Language Immersion Centre,<br />
Gloucester<br />
Creation of a three storey dedicated language teaching facility with construction of new<br />
steel framed and refurbishment of a grade 1 listed building owned by English Heritage<br />
Duration<br />
Value<br />
Contract Type<br />
Client<br />
Address<br />
Sector & Expertise<br />
65 Weeks<br />
£5.6m<br />
JCT Design & Build 2005<br />
Gloucestershire County Council<br />
4-6 Commercial Road, Gloucester GL1 2EA<br />
Education<br />
• Construction carried out adjacent to Blackfriars Abbey which is an<br />
ancient monument<br />
• Extensive archaeological dig was carried out prior to substructure<br />
works which resulted in the final design solution of limited<br />
destruction piling either side of roman remains<br />
• Multi stakeholder input and funding streams considered throughout<br />
project<br />
• Materials palette was of very high specification including ashlar<br />
stonework, welsh slate roof and hand-made brickwork<br />
• This project was constructed within its own footprint in a centralised<br />
urban location requiring just in time deliveries and the use of a<br />
tower crane<br />
The construction of new steel framed three storey Language<br />
Immersion Centre together with the refurbishment of a Grade 1 Listed<br />
Building owned by English Heritage.<br />
Completed predominantly in external masonry with individual feature<br />
panels, the building consists of 11 no. overnight bedrooms with ensuites<br />
on the second floor, two large open plan rooms on the first floor<br />
with smaller teaching and social spaces as well as a kitchen, fully<br />
operational cafe and dining room on the ground floor.