Leadon Bank, Ledbury<br />

52 flats and a 10 bed en-suite care ward and communal facilities whilst residents remained<br />

on site<br />

Duration<br />

Value<br />

Contract Type<br />

Client<br />

Address<br />

Sector & Expertise<br />

72 Weeks<br />

£7.20m<br />

JCT Design & Build 2011<br />

Shaw Healthcare<br />

Leadon Bank, Ledbury, HR8 1BY<br />

Residential Homes, Care Homes<br />

• Phase 1 – partial demolition of the existing care home and<br />

construction of a new build facility within the grounds<br />

• Phase 2 – occupants transferred to the new facility, demolition of<br />

the remaining building followed by extensive landscaping<br />

• The design considered trees on the existing site and the layout<br />

allowed for valuable specimens to be protected<br />

• Timber frame construction drives challenging programme<br />

commitments<br />

• The local community was fully briefed on our proposals to ensure<br />

a close working relationship with the minimisation of dust and<br />

nuisance<br />

The Project Manager for the Leadon Bank scheme – Alan Cambridge,<br />

was awarded Project Manager of the Year by the Building Safety<br />

Group.<br />

The phasing of this project was crucial to its successful delivery so we<br />

utilised a five storey timber frame to reinforce our project programme<br />

and to allow for the relocation of the existing residents to the new<br />

facility as planned.