Commuter Rail
StateofCommuterRailSystem
StateofCommuterRailSystem
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Systemwide Challenges<br />
Single track constraints and<br />
limited right-of-way<br />
• Newburyport Line, between<br />
North Beverly and Newburyport<br />
• Haverhill Line, between Reading<br />
and Andover<br />
• Old Colony Main Line, between<br />
Boston and Braintree<br />
• Worcester Line, adjacent to the<br />
Massachusetts Turnpike<br />
Drawbridge rehabilitation/<br />
replacement<br />
• Gloucester Draw<br />
• Beverly Draw<br />
• Saugus Draw<br />
• Draw 1 (North Station)<br />
Parking constraints<br />
• 25 commuter rail stations are at or over<br />
parking capacity<br />
22