Project Title : Hull Venue<br />
Bill Title : Pre-Construction Services<br />
Pricing Schedule<br />
Pre-Construction<br />
Services<br />
Part Nr 4<br />
PAGE<br />
NUMBER<br />
4/2<br />
Ref<br />
Description<br />
Quantity<br />
Unit Rate GBP £<br />
PRE CONSTRUCTION SERVICES (continued)<br />
<strong>Commercial</strong><br />
A <strong>Commercial</strong> Manager 6.4 wks 2,078.00 13,299.20<br />
B Quantity Surveyor wks N/A<br />
Others<br />
C Document Controller - <strong>KIER</strong> OVERHEAD wks Overhead<br />
D Secretary / Assistant - <strong>KIER</strong> OVERHEAD wks Overhead<br />
E Office Manager - <strong>KIER</strong> OVERHEAD wks Overhead<br />
F Logistics Manager - <strong>KIER</strong> OVERHEAD wks Overhead<br />
The contractor is to make allowance for any<br />
other items to complete the requirements which are<br />
not referred to above but are required to undertake the<br />
Pre-construction Services.<br />
The Contractor is to itemise and give full details of<br />
any additional items which are to be carried out<br />
in accordance with the provisions of the<br />
contract.<br />
G Building Services Manager 1 Item 6,586.00 6,586.00<br />
H Senior Planner 1 Item 4,675.00 4,675.00<br />
I Senior Estimator - <strong>KIER</strong> OVERHEAD 1 Item Overhead<br />
J Mechanical & Electrical Engineering 1 Item 62,500.00 62,500.00<br />
K ……………………………………………………………… 1 Item -<br />
L ……………………………………………………………… 1 Item -<br />
M ……………………………………………………………… 1 Item -<br />
Total - GBP £<br />
Carried to Collection Page..<br />
87,060.20