Application<br />
Scrutinize<br />
Enclosures<br />
Y<br />
Inward the<br />
application<br />
Process<br />
Application<br />
N<br />
Return the Application for<br />
1 Changes<br />
2 Documents<br />
Flow Chart for<br />
Expansion of STP Unit<br />
Issue Original Copy of<br />
Expansion of STP<br />
Unit and amended<br />
Green card to the STP<br />
Member<br />
File Office Copy<br />
Send Xerox Copy of<br />
Expansion of STP unit<br />
to Deputy commissioner<br />
of Customs, (100%<br />
EOU)<br />
Print<br />
2.NOC for Expansion<br />
of STP Unit<br />
Return to the<br />
EXIM staff for<br />
suitable changes<br />
Put up<br />
for approval<br />
Y<br />
N
Verification – De-bonding of Capital Goods and Area<br />
v For Capital Goods<br />
u Documents Required<br />
• A request Letter<br />
• Import Certificate Copy for Imported goods<br />
• Excise Exemption Copy for Indigenous goods<br />
• Copy of Bill of Entry<br />
u Verification<br />
• Signature and Stamp of the Authorized Person<br />
• Fulfillment of Export Obligation (E.O.)<br />
v For Premises<br />
u Documents Required<br />
• A request Letter<br />
u Verification<br />
• Validity of Bonding License<br />
• Fulfillment of Export Obligation
Receipt of<br />
Application<br />
Scrutinize<br />
Enclosures<br />
Inward the<br />
application<br />
Process NOC for<br />
De-bonding of<br />
Capital Goods<br />
Print<br />
Y<br />
NOC for De-bonding of<br />
Capital Goods<br />
N<br />
Return the Application for<br />
1 Changes<br />
2 Documents<br />
Flow Chart for De-bonding<br />
of Capital Goods<br />
Issue Original Copy of<br />
De-bonding of CG to<br />
the STP unit<br />
File Office Copy<br />
Send Xerox Copy of Debonding<br />
of CG to<br />
Deputy commissioner of<br />
Customs, (100% EOU)<br />
Return to the<br />
EXIM staff for<br />
suitable changes<br />
Put up<br />
for approval<br />
Y<br />
N
Receipt of<br />
Application<br />
Scrutinize<br />
Enclosures<br />
Y<br />
Inward the<br />
application<br />
Process NOC for<br />
Partial Debonding<br />
of Unit<br />
N<br />
Return the Application for<br />
1 Changes<br />
2 Documents<br />
Flow Chart for Partial<br />
De-bonding of Unit<br />
Issue Original Copy of<br />
Partial De-bonding of<br />
Unit to the STP unit<br />
File Office Copy<br />
Send Xerox Copy of<br />
Partial De-bonding of<br />
Unit to Deputy<br />
commissioner of<br />
Customs, (100% EOU)<br />
Print<br />
NOC for Partial<br />
De-bonding of Unit<br />
Return to the<br />
EXIM staff for<br />
suitable changes<br />
Put up<br />
for approval<br />
Y<br />
N
Verification - Re-export of Capital Goods<br />
u Documents Required<br />
• A request Letter<br />
• Re-export Invoice in three copies<br />
• Copy of Import Certificate and attested invoice<br />
• Bill of Entry<br />
• NOC from original supplier<br />
u Verification<br />
• Validity of Custom Bonding License Copy<br />
• Reason for Re-export<br />
• Name and Location of STP unit<br />
• Name and Location of Foreign Supplier/Client where the capital goods is to be<br />
Re-exported.<br />
• Signature and Company Stamp on shifting Invoice<br />
• Description of Item,Value and Qty with respect to original Import
Receipt of<br />
Application<br />
