Leadon Bank, Ledbury<br />
52 flats and a 10 bed en-suite care ward and communal facilities whilst residents remained<br />
on site<br />
Duration<br />
Value<br />
Contract Type<br />
Client<br />
Address<br />
Sector & Expertise<br />
72 Weeks<br />
£7.20m<br />
JCT Design & Build 2011<br />
Shaw Healthcare<br />
Leadon Bank, Ledbury, HR8 1BY<br />
Residential Homes, Care Homes<br />
• Phase 1 – partial demolition of the existing care home and<br />
construction of a new build facility within the grounds<br />
• Phase 2 – occupants transferred to the new facility, demolition of<br />
the remaining building followed by extensive landscaping<br />
• The design considered trees on the existing site and the layout<br />
allowed for valuable specimens to be protected<br />
• Timber frame construction drives challenging programme<br />
commitments<br />
• The local community was fully briefed on our proposals to ensure<br />
a close working relationship with the minimisation of dust and<br />
nuisance<br />
The Project Manager for the Leadon Bank scheme – Alan Cambridge,<br />
was awarded Project Manager of the Year by the Building Safety<br />
Group.<br />
The phasing of this project was crucial to its successful delivery so we<br />
utilised a five storey timber frame to reinforce our project programme<br />
and to allow for the relocation of the existing residents to the new<br />
facility as planned.