Refloating of EX-USS SHADWELL<br />

By: LCDR Eric Brege<br />

Initial Discovery of EX-SHADWELL<br />

When they returned to work following<br />

the 4th of July weekend,<br />

the crew of the EX USS-SHADWELL<br />

were surprised to see her resting on the<br />

bottom of Mobile Bay, flooded to the<br />

waterline aft of Frame 36, and listing 8<br />

degrees to STBD. After discovering the<br />

incident, the Naval Research Lab (NRL)<br />

immediately notified SUPSALV to begin<br />

recovery efforts. Within hours of notification,<br />

SUPSALV’s East Coast Salvage<br />

contractor, along with CDR Chris Addington,<br />

a salvage officer from SUPSHIP<br />

Gulf Coast, provided the initial response.<br />

Similar to most salvage operations,<br />

the symbiotic relationship between pollution<br />

control and salvage response existed<br />

for the EX-SHADWELL. When<br />

they arrived on station, initial responders<br />

were greeted with an unknown quantity<br />

of burnt diesel fuel which had been used<br />

for previous firefighting testing operations.<br />

In order to contain the fuel that<br />

was dispersed throughout the well deck,<br />

contractors deployed boom around the<br />

ship, and absorbent pads throughout the<br />

spill area. Drum skimmers were also<br />

installed to recover the diesel fuel. The<br />

recovered fuel was then pumped directly<br />

to a bunker barge moored alongside.<br />

As the pollution response phase was<br />

being executed, the salvage plan was finalized<br />

and approved, and additional salvage<br />

equipment and personnel were deployed.<br />

LCDR Eric Brege (SUPSALV)<br />

relieved CDR Addington as Project Manager,<br />

and several truckloads of pumping<br />

equipment were offloaded onto a crane<br />

barge for transit to the EX-SHADWELL.<br />

Executing the second leg of the Salvage<br />

Triad, NRL requested additional salvage<br />

support from MDSU 2 who then<br />

began preparations to deploy Company<br />

2-2. While waiting for the main body<br />

to deploy, LT Sean Doherty and MDV<br />

Eric Eberle from MDSU 2 arrived on<br />

scene as the MDSU advance party.<br />

Prior to commencing the next phase<br />

of the salvage operation, the salvage<br />

plan was briefed to the USCG and other<br />

key stakeholders. The salvage plan was<br />

fairly straightforward and consisted of<br />

isolating leaks, cofferdaming the stern<br />

gate grating, and overcoming leakage<br />

with Salvage pumps. Before the salvage<br />

pumps could be installed, the watertight<br />

integrity of BLKHD 36 was compromised,<br />

and SHADWELL was flooded to<br />

the waterline over the entire length of the<br />

ship. The newly flooded compartments<br />

were sounded, and the POSSE Model<br />

was updated to reflect the most recent<br />

condition prior to commencing the dewatering<br />

operation. Additional salvage<br />

pumps were incorporated into the salvage<br />

plan to ensure dewatering occurred<br />

evenly throughout the length of the entire<br />

ship, and that sagging stress would<br />

be reduced while regaining buoyancy.<br />

As the salvage pumps were being<br />

installed throughout the ship, the MSD-<br />

SU 2-2 advance party began templating<br />

and fabricating the stern gate cofferdam<br />

from sheets of plywood, rubber, and allthread<br />

that were available on station. As<br />

January 2016 21