15.11.2016 Views

Rebuilding with Resilience

dw0r306aHfX

dw0r306aHfX

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

THE PROPOSAL<br />

The Hunts Point Lifelines proposal looked at different ways to build the resilience of the Hunts Point peninsula,<br />

including measures to enhance flood protection, build economic resilience, enhance transportation and other<br />

infrastructure, and create redundancies using maritime routes. The design team looked at options for protecting<br />

critical assets in the region including the Food Distribution Center, local businesses, and the wastewater treatment<br />

plant. To do so, the proposal called for four integrated components, called “Lifelines”:<br />

• Lifeline 1: Integrated Flood Protection: This lifeline called for the combination of a protective levee,<br />

wetland system, and an integrated greenway, that would protect critical assets from a 100-year flood event<br />

and also allow for integration of additional protective measures to account for future sea-level rise. “Levee<br />

labs” would be created to support additional research and to develop innovative flood protection approaches<br />

and to scale up flood resilience investments in the region. The central goal of this component was to keep the<br />

food distribution center online and operational during a storm and to allow continued access for the 20,000<br />

trucks that travel to and from the center weekly. The proposal also envisioned alignment of the flood protection<br />

measures <strong>with</strong> future phases of the “South Bronx Greenway” (a project that has been planned since 2005 and is<br />

being designed to create safer connections between residential neighborhoods, the waterfront, and commercial<br />

areas). In addition to the flood protection measures, this lifeline also called for the incorporation of habitat<br />

restoration and green infrastructure approaches for managing stormwater behind flood protection structures.<br />

Proposed Hunts Point Levee<br />

This rendering depicts the proposal's call for flood protection to be integrated <strong>with</strong> recreational amenities like bike lanes.<br />

82 Chapter 7: Hunts Point Lifelines | <strong>Rebuilding</strong> <strong>with</strong> <strong>Resilience</strong> GEORGETOWN CLIMATE CENTER

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!