Talk, Listen and Cuddle - Essex County Council
Talk, Listen and Cuddle - Essex County Council
Talk, Listen and Cuddle - Essex County Council
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Pending Minerals <strong>and</strong> Waste Planning Applications as of 15 October 2012<br />
For the latest version check www.essex.gov.uk/Planning, then select Minerals <strong>and</strong> Waste Planning<br />
Team>Planning Applications>The Planning Process>Summary of Applications & the appropriate<br />
district<br />
Area description Application<br />
number<br />
Basildon Borough ESS/22/12/BAS L<strong>and</strong> at<br />
Courtauld Road,<br />
basildon,<br />
Braintree District ESS/14/10/BTE L<strong>and</strong> adjacent to<br />
Cressing Road,<br />
Faulkbourne<br />
Farm, Witham<br />
Braintree District ESS/32/12/BTE Bradwell Quarry,<br />
Coggeshall<br />
Road (A120T),<br />
Bradwell,<br />
Location Application type Validation date Full development<br />
description<br />
Full App with EIA<br />
ESS<br />
Full Planning<br />
Applications ESS<br />
Full Planning<br />
Applications ESS<br />
29/03/2012 Enclosed facility for the<br />
Mechanical <strong>and</strong><br />
Biological Treatment<br />
(MBT) of municipal<br />
solid waste <strong>and</strong><br />
commercial <strong>and</strong><br />
industrial waste,<br />
including waste water<br />
treatment<br />
infrastructure; biofilter<br />
<strong>and</strong> air filtration<br />
infrastructure; a visitor,<br />
education <strong>and</strong> office<br />
facility; parking area;<br />
surface water<br />
management system;<br />
hardst<strong>and</strong>ings; internal<br />
roads; new access <strong>and</strong><br />
junction arrangements<br />
onto Courtauld Road.<br />
29/04/2010 The continuation of<br />
construction of an<br />
agricultural reservoir<br />
without compliance<br />
with condition 6 (Time<br />
Limit of 4 May 2010)<br />
attached to planning<br />
permission reference<br />
ESS/23/09/BTE to<br />
allow a further 12<br />
months for completion<br />
of development <strong>and</strong><br />
restoration of the site<br />
by 04 May 2011.<br />
30/04/2012 Extraction of an<br />
estimated reserve of<br />
900,000 tonnes of s<strong>and</strong><br />
<strong>and</strong> gravel <strong>and</strong><br />
retention of existing<br />
access onto the A120,<br />
private haul road, s<strong>and</strong><br />
<strong>and</strong> gravel processing<br />
4