The partner of choice for all construction services<br />

E G Carter & Co Ltd.<br />

Bybrook House, Lower Tuffley Lane, Gloucester, GL2 5EE.<br />

Registered No. 00790763


Language Immersion Centre,<br />

Gloucester<br />

Creation of a three storey dedicated language teaching facility with construction of new<br />

steel framed and refurbishment of a grade 1 listed building owned by English Heritage<br />

Duration<br />

Value<br />

Contract Type<br />

Client<br />

Address<br />

Sector & Expertise<br />

65 Weeks<br />

£5.6m<br />

JCT Design & Build 2005<br />

Gloucestershire County Council<br />

4-6 Commercial Road, Gloucester GL1 2EA<br />

Education<br />

• Construction carried out adjacent to Blackfriars Abbey which is an<br />

ancient monument<br />

• Extensive archaeological dig was carried out prior to substructure<br />

works which resulted in the final design solution of limited<br />

destruction piling either side of roman remains<br />

• Multi stakeholder input and funding streams considered throughout<br />

project<br />

• Materials palette was of very high specification including ashlar<br />

stonework, welsh slate roof and hand-made brickwork<br />

• This project was constructed within its own footprint in a centralised<br />

urban location requiring just in time deliveries and the use of a<br />

tower crane<br />

The construction of new steel framed three storey Language<br />

Immersion Centre together with the refurbishment of a Grade 1 Listed<br />

Building owned by English Heritage.<br />

Completed predominantly in external masonry with individual feature<br />

panels, the building consists of 11 no. overnight bedrooms with ensuites<br />

on the second floor, two large open plan rooms on the first floor<br />

with smaller teaching and social spaces as well as a kitchen, fully<br />

operational cafe and dining room on the ground floor.


Saffron Gardens, Bristol<br />

A 48 Bed dementia care facility with 15 intermediate flats and office accommodation for<br />

Brunelcare<br />

Duration<br />

Value<br />

Contract Type<br />

Client<br />

Address<br />

Sector & Expertise<br />

64 Weeks<br />

£6.35m<br />

JCT Design & Build 2011<br />

Brunnelcare<br />

Saffron Gardens, Bristol, BS5 9FF<br />

Care Homes<br />

• Part demolition of existing care home and creation of a centralised<br />

plant room, laundry and plant room for the new and existing care<br />

home<br />

• Ground Floor – Dementia Care | First Floor – Flats | Second Floor -<br />

Offices<br />

• Project management of the planning and procurement process to<br />

ensure scheme milestones are met to secure funding<br />

• Timber frame construction drives challenging programme commitments<br />

• Knockout panels in timber frame allowed for forklift access into<br />

enclosed courtyards<br />

The project brief was to part demolish an existing care home whilst<br />

maintaining the live part of the care home and constructing a three<br />

storey multi-use facility adjacent to it.<br />

The plant, laundry and kitchen facilities were constructed as part of the<br />

phase 1 works and were shared with the old and new facilities. The<br />

old plant, laundry and kitchen facilities were then demolished to form<br />

another wing of the new facility. No interruption to these vital services<br />

occurred when implementing the changeover. The building was constructed<br />

around five sensory courtyards where different features and<br />

themes support people with memory loss.


Old Bread Street, Bristol<br />

Refurbishment of a grade 2 listed former soapworks with 11 homes for rent, 36 shared<br />

