Project Title : Hull Venue<br />

Bill Title : General Requirements & Preliminaries<br />

Pricing Schedule<br />

General<br />

Requirements &<br />

Preliminaries<br />

Part Nr 3<br />

PAGE<br />

NUMBER<br />

3/3<br />

Ref<br />

Description<br />

Quantity Unit Rate<br />

Amount<br />

GBP £<br />

GENERAL REQUIREMENTS (Continued)<br />

In addition to the Employers Requirements (Part A)<br />

please include the costs for the following items:<br />

A Contract Requirements 1 Item Noted<br />

B Dewatering (if applicable) 1 Item Works Package<br />

C Insurances - Based On Kier Prelims & Design Fees 1 Item 21,739.00 21,739.00<br />

D Project sign boards 1 Item 2,200.00 2,200.00<br />

E Contractor's Design Fees 1 Item 864,500.00 864,500.00<br />

All rates included in this Pricing Schedule are deemed<br />

to have included overheads and profit. In the event of<br />

Compensation Event where a similar rate is not available<br />

please include an overheads and profit % below for each<br />

of the various scenarios.<br />

F Overhead & Profit for Contractor Supply and Install items 4.95 % Rate Only<br />

G<br />

Overhead & Profit for MEP Sub-Contractor Supply and<br />

Install items 4.95 % Rate Only<br />

H Overhead & Profit for Supply and Install items by others 4.95 % Rate Only<br />

J Overhead & Profit for Installation only (supply by others) 4.95 % Rate Only<br />

K Overhead & Profit for Provisional Items 4.95 % Rate Only<br />

The contractor is to make allowance for any<br />

other items to complete the works which are<br />

not referred to above but are shown on the<br />

drawings, specification and other documents or<br />

that can be reasonably inferred there from. The<br />

Contractor is to itemise and give full details of<br />

any additional items which are to be carried out<br />

in accordance with the provisions of the<br />

contract.<br />

L Gateman 1 Item 74,250.00 74,250.00<br />

M ……………………………………………………………… 1 Item -<br />

N ……………………………………………………………… 1 Item -<br />

Total - GBP £<br />

Carried to Collection Page..<br />

962,689.00