Scrutinize<br />
Enclosures<br />
Inward the<br />
application<br />
Process NOC<br />
For Re-export<br />
of CG<br />
Print<br />
Y<br />
1.Office Note<br />
N<br />
2.NOC for Re-export of CG<br />
Return the Application for<br />
1 Changes<br />
2 Documents<br />
Flow Chart for Re-Export<br />
of Capital Goods<br />
Issue Original Copy of<br />
Re-export of CG to<br />
the STP Unit<br />
File Office Copy with<br />
office Note<br />
Send Xerox Copy of Reexport<br />
of CG to Deputy<br />
commissioner of<br />
Customs, (100% EOU)<br />
Return to the<br />
EXIM staff for<br />
suitable changes<br />
Put up for<br />
approval<br />
N<br />
Y
Verification - Transfer / Shifting of Capital Goods<br />
u Documents Required<br />
• A request Letter<br />
• Shifting Invoice in two copies<br />
• Copy of Import Certificate and attested invoice/Excise Exemption<br />
• Bill of Entry<br />
u Verification<br />
• Name and Location of STP unit<br />
• Name and Location of STP unit/100% EOU where the capital<br />
goods is to be transferred.<br />
• Signature and Company Stamp on shifting Invoice
Receipt of<br />
Application<br />
Scrutinize<br />
Enclosures<br />
Inward the<br />
application<br />
Process NOC<br />
For Transfer/<br />
Shifting of<br />
Capital Goods<br />
Print<br />
Y<br />
1.Office Note<br />
N<br />
2.NOC for Transfer of CG<br />
Return the Application for<br />
1 Changes<br />
2 Documents<br />
Flow Chart for Transfer<br />
of Capital Goods<br />
Issue Original Copy of<br />
Transfer of CG to the<br />
STP Member<br />
File Office Copy with<br />
office Note<br />
Send Xerox Copy of<br />
Transfer of CG to Deputy<br />
commissioner of<br />
Customs, (100% EOU)<br />
Return to the<br />
EXIM staff for<br />
suitable changes<br />
Put up<br />
for approval<br />
Y<br />
N
u Documents Required<br />
• A request Letter<br />
• Past performance report<br />
• Imports Details<br />
• CG Projections<br />
• Additional Export Projections<br />
• Bond Register Copy<br />
u Verification<br />
Verification - CG Enhancement<br />
• Validity of Custom Bonding License<br />
• Export Performance with respect to Softex and Monthly/Quarterly Reports<br />
• Import Details with import Certificate issued and also with Bond Register
Receipt of<br />
Application<br />
Scrutinize<br />
Enclosures<br />
Inward the<br />
application<br />
Process<br />
Permission for<br />
CG<br />
Enhancement<br />
Print<br />
Y<br />
(1) Office Note<br />
N<br />
(2) Permission for CG Enhancement<br />
Return the Application for<br />
1 Changes<br />
2 Documents<br />
Flow Chart for CG<br />
Enhancement<br />
Issue Original Copy of<br />
CG Enhancement<br />
Permission to the STP<br />
Member<br />
File Office Copy with<br />
office Note<br />
Send Xerox Copy of CG<br />
Enhancement<br />
permission copy to<br />
Deputy commissioner of<br />
Customs, (100% EOU)<br />
Return to the<br />
EXIM staff for<br />
suitable changes<br />
Put up<br />
for approval<br />
Y<br />
N
u Documents Required<br />
• Application in prescribed format<br />
• Contract Copy/Purchase Order<br />
• Copy of FIRC / Banker Certificate<br />
u Verification<br />
Verification - DTA Sales Permission<br />
• Name and Location of STP unit<br />
