Both of these bank loans are being repaid through 60 monthly installments of principal and interest after the date<br />
of drawdown. In addition, the Company has a working capital financing line of credit facility from First Caribbean<br />
International Bank with a limit of US$ 5 million. Interest is charged on the outstanding balance at current effective<br />
rate of 4.5% per annum. As at December 31, <strong>2014</strong>, borrowings of Ventrin Petroleum Company Limited amounted to<br />
US$ 3,668,200 (2013: US$ 6,322,770).<br />
The above bank facilities are secured by:<br />
1) The transfer and assignment of an existing Registered 1 st Legal Demand Debenture (previously in favour of<br />
RBTT Bank Limited), stamped to cover an additional amount of TT$ 2,700,000, over the following:<br />
‐ Deed of Transfer/Assignment dated 23 October 2002, registered as #DE200202665770D001 between<br />
Scotiabank Trinidad and Tobago Limited and RBTT Bank Limited, over the 1 st Legal Demand Debenture<br />
#DE200102146410D001.<br />
‐ First Legal Demand Debenture in the amount of TT$ 30,939,300 dated 22 August 2001, registered<br />
#DE200102146410D001, over the fixed and floating assets of Ventrin Petroleum Company Limited in favour of<br />
Scotiabank Trinidad and Tobago Limited, presently stamped to cover TT$ 30,939,300.<br />
2) Corporate Parent Guarantee of Staatsolie Maatschappij Suriname N.V. supported by a US$ 7,500,000 Stand‐By Letter<br />
of Credit issued by their bankers, FirstCaribbean Curacao, in favour of FirstCaribbean Trinidad & Tobago to be held<br />
for the duration of the facility.<br />
3) Assignment of Terminal Operators Package Insurance all Risks and Business Interruption Policy #PP1408085 and<br />
Marine Cargo Insurance Policy #MA140 2026 in favour of the bank.<br />
20 Provision for dismantlement and abandonment<br />
Provision for dismantlement and abandonment comprises the following:<br />
<strong>2014</strong> 2013<br />
Production field in <strong>2014</strong>: 1,669 wells (2013: 1,550 wells) 91,941 82,277<br />
Production facilities: Saramacca and pipeline to TLF 8,741 8,036<br />
Refinery and pipeline to Paranam 7,064 6,590<br />
Power plant 1,718 1,109<br />
109,464 98,012<br />
21 Provision for pensions and other postretirement benefits<br />
<strong>2014</strong> 2013<br />
Unfunded accrued pension benefits, insured pension plan 526 580<br />
Unfunded accrued pension benefits, health care plan 12,244 11,982<br />
12,770 12,562<br />