07.12.2012 Views

Jade DSC: Site Readiness Instructions - Perkin Elmer Life and ...

Jade DSC: Site Readiness Instructions - Perkin Elmer Life and ...

Jade DSC: Site Readiness Instructions - Perkin Elmer Life and ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Rev. 2<br />

4<br />

Cryofill: LN2 cooling system requires 50 liters of liquid nitrogen to operate. It is the<br />

customer responsibility to make the LN2 available at the installation site of the <strong>Jade</strong> <strong>DSC</strong>.<br />

LN2 consumption is approximately 2.5 liters/hour <strong>and</strong> dependent on temperature range.<br />

NOTE: when h<strong>and</strong>ling LN2 wear appropriate safety gear as specified by your<br />

corporate safety officer or LN2 supplier<br />

f) Environmental Requirements:<br />

Laboratory Environment<br />

Temperature range 15 to 40°C<br />

Humidity

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!