Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
A Vision for St Chad’s<br />
I<br />
am writing this in early<br />
August. The building<br />
works at the church have<br />
been going on for a month<br />
now and the place is a<br />
mess. Outside on the drive is<br />
a skip absolutely full of rubble<br />
and detritus from the church.<br />
The completion of the project,<br />
scheduled for February 2017<br />
still feels a very long way off. It<br />
is a challenge to hold the vision<br />
of the completed building when<br />
the present situation is dust and<br />
destruction.<br />
But a vision there is, and it<br />
is a vision that had driven the<br />
tremendous generosity of the<br />
church that enabled us to raise the<br />
remarkable sum of £435,000. So<br />
when the church is completed, what will<br />
it enable us to do differently?<br />
St Chad’s Church is just over <strong>10</strong>0<br />
years old. Throughout its history it<br />
has been altered and added to but<br />
never with an overarching grand plan.<br />
The result is a church building that is<br />
dearly loved by those who worship but<br />
which also has its quirks and is need of<br />
considerable modernisation.<br />
The most pressing need for the church<br />
was to ensure that it was accessible<br />
for all. We believe that God’s grace<br />
and mercy are available to all and our<br />
building needed to refl ect that. New<br />
ramps inside and out will ensure that<br />
the worship area and meeting rooms will<br />
be accessible for those with impaired<br />
mobility. New toilets are to be fi tted<br />
within the body of the church, including a<br />
disabled toilet.<br />
Another need for the church was<br />
fl exibility. Gone are the days when<br />
a church building was only used for<br />
Sunday morning worship. As well as<br />
our two Sunday services (both of which<br />
are very different in style) the building is<br />
used by schools and for music concerts<br />
as well as by a variety of church and<br />
other groups. The building needed to<br />
be able to accommodate these different<br />
uses by increasing the number of<br />
meeting areas, improving our kitchen<br />
facilities and increasing the size of our<br />
parish offi ce. A new mezzanine fl oor is<br />
being built which we hope will provide<br />
better space for our youth work.<br />
But above all, the vision of St<br />
Chad’s is to be a church that worships<br />
and serves and the new building will<br />
give us far more opportunities to do<br />
this. I believe that the interior of the<br />
church will look truly beautiful with the<br />
font and war memorial relocated to<br />
dedicated remembrance and initiation<br />
spaces. There will be new lighting,<br />
new carpets and better sight lines<br />
St Chad’s Church, Linden Avenue, Woodseats<br />
Church Offi ce: 9 Linden Avenue, Sheffi eld S8 0GA<br />
Tel: (0114) 274 5086<br />
Page 12<br />
email: offi ce@stchads.org<br />
website: www.stchads.org