ownership and 7 Move-On homes<br />

Duration<br />

Value<br />

Contract Type<br />

Client<br />

Address<br />

Sector & Expertise<br />

67 Weeks<br />

£6.05m<br />

JCT Design & Build 2005<br />

Jephson Housing<br />

Old Bread Street, Bristol, BS2 0FF<br />

Affordable Housing<br />

• Refurbishment of Grade 2 Listed former Soapworks under the<br />

guidance of English Heritage.<br />

• Existing building in very poor condition due to dilapidation and fire<br />

damage.<br />

• 2 No five storey timber frame blocks built adjacent to existing<br />

structure.Particular attention paid to restoration of Bristol Byzantine<br />

architectural detailing.<br />

• Inner city location determines just in time deliveries from key<br />

suppliers.<br />

On inspection the former Soapworks was in a very poor condition so<br />

we instigated a complete refurbishment that utilised structural propping<br />

and a detailed build sequence that involved new storey floors and roof<br />

providing structural support.<br />

The external detailing of the building was considered very important<br />

by English Heritage so a careful restoration process led by a team of<br />

craftsmen was undertaken for which we received a Civic Award.<br />

The construction of two five-storey timber frame blocks in close<br />

proximity to the existing building presented logistical challenges which<br />

was supported by a fully detailed construction programme backed up<br />

by method statements and risk analysis.


Gainsborough Square, Bristol<br />

New build block of 28 homes and commercial units in Bristol<br />

Duration<br />

Value<br />

Contract Type<br />

Client<br />

Address<br />

Sector & Expertise<br />

52 Weeks<br />

£3.40m<br />

JCT Design & Build 2005<br />

United Communities<br />

Gainsborough Square, Bristol, BS7 9AP<br />

Affordable Housing<br />

• Slow-worm mitigation strategy carried out prior to site works<br />

commencing.<br />

• Commercial area achieved a BREEAM ‘Very Good’ rating.<br />

• Extensive consultation undertaken with local residents regarding<br />

impact of scheme.<br />

• Liaison with Local Authority regarding improvement of public realm<br />

generally in the site environs.<br />

• Detailed construction method statements and traffic management<br />

plans produced to direct contract programming in a safe and<br />

supportive manner.<br />

The flatted units were built in timber frame off an in-situ concrete<br />

transfer deck which enclosed the commercial area. The houses were<br />

constructed in timber frame which was carefully sequenced to allow a<br />

successful superstructure completion of the flatted units.<br />

The site was constructed in three distinct phases to comply with our<br />

Fire Safety Plan and Heat Load Assessment which determined safe<br />

segregation of the timber frame buildings.<br />

Gainsborough Square was a successful scheme constructed in the<br />

middle of a densely populated urban area with minimal disruption and<br />

nuisance to neighbours or the local community.


Leadon Bank, Ledbury<br />

52 flats and a 10 bed en-suite care ward and communal facilities whilst residents remained<br />

on site<br />

Duration<br />

Value<br />

Contract Type<br />

Client<br />

Address<br />

Sector & Expertise<br />

72 Weeks<br />

£7.20m<br />

JCT Design & Build 2011<br />

Shaw Healthcare<br />

Leadon Bank, Ledbury, HR8 1BY<br />

Residential Homes, Care Homes<br />

• Phase 1 – partial demolition of the existing care home and<br />

construction of a new build facility within the grounds<br />

• Phase 2 – occupants transferred to the new facility, demolition of<br />

the remaining building followed by extensive landscaping<br />

• The design considered trees on the existing site and the layout<br />

allowed for valuable specimens to be protected<br />

• Timber frame construction drives challenging programme<br />

commitments<br />

• The local community was fully briefed on our proposals to ensure<br />

a close working relationship with the minimisation of dust and<br />

nuisance<br />

The Project Manager for the Leadon Bank scheme – Alan Cambridge,<br />

was awarded Project Manager of the Year by the Building Safety<br />

Group.<br />

The phasing of this project was crucial to its successful delivery so we<br />

utilised a five storey timber frame to reinforce our project programme<br />

and to allow for the relocation of the existing residents to the new<br />

facility as planned.


AH4,5 & 6, Carterton<br />

Phased construction of 111 No. affordable homes on three separate sites, together with<br />

