20.06.2016 Views

Commuter Rail

StateofCommuterRailSystem

StateofCommuterRailSystem

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

On-Time Performance<br />

South Side, Past 5 Years<br />

SOUTH SIDE ON-TIME PERFORMANCE<br />

MONTH 2011 2012 2013 2014 2015 2016<br />

Jan 80.1% 95.2% 90.2% 89.6% 89.4% 91.8%<br />

Feb 81.0% 96.3% 94.9% 89.8% 37.1% 88.0%<br />

Mar 89.7% 95.5% 93.7% 94.5% 79.5% 91.5%<br />

Apr 89.2% 95.9% 95.8% 95.3% 78.0% 91.5%<br />

May 87.9% 93.8% 94.8% 92.5% 86.3% 87.9%<br />

Jun 86.0% 93.8% 92.3% 89.9% 88.5% N/A<br />

Jul 81.9% 91.4% 93.4% 92.4% 90.5% N/A<br />

Aug 84.5% 92.5% 94.0% 92.6% 88.8% N/A<br />

Sep 92.6% 95.8% 94.9% 94.4% 90.8% N/A<br />

Oct 90.7% 94.8% 94.5% 91.5% 90.2% N/A<br />

Nov 90.7% 92.3% 91.8% 89.7% 86.3% N/A<br />

Dec 94.6% 93.4% 92.3% 92.9% 91.7% N/A<br />

Construction work<br />

has impacted Worcester<br />

Line OTP<br />

Significant events<br />

have impacted OTP:<br />

• Amtrak Forest<br />

Interlocking<br />

• Amtrak Tower 1<br />

interlocking<br />

• Amtrak Centralized<br />

Electrification and Traffic<br />

Control (CETC)<br />

dispatching<br />

• Heat restrictions on<br />

Worcester Line<br />

Source: Actual (Unadjusted) OTP Performance Percentages provided by MBTA.<br />

18

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!