The implementation process is as follows:<br />

Requirement analysis and project planning<br />

The project started on 09-06-2015 and the first phase was analyze the requirements like<br />

Who will be the end user and what total expected duration for completion of project .There were<br />

several meeting conducted with project-in-charge.<br />

For project planning there were two modules<br />

Admin module<br />

User module<br />

Design<br />

The second phase of the implementation was design phase. In this phase before the<br />

coding the DFD, Database Design were done.<br />

Coding<br />

The coding phase is the next phase in the model. The coding was done with the visual<br />

basics 6.0 which handled the front end and MS SQL SERVER 2008 handles the backend.<br />

Testing<br />

Once the coding phase gets completed the next major phase was the testing phase.<br />

System testing was conducted against the requirements and almost all of the requirements got<br />

satisfied.<br />

Implementation<br />

The final phase of the project is the implementation . The project was implemented and<br />

worked correctly in the local system.<br />

Front End Description