Project Title : Hull Venue<br />

Bill Title : Schedule of Cost Components<br />

Pricing Schedule<br />

SCHEDULE OF<br />

COST<br />

COMPONENTS<br />

Part Nr 6<br />

PAGE<br />

NUMBER<br />

6/4<br />

Ref<br />

Description<br />

Quantity Unit Rate<br />

Amount<br />

GBP £<br />

SCHEDULE OF COST COMPONENTS (continued)<br />

3. Plant and Materials<br />

A Ordinary Portland cement (or equivalent) 1 ton 118.00 Rate Only<br />

B Sulphate resisting cement (or equivalent) 1 ton 166.00 Rate Only<br />

C Coarse aggregate (dry) 1 ton 15.50 Rate Only<br />

D Fine aggregate (dry) 1 ton 19.90 Rate Only<br />

E Ready mix concrete (Grade 40) delivered to site 1 m3 78.15 Rate Only<br />

F Reinforcement bars (high yield, deformed) 1 ton 385.00 Rate Only<br />

G Steel fabric reinforcement to BS 4483, square mesh B1131 60 m2 306.00 Rate Only<br />

H 100mm thick hollow blocks 10 nr 9.65 Rate Only<br />

J 200mm thick hollow blocks 10 nr 19.30 Rate Only<br />

K Plasterboard (12.7mm thick) 10 m2 21.67 Rate Only<br />

L Emulsion paint 10 ltr 15.88 Rate Only<br />

M Enamel paint 10 ltr 21.20 Rate Only<br />

N Intumescent Fireproofing Paint (1 hr rating) 1 m2 5.83 Rate Only<br />

P Intumescent Fireproofing Paint (2 hr rating) 1 m2 9.59 Rate Only<br />

Q Cementitious Fireproofing Application (1 hr rating) 1 m2 13.02 Rate Only<br />

R Cementitious Fireproofing Application (2 hr rating) 1 m2 14.97 Rate Only<br />

Total - GBP £<br />

Carried to Collection Page..<br />

Rate Only