Project Title : Hull Venue<br />
Bill Title : Schedule of Cost Components<br />
Pricing Schedule<br />
SCHEDULE OF<br />
COST<br />
COMPONENTS<br />
Part Nr 6<br />
PAGE<br />
NUMBER<br />
6/1<br />
Ref<br />
Description<br />
Quantity Unit Rate<br />
Amount<br />
GBP £<br />
SCHEDULE OF COST COMPONENTS<br />
General Note<br />
The items detailed below are for amounts in the headings<br />
People, Equipment and Plant and Materials as listed in the<br />
Cost Components section of the Contract.<br />
Amounts for Charges, Manufacture and Fabrication, Design<br />
and Insurance are to be detailed in the relevant section of the<br />
Contract Data Part 2<br />
1. People<br />
A Labourer (unskilled) 1 Hr 9.46 Rate Only<br />
B Labourer (skilled) 1 Hr 10.26 Rate Only<br />
C Steel fixer 1 Hr 15.96 Rate Only<br />
D Bar bender 1 Hr 15.96 Rate Only<br />
E Welder; uncoded 1 Hr 13.75 Rate Only<br />
F Welder; coded 1 Hr 18.24 Rate Only<br />
G Transport driver 1 Hr 12.54 Rate Only<br />
H Plant operator 1 Hr 13.68 Rate Only<br />
J Mason/Brick/Blocklayer 1 Hr 14.82 Rate Only<br />
K Carpenter/Joiner 1 Hr 13.68 Rate Only<br />
L Plumber/Pipe Fitter 1 Hr 14.82 Rate Only<br />
M Plasterer/Tile Fixer 1 Hr 12.54 Rate Only<br />
N Painter 1 Hr 11.40 Rate Only<br />
P Fitter/Mechanic 1 Hr 14.82 Rate Only<br />
Q Charge hand Electrician 1 Hr 19.38 Rate Only<br />
R Electrician 1 Hr 14.25 Rate Only<br />
S Electrician's Mate 1 Hr 9.46 Rate Only<br />
T Cable Jointer 1 Hr 15.96 Rate Only<br />
Total - GBP £<br />
Carried to Collection Page..<br />
Rate only