THE BRATTLE GROUP
pvrbYG
pvrbYG
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Federal Energy Regulatory Commission (FERC) (2015b), Order Accepting [Multi-Driver] Tariff<br />
Revisions Subject to Conditions, PJM Interconnection et al., Docket No. ER14-2864, 150 FERC<br />
61,117, February 20, 2015, online at http://www.ferc.gov/CalendarFiles/20150220174439-<br />
ER14-2864-000.pdf<br />
Frayer, Julia and Eva Wang (2014), Market Resource Alternatives: An Examination of New<br />
Technologies in the Electric Transmission Planning Process, London Economics, prepared for<br />
WIRES, October 2014.<br />
Matyi, Bob (2015), “IN wants more analysis in utility resource plans,” Megawatt Daily, March 24,<br />
2015, pp. 1, 14–15.<br />
Midcontinent ISO (MISO) (2013), MISO Transmission Expansion Plan (MTEP) 2013, Report and<br />
Appendices, online at:<br />
https://www.misoenergy.org/Planning/TransmissionExpansionPlanning/Pages/MTEP13.aspx<br />
Appendix A Status Reports, online at:<br />
https://www.misoenergy.org/Library/Pages/ManagedFileSet.aspx?SetId=1945<br />
Midcontinent ISO (MISO) (2014a), Planning, Interregional Coordination, Southwest Power Pool,<br />
online at<br />
https://www.misoenergy.org/Planning/InterregionalCoordination/Pages/SouthwestPowerPoolIP<br />
SAC.aspx<br />
Midcontinent ISO (MISO) (2014b) HVDC Network Concept, January 7, 2014, online at:<br />
http://www.terrawatts.com/MISO-HVDC-concept.pdf<br />
Midcontinent ISO (MISO) (2014c), “MTEP14 MVP Triennial Review: A 2014 review of the public<br />
policy, economic, and qualitative benefits of the Multi-Value Project Portfolio,” September<br />
2014, online at:<br />
https://www.misoenergy.org/Library/Repository/Study/Candidate%20MVP%20Analysis/MTEP<br />
14%20MVP%20Triennial%20Review%20Report.pdf<br />
MISO and PJM (2014a), Joint MISO-PJM Planning Study, presented at MISO-PJM IPSAC 14th<br />
Meeting, March 17th , 2014. Available at http:/pjm.com/committees-and-groups/stakeholdermeetings/stakeholder-groups/ipsac-midwest.aspx%20<br />
MISO and PJM (2014b), Joint MISO-PJM Planning Study, presented at MISO-PJM IPSAC 15 th<br />
Meeting, May 16, 2014. Available at http://pjm.com/committees-and-groups/stakeholdermeetings/stakeholder-groups/ipsac-midwest.aspx<br />
MISO and PJM (2014c), MISO-PJM JOA Metric and Process Review, presented at WebEx Kickoff,<br />
September 11, 2014. Available at http://pjm.com/committees-and-groups/stakeholdermeetings/stakeholder-groups/ipsac-midwest.aspx<br />
45 | brattle.com