4. Fold the bottom flap down over the sheathing. Fold<br />

the end flaps against the sheathing (Fig 13.4).<br />

5. Repeat Step 3 for the jambs by coating the jambs with<br />

WeatherSeal and installing a piece of Sheathing joint<br />

tape to the jamb and wrapped at least 2 in. (51mm)<br />

onto the sheathing such that it laps the sill piece and<br />

continues up past the head opening at least 4 in.<br />

(102mm) (Fig 13.4).<br />

EMBED IN PAREX USA<br />

SHEATHING JOINT TAPE IN<br />

PAREX USA WATER-RESISTIVE<br />

& AIR BARRIER COATING<br />

Fig. 13.4 ______________________________________________<br />

PAREX USA SHEATHING JOINT TAPE<br />

PAREX USA<br />

WATER-RESISTIVE<br />

& AIR BARRIER<br />

COATING<br />

Weatherproof the Sheathing Joints and Corners:<br />

Apply WeatherSeal in minimum 5 in. (127mm) wide bands<br />

centered over sheathing joints and immediately center<br />

and embed Parex USA 396 Sheathing Tape into the wet<br />

WeatherSeal. A 4 or 6 in. (10 or 15mm) wide drywall knife<br />

works very well to adhere the 396 Sheathing Joint Tape to<br />

the wet WeatherSeal. All inside and outside corners shall be<br />

sealed in the same manner. (Fig 13.5).<br />

Parex USA Flashing Membrane may also be used for<br />

protection of the rough openings. Primer may be required on<br />

certain substrates.<br />

More complete details for installing Parex USA WeatherSeal<br />

can be found at parex.com, teifs.com, elrey.com and<br />

lahabrastucco.com.<br />

Fig. 13.5 ______________________________________________<br />

23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!