associated civil engineering infrastructure works.<br />

Duration<br />

Value<br />

Contract Type<br />

Client<br />

Address<br />

Sector & Expertise<br />

157 Weeks<br />

£11.55m<br />

JCT Design & Build 2005<br />

Cottsway Housing Association Ltd<br />

AH4, 5 & 6, Carterton OX28 1GF<br />

Residential Homes<br />

• AH4 – 36 Units £3.32M<br />

• AH5 – 40 Units £4.12M<br />

• AH6 – 35 Units £4.11M<br />

• The initial phase was constructed to Level 3 of the Code for<br />

Sustainable Homes whilst the remaining phases were constructed<br />

to Level 4.<br />

• Each of the dwellings were constructed using recognised forms of<br />

MMC and adopted a fabric first approach to compliance with the<br />

energy standards defined by the Code criterion.<br />

Very close co-operation with neighbouring owners to ensure that<br />

deliveries were scheduled out of key transit times and that designated<br />

parking areas were utilised for all site traffic.<br />

E G Carter & Co Ltd led the design, value and risk engineering and<br />

full construction services with team assembled pre-planning to drive<br />

a modern design palette on a traditional speculative development to<br />

differentiate sales potential and achieve best value.<br />

The original density was 102 dwellings which was maximised under the<br />

E G Carter & Co Ltd design team to 111 dwellings.


623-625 Bath Rd, Brislington<br />

The demolition of a substantial worship hall followed by the Design & Construction of<br />

52new dwellings for Sovereign Housing Association Ltd<br />

Duration<br />

Value<br />

Contract Type<br />

Client<br />

Address<br />

Sector & Expertise<br />

100 Weeks<br />

£5.85m<br />

JCT Design & Build 2011<br />

Sovereign Housing Association<br />

623-625 Bath Rd, Brislington, Bristol, BS4 3LF<br />

Affordable Housing<br />

• Demolition of a substantial worship hall<br />

• Refurbishment & Conversion of Grade II Listed Building to provide<br />

four new dwellings<br />

• Comprehensive Archaeological investigative works and watching<br />

brief during Construction Phase<br />

• 2 No five storey timber frame blocks adjacent to main road fronting<br />

site<br />

The Construction of two large timber frame structures in close proximity<br />

to both existing and new dwellings presented logistical challenges<br />

which required detailed consideration during the procurement stages of<br />

the project. These constraints influenced the sequence of works on site<br />

to ensure that the potential risks were managed.<br />

EG Carter & Co Ltd played a leading role in the procurement of this<br />

project on behalf of Sovereign HA.<br />

The site came to market in 2012 and we promptly engaged with<br />

Sovereign HA to assemble a robust bid for the site acquisition. We<br />

played a leading role in this process by identifying the key risk factors<br />

effecting viability to inform the Conditionality of the subsequent bid.


623-625 Bath Rd ,Brislington<br />

Upon acceptance of the offer, we advised upon the appropriate<br />

wording for the HoT’s, including timescales for addressing the<br />

Conditionality of the offer.<br />

Contracts were Exchanged, Conditional upon Ground Conditions<br />

and Planning Permission and our attention quickly turned to the pre<br />

development and procurement programme requirements to ensure<br />

compliance with the obligations.<br />

Upon Completion of the ground investigation works it became apparent<br />

that the substructure design parameters would attract significant cost.<br />

We presented this information in an open and transparent manner<br />

for consideration and the Vendor appointed a 3rd party Engineer to<br />

substantiate our findings.<br />

A round table discussion was convened with the Vendor and their<br />

Engineer during which an agreement was reached to adjust the land<br />

value to reflect the abnormal ground conditions.<br />

The procurement programme steered the procurement of the planning<br />

process including co-ordination of the various surveys required in<br />

support of the planning application. All surveys were commissioned<br />

and coordinated by EG Carter and circulated amongst the project team<br />

with clear recommendations.<br />

In conjunction with the Planning Consultant appointed by Sovereign<br />

HA, we were able to ensure that an implementable Planning<br />

Permission was secured to enable commencement of physical works<br />

promptly. This aided cash flow and reduced the burden of holding costs<br />

for Sovereign HA.<br />

The project is at an advance stage with the first phase of handovers<br />

scheduled imminently. Practical Completion is scheduled in advance of<br />

the Contract Completion Date and based upon the robust approach to<br />

the handover process, we are confident this will be achieved.


