Project Title : Hull Venue<br />

Bill Title : Pre-Construction Services<br />

Pricing Schedule<br />

Pre-Construction<br />

Services<br />

Part Nr 4<br />

PAGE<br />

NUMBER<br />

4/2<br />

Ref<br />

Description<br />

Quantity<br />

Unit Rate GBP £<br />

PRE CONSTRUCTION SERVICES (continued)<br />

<strong>Commercial</strong><br />

A <strong>Commercial</strong> Manager 6.4 wks 2,078.00 13,299.20<br />

B Quantity Surveyor wks N/A<br />

Others<br />

C Document Controller - <strong>KIER</strong> OVERHEAD wks Overhead<br />

D Secretary / Assistant - <strong>KIER</strong> OVERHEAD wks Overhead<br />

E Office Manager - <strong>KIER</strong> OVERHEAD wks Overhead<br />

F Logistics Manager - <strong>KIER</strong> OVERHEAD wks Overhead<br />

The contractor is to make allowance for any<br />

other items to complete the requirements which are<br />

not referred to above but are required to undertake the<br />

Pre-construction Services.<br />

The Contractor is to itemise and give full details of<br />

any additional items which are to be carried out<br />

in accordance with the provisions of the<br />

contract.<br />

G Building Services Manager 1 Item 6,586.00 6,586.00<br />

H Senior Planner 1 Item 4,675.00 4,675.00<br />

I Senior Estimator - <strong>KIER</strong> OVERHEAD 1 Item Overhead<br />

J Mechanical & Electrical Engineering 1 Item 62,500.00 62,500.00<br />

K ……………………………………………………………… 1 Item -<br />

L ……………………………………………………………… 1 Item -<br />

M ……………………………………………………………… 1 Item -<br />

Total - GBP £<br />

Carried to Collection Page..<br />

87,060.20