08.12.2012 Views

Talk, Listen and Cuddle - Essex County Council

Talk, Listen and Cuddle - Essex County Council

Talk, Listen and Cuddle - Essex County Council

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Braintree District ESS/30/12/BTE The Cordons,<br />

Long Green,<br />

Cressing,<br />

Braintree,<br />

CM77 8DL<br />

Braintree District ESS/38/12/BTE Cordons Farm,<br />

Long Green,<br />

Cressing,<br />

Braintree,<br />

CM77 8DL<br />

Braintree District ESS/55/12/BTE Stisted STW,<br />

Water Lane,<br />

Stisted<br />

Braintree District ESS/59/12/BTE Scripps Farm,<br />

Coggeshall,<br />

Braintree<br />

Removal/<br />

Variation of<br />

Condition ESS<br />

Full Planning<br />

Applications ESS<br />

Full Planning<br />

Applications ESS<br />

Full Planning<br />

Applications ESS<br />

plant, ready mixed<br />

concrete plant, bagging<br />

plant, dry silo mortar<br />

plant <strong>and</strong> water<br />

management system,<br />

internal haul roads <strong>and</strong><br />

recontouring of existing<br />

extraction area (known<br />

as Site R in Minerals<br />

Local Plan).<br />

27/04/2012 The continued<br />

development of the site<br />

as a materials recycling<br />

centre <strong>and</strong> the storage<br />

of containers, plant <strong>and</strong><br />

equipment without<br />

compliance with<br />

condition 3 (hours of<br />

operation) <strong>and</strong><br />

condition 4 (number of<br />

vehicle movements)<br />

attached to planning<br />

permission reference<br />

ESS/55/11/BTE.<br />

13/06/2012 Use of the site as an<br />

end of life vehicle depollution<br />

<strong>and</strong> treatment<br />

facility.<br />

05/09/2012 Erection of two GRP<br />

kiosks to house<br />

electrical control<br />

equipment within<br />

Stisted STW.<br />

08/10/2012 Continuation of the<br />

winning <strong>and</strong> working<br />

<strong>and</strong> subsequent<br />

restoration of the site<br />

permitted by<br />

ESS/08/06/BTE without<br />

compliance with<br />

Condition 32<br />

(restoration details <strong>and</strong><br />

timescale) <strong>and</strong><br />

Condition 33<br />

(Aftercare) to be<br />

completed by 31st July<br />

2007 to allow for<br />

completion of the<br />

restoration by 31<br />

December 2012.<br />

5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!