Jaarverslag 2014
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Subsidiaries<br />
GOw2 Energy Suriname N.V.<br />
On 25 April <strong>2014</strong> the articles of association were<br />
published and the company's official name changed<br />
from Suritex N.V. to GOw2 Energy Suriname N.V.<br />
In May <strong>2014</strong> “Pitstop” Beekhuizen, was opened. This<br />
is the first service station where the full new retail<br />
approach and concept was presented to the customers.<br />
Partly as a result of the new brand and concept the<br />
Beekhuizen service station realized an increase in sales.<br />
In August <strong>2014</strong> the front court of the rebranded station<br />
Gemenelandsweg was opened and this also resulted in<br />
an 14% increase in sales. The rebranding of the front<br />
court of four service stations will be executed in 2015.<br />
In Coronie three appraisal wells were drilled in the<br />
swamp to further investigate an accumulation that<br />
was encountered in the Cretaceous, all these wells<br />
had oil shows. The ESIA for drilling a land exploration<br />
program was also finalized. Further execution depends<br />
on concluding a contract with one or more farm-in<br />
partners. Negotiations are on-going.<br />
In the nearshore Block 4, detailed geological evaluations<br />
including inversion were conducted on the quality<br />
seismic data that was acquired in 2012. Almost 40<br />
prospects and leads were identified, grouped in eleven<br />
playtypes. A contract was negotiated and concluded for<br />
drilling of nine wells, commencing April 2015. Studies<br />
to support planned drilling activities included a full<br />
ESIA and geotechnical and geophysical surveys.<br />
The environmental study, for 18 service stations and the<br />
terminals was completed by the Antea group in <strong>2014</strong>.<br />
The initial results have been reported and Antea Group<br />
is currently working on a remediation plan for sites<br />
where certain risks have been identified.<br />
The remediation plan of all locations is expected to<br />
be completed by April 2015. The rebranding is also<br />
focused on the training of retailers and company staff<br />
to increase their awareness and knowledge of the new<br />
brand. This internal rebranding will continue in 2015.<br />
Based on the approved strategic plan the focus in 2015<br />
will be on further strengthening GOw2's marketing<br />
position.<br />
Paradise Oil Company N.V. (POC)<br />
The first half of <strong>2014</strong> was characterized by operational<br />
activities in almost all of POC's projects and also by<br />
many preparations for the upcoming drilling program<br />
in nearshore Block 4. In the second half of <strong>2014</strong> the<br />
activities in Uitkijk as well as in Coronie were put on<br />
hold in order to fully focus on Block 4.<br />
In the Uitkijk Block five appraisal wells were drilled<br />
to better understand the discovered reservoir and to<br />
investigate a Cretaceous play near the Saramacca fault<br />
system. Producible oil has been revealed in two areas<br />
in this block. For 2015, a number of appraisal wells and<br />
one production test well are planned.<br />
Staatsolie Power Company Suriname N.V. (SPCS)<br />
For SPCS, <strong>2014</strong> can be characterized as a year of<br />
growth. The installed capacity of the plant was more<br />
than doubled, from 28 MW to 62 MW leading to significant<br />
production increase from 198.3 GWh in 2013 to<br />
318.2 GWh in <strong>2014</strong>, a 60% increase. The expansion of<br />
the SPCS power plant was officially put into operation<br />
on 28 February <strong>2014</strong> by the President of the Republic<br />
of Suriname. Limitations in the 33 kV connection to the<br />
Utility grid, allowed a maximum dispatch of 45 MW of<br />
the available 62 MW. This limitation will be removed<br />
with the commissioning of a new 161 kV transmission<br />
facility in March 2015, increasing SPCS’ dispatch<br />
capacity to 150 MW.<br />
In <strong>2014</strong>, the installed steam generation capacity was<br />
also increased from 3 to 8 tons per hour. A further<br />
increase to 16 tons is planned for 2015. The steam<br />
that is generated from hot exhaust gases is sold to the<br />
adjacent Staatsolie Refinery. Finally, in October <strong>2014</strong><br />
a contract was signed to further increase the electrical<br />
capacity of the SPCS Power Plant with 34 MW to be<br />
commissioned by mid-2015.<br />
Ventrin Petroleum Company Limited Trinidad<br />
Ventrin margins were good in the first half of <strong>2014</strong>,<br />
but deteriorated in the second half due to falling oil<br />
prices and in the latter part due to a change in US<br />
Emission Control Areas (ECAs) regulation. This change<br />
22<br />
Staatsolie Annual Report <strong>2014</strong>