623-625 Bath Rd, Brislington<br />
The demolition of a substantial worship hall followed by the Design & Construction of<br />
52new dwellings for Sovereign Housing Association Ltd<br />
Duration<br />
Value<br />
Contract Type<br />
Client<br />
Address<br />
Sector & Expertise<br />
100 Weeks<br />
£5.85m<br />
JCT Design & Build 2011<br />
Sovereign Housing Association<br />
623-625 Bath Rd, Brislington, Bristol, BS4 3LF<br />
Affordable Housing<br />
• Demolition of a substantial worship hall<br />
• Refurbishment & Conversion of Grade II Listed Building to provide<br />
four new dwellings<br />
• Comprehensive Archaeological investigative works and watching<br />
brief during Construction Phase<br />
• 2 No five storey timber frame blocks adjacent to main road fronting<br />
site<br />
The Construction of two large timber frame structures in close proximity<br />
to both existing and new dwellings presented logistical challenges<br />
which required detailed consideration during the procurement stages of<br />
the project. These constraints influenced the sequence of works on site<br />
to ensure that the potential risks were managed.<br />
EG Carter & Co Ltd played a leading role in the procurement of this<br />
project on behalf of Sovereign HA.<br />
The site came to market in 2012 and we promptly engaged with<br />
Sovereign HA to assemble a robust bid for the site acquisition. We<br />
played a leading role in this process by identifying the key risk factors<br />
effecting viability to inform the Conditionality of the subsequent bid.