08.01.2016 Views

+

1VOUUCp

1VOUUCp

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

26<br />

- If in harbour where an NCAGS Authority is present: in these<br />

circumstances the NCAGS Authority will send an NCAGS Liaison<br />

Officer to collect information about your ship and its intended passage<br />

(Format BRAVO: see below).<br />

• This information is to enable the Naval Control of Shipping Authorities to<br />

plot your vessel’s passage through the NCAGS and thus be in a position<br />

to provide advice and/or direction if this should prove necessary. Such<br />

advice would be sent either directly to your ship or via a general message<br />

(see Para 7 below).<br />

• Unless instructions to the contrary are received from the Naval Control of<br />

Shipping Authority (see Para 8 below), masters are then free to continue<br />

on their normal passage along the route they have reported and no<br />

further action is required by them.<br />

6. Changes to Passage Intentions<br />

If, after the details of an intended passage through an NCAGS have been<br />

reported, these details change, the new passage intentions are to be<br />

reported by a Passage Amendment (PASSAM) message (see below).<br />

7. Communications<br />

In addition to reporting the communication station that you intend to copy<br />

whilst on passage, you may be advised by national authority or by WWNWS<br />

message of additional communication requirements. These may be:<br />

• Communication Reporting Gate (CRG). In order that you may receive upto-date<br />

information on the risk to shipping and instructions concerning<br />

your transit of the NCAGS, you may be requested to report when you have<br />

reached a certain point(s) during your voyage. In these circumstances,<br />

details of the requirement will be contained in the message setting up the<br />

CRG.<br />

• Advisory Communication Listening Watch. In addition, or alternatively, to<br />

the requirements of a CRG, you may be requested to listen to a nominated<br />

Coast Earth Station (CES) or Coast Radio Station (CRS) in order to receive<br />

messages of an immediate or general nature concerning the situation. In<br />

these circumstances, details of the requirement will be communicated to<br />

www.vlaamsehydrografie.be

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!