• Validity of Custom Bonding License<br />
• Name and Address of Customer<br />
• The unit has achieved positive NFE<br />
• Classification of Item is as per the Approval Letter<br />
• Signature and Stamp on the Contract Copy/Purchase Order<br />
• Value of sales is within the entitlement limit<br />
• Validity of DTA sales is as per the Year of Export permissible
Receipt of<br />
Application<br />
Scrutinize<br />
Enclosures<br />
Y<br />
Inward the<br />
application<br />
Process<br />
Permission for<br />
DTA sales<br />
N<br />
Return the Application for<br />
1 Changes<br />
2 Documents<br />
Issue Original Copy of<br />
DTA Sales<br />
Permission to the<br />
STP unit<br />
File Office Copy<br />
Flow Chart for DTA Sales<br />
Print<br />
(1) Office Note<br />
(2) Permission for DTA Sales<br />
Return to the<br />
EXIM staff for<br />
suitable changes<br />
Put up<br />
for approval<br />
N<br />
Y
Documents Required for Renewal of CPBW License NOC<br />
1 A request letter for permission<br />
2 Lease Deed/ Sale Deed of the Premises<br />
3<br />
4<br />
5<br />
Floor Plan of the Premises(3Copies with sign & stamp)<br />
Copy of CPBW License in case of Renewal<br />
NOC from Land Lord (Stating that there is no objection for Custom Bonding)<br />
VERIFICATION<br />
1<br />
2<br />
3<br />
4<br />
5<br />
Is this for obtaining Initial / First Bonded warehouse License verified as per<br />
Data Base?<br />
(i)Unit Address as per LOP and Lease Deed is matching?<br />
(ii)Validity of Lease Deed<br />
(iii)Total Area of the Premises<br />
Is Floor plan is ear marked and attested <strong>by</strong> authorized person?<br />
Validity of Existing Customs Bonding License, If any?<br />
Is the unit regularly submitting the Annual / Quarterly/ Monthly Performance<br />
Reports Verified as per Data Base?
Receipt of<br />
application<br />
Return to Company for<br />
completion of the<br />
application / enclosures<br />
NO<br />
Scrutiny of<br />
documents<br />
&<br />
enclosures<br />
YES<br />
Flow Chart for<br />
Flow Chart for Renewal of<br />
CPBW License NOC<br />
Inward the<br />
application<br />
Process the application<br />
Inline with check List &<br />
Enter details into database<br />
Return back to<br />
EXIM staff<br />
for changes<br />
Print<br />
No Objection Letter for<br />
Customs Bonding<br />
&<br />
Office Copy<br />
YES<br />
NO<br />
Verification<br />
<strong>by</strong> Group<br />
heads<br />
NO<br />
YES<br />
Permission<br />
<strong>by</strong> Authorised<br />
Signatory<br />
YES<br />
1.Issue NOC for Bonding the<br />
Premises.<br />
2. Filing of office copy in respective<br />
Unit file<br />
3. Copy to the Asst. Comm. of<br />
Customs Dept.
Documents Required for Renewal of Green Card<br />
1<br />
A request letter for permission<br />
2<br />
3<br />
Application in prescribed format duly signed <strong>by</strong> Authorized Signatory<br />
Original Green Card required if applied for Renewal<br />
4<br />
Copy of CPBW License<br />
VERIFICATION<br />
1<br />
2<br />
3<br />
Application is duly filled or not<br />
Validity of Customs Bonding License<br />
Is the unit regularly submitting the Annual / Quarterly/ Monthly Performance<br />
Reports Verified as per Data Base?