AH4,5 & 6, Carterton<br />

Phased construction of 111 No. affordable homes on three separate sites, together with<br />

associated civil engineering infrastructure works.<br />

Duration<br />

Value<br />

Contract Type<br />

Client<br />

Address<br />

Sector & Expertise<br />

157 Weeks<br />

£11.55m<br />

JCT Design & Build 2005<br />

Cottsway Housing Association Ltd<br />

AH4, 5 & 6, Carterton OX28 1GF<br />

Residential Homes<br />

• AH4 – 36 Units £3.32M<br />

• AH5 – 40 Units £4.12M<br />

• AH6 – 35 Units £4.11M<br />

• The initial phase was constructed to Level 3 of the Code for<br />

Sustainable Homes whilst the remaining phases were constructed<br />

to Level 4.<br />

• Each of the dwellings were constructed using recognised forms of<br />

MMC and adopted a fabric first approach to compliance with the<br />

energy standards defined by the Code criterion.<br />

Very close co-operation with neighbouring owners to ensure that<br />

deliveries were scheduled out of key transit times and that designated<br />

parking areas were utilised for all site traffic.<br />

E G Carter & Co Ltd led the design, value and risk engineering and<br />

full construction services with team assembled pre-planning to drive<br />

a modern design palette on a traditional speculative development to<br />

differentiate sales potential and achieve best value.<br />

The original density was 102 dwellings which was maximised under the<br />

E G Carter & Co Ltd design team to 111 dwellings.


St Peter’s Catholic Primary<br />

School, Gloucester<br />

A BREEAM excellent cross laminate timber building constructed alongside the existing<br />

school<br />

Duration<br />

Value<br />

Contract Type<br />

Client<br />

Address<br />

Sector & Expertise<br />

84 Weeks<br />

£8.4m<br />

JCT Design & Build<br />

Gloucestershire County Council<br />

Horton Road, Gloucester, GL1 3PY<br />

Education<br />

• Royal Institute British Architect South West award winning project<br />

• Largest cross laminate timber frame project to be constructed in<br />

the South West of England<br />

• Delivered achieving British Research Establishment Environmental<br />

Assessment Method (BREEAM) excellent standards for<br />

sustainability<br />

• Constructed adjacent to existing school which then decanted and<br />

demolition commenced<br />

The new key stage 1 and 2 primary school provides approximately<br />

2800sqm of usable floor space and was delivered for a multi stake<br />

holder group including Governors of the school, Catholic Diocese,<br />

Gloucestershire County Council and an independent nursery provider.<br />

Set on two levels, it was constructed using prefabricated timber frame<br />

with external cedar cladding.<br />

The building creates seven, key stage 2, and four, key stage 1,<br />

classrooms with a bespoke and adaptable centre, providing one large<br />

or three separate learning environments.


50-54 Radnor Street, Swindon<br />

19 No New Flats for Rent and Shared Ownership<br />

Duration<br />

Value<br />

Contract Type<br />

Client<br />

Address<br />

Sector & Expertise<br />

52 Weeks<br />

£1.6m<br />

JCT Design & Build<br />

Stonewater Housing Association<br />

50-54 Radnor Street, Swindon SN1 3PR<br />

Residential<br />

• Enabling works included the demolition of an existing building<br />

adjacent to a building manufacturing microchips in a 24 hour<br />

production cycle which were sensitive to vibration and dust.<br />

• We set up monitoring equipment to ensure that no nuisance was<br />

caused in the construction of a basement utilising vibration free<br />

sheet piling system.<br />

• Basement construction formed in reinforced concrete including<br />

Ruberoid tanking systems and permanent sheet pile formwork.<br />

• A PCC floor spanned the basement and provided the decking<br />

for the superstructure that was constructed in timber frame for<br />

programme enhancement.<br />

• Project constructed in very densely populated residential area of<br />

Swindon.<br />

• JIT ‘Just in Time’ deliveries utilised through local builders<br />

merchants due to lack of site storage and inaccessibility of site for<br />

articulated vehicles.<br />

The project involved basement construction that was formed by a<br />

vibration-free sheet piling system to eliminate nuisance to the adjoining<br />

property.


E G Carter & Co Ltd.<br />

Bybrook House, Lower Tuffley Lane, Gloucester, GL2 5EE.<br />

Registered No. 00790763