Subsidiaries<br />

GOw2 Energy Suriname N.V.<br />

On 25 April <strong>2014</strong> the articles of association were<br />

published and the company's official name changed<br />

from Suritex N.V. to GOw2 Energy Suriname N.V.<br />

In May <strong>2014</strong> “Pitstop” Beekhuizen, was opened. This<br />

is the first service station where the full new retail<br />

approach and concept was presented to the customers.<br />

Partly as a result of the new brand and concept the<br />

Beekhuizen service station realized an increase in sales.<br />

In August <strong>2014</strong> the front court of the rebranded station<br />

Gemenelandsweg was opened and this also resulted in<br />

an 14% increase in sales. The rebranding of the front<br />

court of four service stations will be executed in 2015.<br />

In Coronie three appraisal wells were drilled in the<br />

swamp to further investigate an accumulation that<br />

was encountered in the Cretaceous, all these wells<br />

had oil shows. The ESIA for drilling a land exploration<br />

program was also finalized. Further execution depends<br />

on concluding a contract with one or more farm-in<br />

partners. Negotiations are on-going.<br />

In the nearshore Block 4, detailed geological evaluations<br />

including inversion were conducted on the quality<br />

seismic data that was acquired in 2012. Almost 40<br />

prospects and leads were identified, grouped in eleven<br />

playtypes. A contract was negotiated and concluded for<br />

drilling of nine wells, commencing April 2015. Studies<br />

to support planned drilling activities included a full<br />

ESIA and geotechnical and geophysical surveys.<br />

The environmental study, for 18 service stations and the<br />

terminals was completed by the Antea group in <strong>2014</strong>.<br />

The initial results have been reported and Antea Group<br />

is currently working on a remediation plan for sites<br />

where certain risks have been identified.<br />

The remediation plan of all locations is expected to<br />

be completed by April 2015. The rebranding is also<br />

focused on the training of retailers and company staff<br />

to increase their awareness and knowledge of the new<br />

brand. This internal rebranding will continue in 2015.<br />

Based on the approved strategic plan the focus in 2015<br />

will be on further strengthening GOw2's marketing<br />

position.<br />

Paradise Oil Company N.V. (POC)<br />

The first half of <strong>2014</strong> was characterized by operational<br />

activities in almost all of POC's projects and also by<br />

many preparations for the upcoming drilling program<br />

in nearshore Block 4. In the second half of <strong>2014</strong> the<br />

activities in Uitkijk as well as in Coronie were put on<br />

hold in order to fully focus on Block 4.<br />

In the Uitkijk Block five appraisal wells were drilled<br />

to better understand the discovered reservoir and to<br />

investigate a Cretaceous play near the Saramacca fault<br />

system. Producible oil has been revealed in two areas<br />

in this block. For 2015, a number of appraisal wells and<br />

one production test well are planned.<br />

Staatsolie Power Company Suriname N.V. (SPCS)<br />

For SPCS, <strong>2014</strong> can be characterized as a year of<br />

growth. The installed capacity of the plant was more<br />

than doubled, from 28 MW to 62 MW leading to significant<br />

production increase from 198.3 GWh in 2013 to<br />

318.2 GWh in <strong>2014</strong>, a 60% increase. The expansion of<br />

the SPCS power plant was officially put into operation<br />

on 28 February <strong>2014</strong> by the President of the Republic<br />

of Suriname. Limitations in the 33 kV connection to the<br />

Utility grid, allowed a maximum dispatch of 45 MW of<br />

the available 62 MW. This limitation will be removed<br />

with the commissioning of a new 161 kV transmission<br />

facility in March 2015, increasing SPCS’ dispatch<br />

capacity to 150 MW.<br />

In <strong>2014</strong>, the installed steam generation capacity was<br />

also increased from 3 to 8 tons per hour. A further<br />

increase to 16 tons is planned for 2015. The steam<br />

that is generated from hot exhaust gases is sold to the<br />

adjacent Staatsolie Refinery. Finally, in October <strong>2014</strong><br />

a contract was signed to further increase the electrical<br />

capacity of the SPCS Power Plant with 34 MW to be<br />

commissioned by mid-2015.<br />

Ventrin Petroleum Company Limited Trinidad<br />

Ventrin margins were good in the first half of <strong>2014</strong>,<br />

but deteriorated in the second half due to falling oil<br />

prices and in the latter part due to a change in US<br />

Emission Control Areas (ECAs) regulation. This change<br />

22<br />

Staatsolie Annual Report <strong>2014</strong>