Receipt of<br />
application<br />
Return to Company for<br />
completion of the<br />
application / enclosures<br />
NO<br />
Scrutiny of<br />
documents<br />
&<br />
enclosures<br />
Inward the<br />
application<br />
YES<br />
Flow Chart for<br />
Flow Chart for Renewal of<br />
Green Card<br />
Process the application<br />
Inline with check List &<br />
Enter details into database<br />
Return back to<br />
EXIM staff<br />
for changes<br />
Print<br />
Office Note, Covering<br />
Letter and Write Details<br />
and Validity period on<br />
Green Card<br />
NO<br />
Verification<br />
<strong>by</strong> Group<br />
heads<br />
NO<br />
YES<br />
Permission<br />
<strong>by</strong> Authorised<br />
Signatory<br />
YES<br />
1. Issue Green Card and Covering<br />
Letter to Unit.<br />
2. Filing of office copy in respective<br />
Unit file
DOCUMENTS REQUIRED Inter Unit Transfer For Consignor / Consignee<br />
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
Application in prescribed format in case of Consignee (Import Application format)/ A<br />
Request letter with details of Equipment and both the Addresses in case of Consignor<br />
Copy of Shifting invoices in Triplicate<br />
[More than one invoice copy annexure should be attached.]<br />
[Both the Addresses and CPBW License No’s & Validity should be mentioned]<br />
Copy of Import Certificate in case of Imported Goods.<br />
Copy of the BOE’s in case of Imported Goods / Copy of CT-3 Forms in case of Indigenous<br />
goods<br />
Permission letter from other STP / EOUs / SEZ in case of Consignor<br />
Whether it is Permanent / Temporary Transfer (Please indicate)<br />
VERIFICATION<br />
1<br />
2<br />
3<br />
4<br />
5<br />
Validity of Customs Bonding License of both consignee & consignor verified as mentioned<br />
in Shifting Invoice<br />
Is Shipping Address mentioned correctly in the Shifting Invoice<br />
Checking the All IC, BOE / CT-3, ARE-3 forms & Value of Capital Goods as per the<br />
Shifting Invoice / Annexure Enclosed<br />
Transferred Permanently / Temporarily<br />
Is the unit regularly submitting the Annual / Quarterly/ Monthly Performance Reports<br />
Verified as per Data Base?
Receipt of<br />
application<br />
FLOW CHART<br />
Return to Company for<br />
completion of the<br />
application / enclosures<br />
NO<br />
Scrutiny of<br />
documents<br />
&<br />
enclosures<br />
Inward the<br />
application<br />
YES<br />
Flow Chart for IUT for<br />
Consignor / Consignee<br />
Process the application<br />
Inline with check List &<br />
Enter details into database<br />
Return back to<br />
EXIM staff<br />
for changes<br />
Print<br />
Office Note<br />
Permission Letter –<br />
enclosed List of CG to<br />
Attested<br />
YES<br />
NO<br />
Verification<br />
<strong>by</strong> Group<br />
heads<br />
NO<br />
YES<br />
Permission<br />
<strong>by</strong> Authorised<br />
Signatory<br />
YES<br />
1. Issue of Permission Letter to unit<br />
along with CG List attested.<br />
2. Filing of office copy along with<br />
CG List in respective Inter Unit<br />
Transfer Documents file.<br />
3. Copy to the Asst. Comm. of
DOCUMENTS REQUIRED Shifting of Capital Goods From One Bonded to AnotherBonded<br />
Ware House of the Same Unit<br />
1<br />
2<br />
3<br />
4<br />
A request letter for permission<br />
List of Capital Goods to be transferred (duly signed & stamped)<br />
CPBW License Copies of both Bonded warehouses<br />
Copy of the BOE’s and Import Certificate in case of Imported Goods / CT-3<br />
Forms in case of Indigenous goods<br />
5 Reasons for Transfer of Goods<br />
VERIFICATION<br />
1<br />
2<br />
3<br />
Validity of Customs Bonding License for both the Premises Verified as per<br />
Copies Enclosed<br />
Checking the All IC, BOE / CT-3, ARE-3 forms & Value of the Capital Goods<br />
Verified as per the List Enclosed<br />
Is the unit regularly submitting the Annual / Quarterly/ Monthly Performance<br />
Reports Verified as per Data Base?
Receipt of<br />
application<br />
Return to Company for<br />
completion of the<br />
application / enclosures<br />
NO<br />
Scrutiny of<br />
documents<br />
&<br />
enclosures<br />
Inward the<br />
application<br />
YES<br />
Process the application<br />
Inline with check List &<br />
Enter details into database<br />
Flow Chart for Shifting of<br />
CG from one bonded<br />
warehouse to another<br />
bonded warehouse<br />
Return back to<br />
EXIM staff<br />
for changes<br />
Print<br />
Office Note<br />
Permission Letter –<br />
enclosed List of CG to<br />
Attested<br />
YES<br />
NO<br />
Verification<br />
<strong>by</strong> Group<br />
heads<br />
NO<br />
YES<br />
Permission<br />
<strong>by</strong> Authorised<br />
Signatory<br />
YES<br />
1. Issue of Permission Letter to unit<br />
along with CG List attested.<br />
2. Filing of office copy along with<br />
CG<br />
List in respective unit file.<br />
3. Copy to the Asst. Comm. of<br />
Customs Dept.
