21.09.2016 Views

R1 R&R Sept '16 52 cc

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Product News<br />

Kingspan TEK travels through time<br />

The Kingspan TEK<br />

Building System and<br />

Kingspan TEK Cladding<br />

Panel have been installed<br />

as part of the new Seaton<br />

Jurassic visitor centre in<br />

Devonshire, forming the<br />

gateway to the region’s<br />

historic Jurassic Coast.<br />

Kingspan TEK Delivery<br />

Partners, Glosford SIPs, erected the Kingspan TEK Building<br />

System to form the walls of the centre. The firm then installed<br />

the Kingspan TEK Cladding Panel on to a steel frame for the<br />

centre roof.<br />

The highly insulated core of the 142mm Kingspan TEK Cladding<br />

Panel and Kingspan TEK Building System panel can allow them<br />

to achieve U-values of 0.20W/m2.K and below, whilst their OSB/3<br />

facing and unique jointing system help to minimise unnecessary<br />

air loss.<br />

Both the Kingspan TEK Cladding Panel and Kingspan TEK<br />

Building System panels are now available in a 172mm thickness,<br />

delivering a minimum U-value of 0.16 W/m2.K without the need<br />

for additional insulation.<br />

Heradesign helps create a cultural icon<br />

Global advertising and<br />

marketing agencies, Ogilvy<br />

& Mather UK and MEC,<br />

have moved their creative<br />

businesses to the iconic<br />

Sea Containers on the<br />

South Bank. Collaborative<br />

working is at the heart of<br />

this ambitious project.<br />

A large-scale 200-person<br />

amphitheatre plays a prominent role in this vision. Heradesign ceilings<br />

from Knauf AMF are fitted in the amphitheatre.<br />

BDG architects Toby Neilson and Elena Angulo explained how<br />

Heradesign fulfilled the brief. “For such a key space in the building, we<br />

looked for high quality materials with natural qualities that would<br />

provide the aesthetic we wanted and the appropriate acoustic<br />

properties. Heradesign matched our architectural approach and its<br />

surface design was more contemporary and organic than other<br />

products.”<br />

Toby Neilson and Elena Angulo are thrilled with the bespoke design<br />

for Ogilvy’s London HQ and plan to use Heradesign for future projects:<br />

“Working with Heradesign and Knauf AMF has been very su<strong>cc</strong>essful.<br />

Heradesign has delivered on quality and performance.”<br />

www.kingspantek.co.uk<br />

www.knaufamf.co.uk<br />

Sarnafil Plus supports clients through regulation change<br />

Clients and facilities managers required to meet the updated<br />

Construction Design and Management Regulations (CDM<br />

2015) when embarking on a roof refurbishment need look<br />

no further than Sarnafil Plus, Sika Sarnafil’s flagship refurbishment<br />

offer.<br />

The Sarnafil Plus service is designed to actively support the client<br />

and the principal designer – a new role created by CDM 2015 –<br />

from survey and specification through to installation and guarantee,<br />

helping to ensure the refurbishment is carried out correctly.<br />

The principal designer takes on many of the duties of the old CDM<br />

coordinator role, such as planning, monitoring and coordinating<br />

health and safety in the pre-construction phase of a project. CDM<br />

2015 states that clients are responsible for the competency of the<br />

principal designer and team working on the refurbishment,<br />

especially when it comes to health and safety.<br />

The Sarnafil Plus team is made up of technical experts and<br />

dedicated surveyors to help the client through this process. Sarnafil<br />

Plus includes a detailed initial survey, as well as recommendations<br />

on complex design elements, resulting in a bespoke specification<br />

that the client can trust.<br />

In addition, the system will be installed by a Sarnafil Plus Contractor,<br />

a refurb specialist trained and verified by Sika Sarnafil. These<br />

contractors are qualified to install Sika Sarnafil membranes in<br />

complete compliance with the most up-to-date health and safety<br />

regulations.<br />

A Sarnafil Plus Field Technician making a project inspection.<br />

The Sarnafil Plus team also lends support to the principal contractor<br />

with frequent site visits and advice. A guarantee is awarded at the<br />

satisfactory completion of the refurbishment, ensuring that the<br />

client is protected against unlikely problems with the roofing<br />

system.<br />

To top it off, Sarnafil Plus includes a thorough final inspection,<br />

carried out by Sika’s nationwide team of highly experienced Field<br />

Technicians. Upon satisfactory evaluation using a 34 point checklist,<br />

the project is awarded a Sarnafil Plus guarantee that provides<br />

extensive cover for both the Sarnafil system and installation.<br />

www.sarnafilplus.co.uk<br />

10 Refurb retrofit<br />

magazine<br />

Sep/Oct 2016 <strong>R1</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!