11.12.2012 Views

Newmarket Theatre Operating and Procedures Manual

Newmarket Theatre Operating and Procedures Manual

Newmarket Theatre Operating and Procedures Manual

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Rigging<br />

Motorized Pipes: 3 Sets rated at 1000 pounds with control located Stage Right<br />

<strong>Manual</strong> Winch: 1 Set rated at 800 pounds with winch located Stage Left<br />

PLEASE NOTE: Our rigging systems can not be used to carry performers. None of our<br />

rigging equipment is rated to carry people. For shows where performers are to be flown (e.g.<br />

Peter Pan), you must use a recognized company in this field (e.g. “Flying by Foy”, “ZFX!”) to<br />

accomplish the flying effects. THERE ARE NO EXCEPTIONS TO THIS POLICY!<br />

Soft Goods: White Bounce (cyc) 42’ X 26’ Dead Hung at rear of stage<br />

Black Velour Traveller Dead Hung in front of Bounce<br />

Black Velour Traveller Dead Hung at Mid Stage<br />

10 X 8’ X 27’ Black Comm<strong>and</strong>o Cloth Leg (5 sets deployed)<br />

1 X 10’ X 27’ Black Velour Masking Panel<br />

4 X 42’ X 4’ Black Velour Border<br />

1 X 30’ X 20’ Black Sharkstooth Scrim<br />

Burgundy Velour Main Drape (Traveller with valance) Powered draw<br />

operated from Stage Right or control room. <strong>Manual</strong> operation of curtain is<br />

possible from Stage Right.<br />

Power<br />

Lighting: 1 X 100 Amp 3 Ø 5 Wire Disconnect with cable lugs located Stage<br />

Right<br />

Audio: 1 X 60 Amp 3 Ø 5 Wire Disconnect with cable lugs located Stage<br />

Right<br />

Stove Plug: 1 X 50 Amp Stove Plug Connection located in Shipping/Receiving<br />

area (This connection is about 20 feet from the stage. There is a<br />

bulkhead pass-through to allow cable to be run to the stage area.)<br />

PLEASE NOTE: If your production requires tying into disconnects, you will need to arrange a<br />

wiring inspection in advance with the Electrical Safety Authority. Wiring inspections are<br />

m<strong>and</strong>atory for any temporary power tie-in in Ontario.<br />

33

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!