DOCUMENTS REQUIRED NOC- Repair / Testing And Return of Equipment<br />
1<br />
2<br />
3<br />
4<br />
5<br />
A request letter for permission and reason for Testing / Repair / Return of<br />
equipment<br />
Import Certificate / IUT in case of Imported Goods<br />
Copies of Bill of Entry in case of Imported Goods / CT3 incase of Indigenous<br />
Equipment<br />
NOC from Original Supplier / NOC from Local Dealer<br />
List of Goods Sending for Repair with Details of Equipment Like Import<br />
Certificate No, Date & BOE No, Date & Qty, Value of The Equipment<br />
VERIFICATION<br />
1<br />
2<br />
3<br />
4<br />
Is NOC is obtained <strong>by</strong> unit from Supplier?<br />
Is the equipment under warranty verified as mentioned in request letter or NOC<br />
given <strong>by</strong> Supplier<br />
Is local dealer is as authorized <strong>by</strong> supplier of equipment verified as per NOC<br />
given <strong>by</strong> Supplier<br />
Is Original equipment will be returned to the bonded warehouse or replacement?<br />
5<br />
Is the unit regularly submitting the Annual / Quarterly/ Monthly Performance<br />
Reports Verified as per Data Base?
Receipt of<br />
application<br />
Return to Company for<br />
completion of the<br />
application / enclosures<br />
NO<br />
Scrutiny of<br />
documents<br />
&<br />
enclosures<br />
Inward the<br />
application<br />
YES<br />
Flow Chart for<br />
Flow Chart for NOC- Repair /<br />
Testing And Return of<br />
Equipment<br />
Process the application<br />
Inline with check List &<br />
Enter details into database<br />
Return back to<br />
EXIM staff<br />
for changes<br />
NO<br />
Print<br />
No Objection<br />
Certificate for<br />
Movement of Equip.-<br />
& Office Copy<br />
Verification<br />
<strong>by</strong> Group<br />
heads<br />
YES<br />
NO<br />
YES<br />
Permission<br />
<strong>by</strong> Authorised<br />
Signatory<br />
YES<br />
1. Issue of NOC to Unit along with<br />
List of Goods attested.<br />
2. Filing of office copy in respective<br />
Repair / Testing Documents file<br />
3. Copy to the Asst. Comm. of<br />
Customs Dept.
DOCUMENTS REQUIRED Donation of Capital Goods<br />
1<br />
A request letter from the Donor requesting for Donation of Capital Goods<br />
2<br />
3<br />
Invoice 3 Copies with all the details of Equipment<br />
Copies of Bill of Entry and Import Certificate in case of Imported Goods / CT-3 in<br />
case of Indigenous Procurement along with Copy of the Supplier’s Invoice<br />
4<br />
Declaration from Donor stating that the donating capital Goods used for more<br />
than 2 years from installation<br />
5 Submission of necessary certificate / documents about Donee<br />
VERIFICATION<br />
1<br />
2<br />
3<br />
4<br />
Submission of Necessary certificates from donee on above<br />
Capital Goods are utilized for 2 years <strong>by</strong> the unit<br />
Checking the All IC, BOE / CT-3, ARE-3 forms & Value of Capital Goods as per<br />
the Invoice / Annexure Enclosed<br />
Is the unit regularly submitting the Annual / Quarterly/ Monthly Performance<br />
Reports Verified as per Data Base?
Thank You...<br />
Next