Commuter Rail
StateofCommuterRailSystem
StateofCommuterRailSystem
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
On-Time Performance<br />
South Side, Past 5 Years<br />
SOUTH SIDE ON-TIME PERFORMANCE<br />
MONTH 2011 2012 2013 2014 2015 2016<br />
Jan 80.1% 95.2% 90.2% 89.6% 89.4% 91.8%<br />
Feb 81.0% 96.3% 94.9% 89.8% 37.1% 88.0%<br />
Mar 89.7% 95.5% 93.7% 94.5% 79.5% 91.5%<br />
Apr 89.2% 95.9% 95.8% 95.3% 78.0% 91.5%<br />
May 87.9% 93.8% 94.8% 92.5% 86.3% 87.9%<br />
Jun 86.0% 93.8% 92.3% 89.9% 88.5% N/A<br />
Jul 81.9% 91.4% 93.4% 92.4% 90.5% N/A<br />
Aug 84.5% 92.5% 94.0% 92.6% 88.8% N/A<br />
Sep 92.6% 95.8% 94.9% 94.4% 90.8% N/A<br />
Oct 90.7% 94.8% 94.5% 91.5% 90.2% N/A<br />
Nov 90.7% 92.3% 91.8% 89.7% 86.3% N/A<br />
Dec 94.6% 93.4% 92.3% 92.9% 91.7% N/A<br />
Construction work<br />
has impacted Worcester<br />
Line OTP<br />
Significant events<br />
have impacted OTP:<br />
• Amtrak Forest<br />
Interlocking<br />
• Amtrak Tower 1<br />
interlocking<br />
• Amtrak Centralized<br />
Electrification and Traffic<br />
Control (CETC)<br />
dispatching<br />
• Heat restrictions on<br />
Worcester Line<br />
Source: Actual (Unadjusted) OTP Performance Percentages provided by MBTA.<br />
18