23.12.2016 Views

CCNA Routing and Switching

HuPe306583u

HuPe306583u

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

VLAN Trunking Protocol 927<br />

virtual data center vendors, 735<br />

VMs, 734<br />

switches (vSwitches), 735<br />

VLANs (virtual LANs)<br />

configuration<br />

data <strong>and</strong> voice VLANs, 36-38<br />

database, VTP synchronization,<br />

125-126<br />

full VLAN configuration<br />

example, 25-28<br />

overview, 24-25<br />

shorter VLAN configuration<br />

example, 28-29<br />

trunking, 30-34<br />

database, switches synchronization,<br />

131-133<br />

default, 25<br />

enabling/disabling, 115<br />

IDs, 18<br />

incoming frames, choosing, 112-113<br />

interfaces. See SVIs<br />

IP telephony, 34<br />

data <strong>and</strong> voice VLAN concepts,<br />

34-36<br />

data <strong>and</strong> voice VLAN<br />

configuration <strong>and</strong> verification,<br />

36-38<br />

summary, 38-39<br />

LAN support, adding, 122<br />

mismatched native on trunks, 118<br />

mismatched supported trunk lists,<br />

117-118<br />

native, 20, 525-526<br />

overview, 16-18<br />

routing. See VLAN routing<br />

SPAN monitoring, 721<br />

st<strong>and</strong>ard range, 123<br />

tagging, 18-20<br />

troubleshooting<br />

access interfaces, 113-114<br />

frame switching process<br />

problems, 113<br />

undefined/disabled VLANs,<br />

114-115<br />

trunking<br />

802.1Q, 20-21<br />

configuration, 30-34<br />

disabling, 139<br />

ISL (Inter-Switch Link), 20-21<br />

overview, 18<br />

protocol. See VTP<br />

troubleshooting, 113-118<br />

VLAN tagging, 18-20<br />

vlan 10 comm<strong>and</strong>, 122<br />

vlan 200 comm<strong>and</strong>, 137<br />

vlan comm<strong>and</strong>, 25, 37, 40, 135<br />

VLAN routing, 21<br />

Layer 3 EtherChannels<br />

configuring, 537-539<br />

troubleshooting, 541<br />

verifying, 539-540<br />

Layer 3 switch routed ports, 23-24,<br />

534-537<br />

Layer 3 switching with SVIs<br />

configuring, 529-531<br />

troubleshooting, 532-534<br />

verifying, 531<br />

ROAS, 524<br />

configuration, 524-526<br />

troubleshooting, 528-529<br />

verifying, 526-527<br />

routers, 21-23<br />

VLAN Trunking Protocol. See VTP

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!